• About
  • BRINSTON/SOUTH BRANCH/NORTH DUNDAS/NORTH STORMONT
  • Donate!
  • Ottawa’s “Energy Evolution”: wind turbines coming to rural communities
  • Wind Concerns Ontario

Ottawa Wind Concerns

~ A safe environment for everyone

Ottawa Wind Concerns

Tag Archives: MOECC

A tale of two wind ‘farms’: betrayal and discrimination

04 Monday Jun 2018

Posted by ottawawindconcerns in Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

environment, Francophone, French language Ontario, language rights, MInistry of the Environment and Climate Change, MOECC, wind farm, wind power, wind turbines

June 4, 2018

Prior to the suspension*of Ontario’s “Large Renewable Procurement I” or LRP I, the government program to procure contracts for renewable power from solar and wind energy, five contracts were awarded in 2016 for new wind power projects.

Two of those were in the Ottawa area: the “Eastern Fields” project proposed by RES Canada in La Nation, the Township of Champlain and the United Counties of Prescott Russell, and “Nation Rise” proposed by Portugal-based EDPR.

Those projects are all now in the process toward approval and ultimate construction, in spite of the fact that the contracting authority, the Independent Electricity System Operator or IESO, says now that Ontario has surplus power for the forseeable future, and the fact that the communities do not unanimously support these power projects.

Let’s catch up with where the projects are right now.

Nation Rise, North Stormont

Concerned Citizens of North Stormont leader Margaret Benke : power not needed, plenty of environmental dangers ahead

This project was granted a Renewable Energy Approval or REA a few weeks ago, just days before the writ for the 2018 provincial election was drawn up. (The government is not allowed to make any major decisions after the writ.) The announcement came at 5 PM on a Friday; the community had 15 days to decide whether to appeal the REA, five days of those were on weekends, which restricts the ability of community members to consult with lawyers and subject matter experts.

The Concerned Citizens of North Stormont has decided to appeal, and a first appearance before the Environment Review Tribunal will be June 25 in Finch (to be confirmed).

There are a number of environmental concerns, principally the fact that the project will be located on what is designated a “highly vulnerable aquifer” — the Raisin-South Nation Protection Area serves 10,000 water wells. After the reports of disturbed and failed wells in Chatham-Kent during and following construction of a wind power project there, citizens in North Stormont are very worried about what could happen to their wells.

The other issue is noise: many residents will be exposed to the noise emissions coming from the more than 30 industrial-scale wind turbines planned for the area. Here’s the kicker: Ontario knew its noise assessment protocol for wind turbines was flawed so it revised the guidelines, and released a new document in April 2017. But, the five newest wind power projects don’t have to abide by them, instead using a “transitional” process, in spite of the fact their wind turbines are not yet purchased or built. A legal action on behalf of four community groups, North Stormont among them, is in process.

The wind power project will “have a huge impact on our communities,” said Concerned Citizens spokesperson Margaret Benke in a recent news release. North Stormont feels particularly betrayed because the current Premier told Ontario rural residents that wind power projects would not be put in areas that didn’t want them — a contract was awarded anyway, and last week the Premier, on a whirlwind election campaign tour that included North Stormont, was asked about that. She said “We had no choice.”

Listen to Wind Concerns Ontario president Jane Wilson here, in an interview with Bell Media’s Evan Solomon on the project.

This community group has started a GoFundMe effort to raise funds to defend the community, and they need help. Go to the GoFundMe link here: https://ca.gofundme.com/stop-wind-turbines-in-northstormont

Eastern Fields

Save The Nation protester: the MOECC and RES Canada don’t understand “Non”

This power project was in the mandated comment period which ended June 2nd, Saturday. The Ministry of the Environment and Climate Change (MOECC) says that consultation with the public is very important to the renewable energy process and that the comments from the public are welcome and valued.

That’s why all the documents were available in English only, in communities that are at least 60-percent francophone.

When pressed by residents and the community group Sauvons La Nation, the power developer RES Canada — which stands to make about $7 million a year–  said it would cost too much to translate the documents.

Apparently now, the MOECC says that francophone residents should have responded by the June 2nd deadline to say they need the French documentation and to request an extension to the deadline. Why wasn’t the information provided in the appropriate language in the first place, instead of discriminating against the francophone community?

There are environmental concerns with this power project as well, as it is close to the Alfred Bog, a site for migratory birds and other wildlife (Hint: migratory birds don’t count in Ontario — the wind power legislation, crafted by the industry, says that a species has to be on the edge of extinction before a wind power project could be denied).

There are concerns about water in the area as well, as it is rife with waterways, and also features areas of Leda clay or “quick” clay (as does North Stormont).

Noise will also be an issue for residents. Meanwhile, RES Canada, which also operates the Talbot wind power project, has had hundreds of complaints of excessive noise from the wind turbines, with no action taken by the MOECC.

Betrayal? Again, the Ontario government promised it would not inflict power projects on unwilling communities but again, it has. In this case, the gigantic turbines are all planned to be on land owned by members of a single family, involved in agriculture.

 

*The LRP/wind power program was suspended, which means, if the current government returns to power, or another is elected that also supports wind power, it could be revived and continue.

Advertisement

Ottawa resident’s case goes to court with charges against government on environment

15 Tuesday May 2018

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

environment, MInistry of the Environment and Climate Change, MOECC, wind farm, wind turbine noise

A private citizen alleges the Minister of the Environment and Climate Change has violated terms of the Environmental Protection Act

Wind turbine near Brinston, south of Ottawa: citizen noise reports unresolved [Photo: Ray Pilon]

May 15, 2018

A resident of North Gower in the City of Ottawa is represented by lawyers in a Toronto court Thursday with a charge against Chris Ballard for violating a section of the Environmental Protection Act. Mr. Ballard is Ontario’s minister of Environment and Climate Change.

Using a little known legal option available to citizens known as a private prosecution, Jane Wilson has charged Mr. Ballard with “causing or permitting the discharge of a contaminant, namely noise, into the natural environment that has caused, or may cause an adverse effect.”

“I am not taking this step lightly,” Wilson says, “this is very serious. But with thousands of reports of excessive noise from wind turbines unresolved in Ontario, and more new power projects planned, I had no choice. He is responsible for allowing the noise to continue to be discharged into the environment.”

Wilson, a Registered Nurse, is president of Wind Concerns Ontario, a coalition of 30 community groups and individuals and families concerned about the negative impacts of utility-scale wind power generation projects. She is also the chair of local community group, Ottawa Wind Concerns, which battled a wind power project proposed for North Gower. That project would have exposed hundreds of families to noise from wind power generators or turbines placed close to the rural village.

People forced to live near wind power projects are going without sleep for days, weeks, even months because of wind turbine noise, Wilson says. Documents provided to Wind Concerns Ontario under Freedom of Information show that the government has received more than 4,500 formal reports of excessive noise from wind turbines since 2006, but responds to about 7 percent of the complaints.

“Sleep disturbance has been confirmed as a link to other health problems such as high blood pressure and diabetes,” says Wilson. “Staff notes in these reports contain reference to health impacts in about 35 percent of the complaints.”

“I am just trying to do whatever I can to get some help for these people.”

The MOECC just gave Renewable Energy Approval to a 100-megawatt project in North Stormont, south-east of Ottawa, despite environmental concerns about noise and impact on the “vulnerable aquifer” that serves 10,000 wells in the area.

The charge against Mr. Ballard was signed by a Justice of the Peace in Toronto and the first appearance in the matter is in Toronto, May 17 at 9 a.m. at the Toronto East provincial courthouse. Wilson will be represented by Andrew Chachula of environmental law firm Eric K. Gillespie, in Toronto.

Contact: president@windconcernsontario.ca

Wind Concerns Ontario report on MOECC response to noise reports: Second Report Noise Complaints February 2018-FINAL

References: Environmental Protection Act Section 14 (1) and (2)

Adverse effect definition EPA 1 (1)

 

Ottawa area citizen groups to sue Ontario over wind turbine noise

28 Sunday Jan 2018

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Concerned Citizens of North Stormont, Eric Gillespie, MOECC, Ontario Ministry of the Environment and Climate Change, Ottawa wind farms, wind energy, wind farm, wind farm noise, wind power, wind turbine noise

CBC.ca

Citizens sue province over proposed industrial wind turbine projects

Groups allege 5 wind power projects are allowed to defy safe noise limits

By Amanda Pfeffer, CBC News Posted: Jan 28, 2018 6:20 AM ETLast Updated: Jan 28, 2018 6:20 AM ET

Citizens living near five proposed wind turbine parks in Ontario have launched a lawsuit alleging the provincial government is allowing the companies behind the projects to defy safe noise limits.

The province approved the wind park projects in 2016. They are scattered around rural Ontario, and two are within an hour’s drive from Ottawa.

The projects are now going through a “technical review” as part of the final approval process by the Ontario Ministry of Environment and Climate Change.

  • Wind turbines approved for eastern Ontario despite objections

In 2016, the Ontario government also introduced new and more accurate standards for how companies model the noise impact of turbines before they’re built.

Map of wind turbine impact, Eastern Fields Wind Power Project

Map depicting range of impacts of wind turbines for Eastern Fields project near St Bernardin and St Isidore, east of Ottawa [Photo: Radio-Canada]

Suit alleges standards out of date

The lawsuit, however, alleges the proponents behind the five projects have been using old modelling standards.

“It appears that the majority of proposed turbine sites are out of compliance with the [new] requirements,” states the suit, which has been filed with the Ontario Divisional Court.

If the projects were forced to adhere to the new standards, three quarters of the more than 200 proposed turbines in the province would be breaking the rules, according to Eric Gillespie, the Toronto lawyer who filed the suit on behalf of concerned citizens.

If the companies used the new guidelines for modelling, Gillespie said, those rule-breaking turbines “will have to be relocated or removed.”

Citizens concerned about impact on health

The suit doesn’t ask for monetary damages, said Gillespie, but is about ensuring “that anyone living near an industrial wind turbine project is safe.”

“There’s well-documented research that you don’t want to go above the legislated level,” said Gillespie, adding that the noise associated with the loud, rhythmic drumbeat of the turbines can affect sleep, heart health, and general well-being.

“Unfortunately, it appears almost all these projects and most of the turbines in them are going to [break the guidelines] if they’re allowed to proceed.”

The lawsuit includes affidavits from experts on noise pollution, as well as from residents affected by the projects.

Gary Wheeler, a spokesperson with the Ontario Ministry of Environment and Climate Change, wrote in an email that the ministry is working with the companies behind the wind turbine projects to make sure they meet “our stringent noise standards.”

“We will be determining the appropriate next steps,” said Wheeler, who declined to comment on the lawsuit.

Margaret Benke

Margaret Benke, right, lives near the proposed Nation Rise Wind Farm located in the Township of North Stormont. She met Saturday with other residents to discuss the lawsuit. [Photo: Radio-Canada]

Residents plan strategy

The five proposed projects include two in eastern Ontario:

  • Eastern Fields Wind Power Project, in the Municipality of The Nation.
  • Nation Rise Wind Farm, in the Township of North Stormont,

Some of the residents living close to those projects met Saturday to discuss the suit and their next steps.

“We’re asking the government to consider the sentence they’re imposing on the people of rural Ontario,” said Margaret Benke, who lives near the proposed Nation Rise Wind Farm, about 60 kilometres southwest of Ottawa.

Benke said she’s concerned that almost three quarters of the turbines proposed in her community would break the current noise standard.

“I can move out,” she said, “but there are many people without that option. Even if their health is affected.”

The three other projects are all in southern Ontario:

  • Otter Creek Wind Farm, north of Wallaceburg, Ont., in the Municipality of Chatham-Kent.
  • Romney Wind Energy Centre, in Lakeshore, Ont.
  • Strong Breeze Wind Power Project in the Municipality of Dutton/Dunwich.

###

Wind Concerns Ontario obtained records of noise complaints and government response in two batches, 2006-2014 and 2015-2016, under Freedom of Information legislation. There are thousands of unresolved citizen complaints about wind turbine noise and vibration; yet, the government is in the process of approving more industrial wind power projects. Read the WCO report here. NoiseResponseReport-FINAL-May9

NOTE: these power projects are NOT “parks.”

Cornwall MOECC office unresponsive on wind turbine noise reports

04 Monday Sep 2017

Posted by ottawawindconcerns in Ottawa, Uncategorized, Wind power

≈ 2 Comments

Tags

Brinston, Cornwall MOECC, EDPR, MOECC, Nation Rise, North Stormont, wind farm noise, wind turbine noise

North Stormont residents concerned that no one will look out for them if new 100-megawatt power project is approved

(Re-posted from Wind Concerns Ontario)

This past spring, Wind Concerns Ontario conducted an analysis of Ministry of the Environment and Climate Change (MOECC) response to reports of excessive noise and vibration(MOECC) and concluded the process for responding to citizen complaints is deeply flawed and largely ineffective. Global News ran a two-part investigative report on this information, which featured Ontario families who have been complaining about turbine noise for years, with no resolution.

More documents recently released under Freedom of Information (FOI) and correspondence with Ministry staff reveal problems with the Cornwall office that are further examples of a poor strategy for response. The documents and email also are a clear indication that the MOECC has completely abdicated its role as a regulator, and leaves resolution of any problems up to corporate wind power developers.

The Cornwall office up to now has only had to deal with any reports of excessive noise stemming from the 30-megawatt South Branch power project in and around Brinston, Ontario. Documents show that noise complaints were made even before the project began commercial operation in March, 2014.

No report number means no records?

Our initial request for information resulted in three records, which did not match Wind Concerns Ontario members’ experiences with this power project. It turned out, the Cornwall office had not been giving Incident Report numbers to people reporting, as is procedure, so their complaints were not recorded or tracked. On the advice of insider, we re-filed a request, this time asking for “investigative” reports and received  and handful — again, at odds with our members’ real-life experiences–was turned over.

In the records was an email from the Senior Environmental Officer to the power developer EDP Renewables, in which the MOECC staff member actually apologizes for passing along a complaint. [Emphasis ours]

Tuesday July 22, 2014

Hi Ken [Ken Little , EDPR project manager for South Branch]

Sorry about this …

I received a noise complaint last week –not specific to any particular time last week, but a complaint of noise when the winds are from the west or south west. The resident lives [redacted] and is bothered by the noise from the turbine [redacted] The caller stated he cannot open his winds when the winds are from that particular direction due to the noise. …

Do you have any acoustic results for that specific turbine yet?

Excerpts from other complaints

May, 2014: There have been several nights when I am awakened with the window closed. I shudder to think of having the windows open all the time now …

March 20, 2014: I have had several sleepless nights when the wind is in the east direction as the sound waves of the turbines kept me awake from 12:30 a.m. or 2:30 a.m. until morning. [Redacted] Is there any way we can control the wind turbine motion for daytime hours only as [sic] they do not run from 10:00 p.m. until 6:00 a.m.?

And, in one actual Incident Report:

June, 2014 IR 5006-9KYK5D: ..caller report last night was the 7th night since start-up of wind turbines as SBWF that she has been unable to sleep for the noise …Noise is described as drone of an airplane — very loud with windows closed.

MOECC noted: “acoustic monitoring conducted by tech support July 14-18 2014, report under review with noise engineer”

This summer, a Brinston area resident wrote to Minister Murray about the complete lack of response to her reports of excessive noise (she has had to sleep in her basement on occasion because of the noise and vibration), and an officer with the Cornwall Office telephoned her.

Here’s what she was told.

*Ministry staff were completely unprepared for wind turbine noise complaints.

*They still don’t really know what to do.

*They “lost” her records — even though she had so many reports that the MOECC actually installed equipment and did noise measurement for several days.

*Last, it was too bad they lost everything pertaining to her situation and reports but it didn’t really matter, she was told because “You’re the only one complaining.”

“Lost” records? Citizen complaints under the regulations “don’t matter”? And she was “the only one”, which is completely false?

Outrageous behavior for a regulator

Wind Concerns Ontario wrote a letter to new MOECC Minister Ballard, stating “This is outrageous treatment of a citizen of Ontario, who is simply following the process communicated to her by both the Government of Ontario and the wind power developer, who is mandated under its Renewable Energy Approval to act on and resolve any complaints of excessive noise.”

Moreover, WCO noted in its letter to the Minister, the Cornwall office is not ensuring compliance to conditions of the Renewable Energy Approval, specifically results of the compliance audit, which must be posted on the wind power project website, but are not. The response from the Cornwall Office (August 10, 2017):

“Copies of the acoustic audits can be obtained from the Ministry of Environment and Climate Change through a Freedom of Information (FOI) request.  I haven’t had a chance to check, but some reports have been included in the SBWF website– I assume you’ve already checked there.  Let me know if you are interested in pursuing an FOI request and I’ll direct you to the form and process.”

When WCO responded that the report is supposed to be public as per the protocol released by the MOECC in April 2017, the Senior Environmental Officer replies [emphasis ours] on August 10, 2017:

“Ah…I haven’t had a chance to review this new protocol in its entirety…there are some changes worth noting.  Thank you for bringing my attention to this.  I will be requiring the SBWF to post their reports on their website.  I’ll keep you apprised.

“This is completely inappropriate behaviour for a regulator,” WCO president Jane Wilson wrote to Minister Ballard.

“The people of this particular area are now facing approval of a 100-megawatt power project by the same developer, this one close to TWO communities,*  and they have no assurance whatsoever that the Cornwall District Office is prepared, or even competent, to respond effectively to noise complaints.

“On behalf of our members, we ask that you investigate this situation. Government staff should be prepared to fulfill the department’s mandate, and carry out their responsibilities to the people of Ontario.”

As of September 4, 2017, the mandated compliance report is still not on the South Branch Wind Farm website.

 ****UPDATE****

The MOECC informed Wind Concerns Ontario that the documents filed for a noise compliance audit by EDP are “incomplete” and therefore cannot be posted.

South Branch is now in the same position as every other wind power project in Ontario — there is no valid audit to confirm compliance with noise regulations.

See the letter to Minister Ballard here: August28LetterMinisterBallardCornwalDO

Contact the Concerned Citizens of North Stormont here.

Read WCO’s report on noise response by the Ministry 2006-2014 here: NoiseResponseReport-FINAL-May9

Serious questions still unanswered as Nation wind power developer holds final Open House

28 Monday Aug 2017

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Eastern Fields wind farm, Julie Leroux, Leda Clay, MOECC, Ontario Ministry of the Environment and Climate Change, Renewable Energy Approval, Save The Nation, The Nation municipality, wind farm, wind farm noise, wind turbine, wind turbine noise

Citizens have concerns about impact of noise, and about environmental effects on water and wildlife

Citizens have unanswered questions about a huge power project in Nation Municipality [Photo: Ontario Farmer/PostMedia]

 

August 28, 2017

Wind power developer RES Canada has scheduled the final Open House events for the Eastern Fields wind power project in The Nation, east of Ottawa. The Nation includes St Bernardin and Casselman.

The power project proposed would be 32-megawatt capacity, and cost Ontario almost $140 million over the 20-year contract. Ontario is currently in a situation of surplus power, and is regularly selling off surplus power as well as paying power producers to “constrain” or not to produce.

Community group Save The Nation/Sauvons La Nation has many unanswered questions about the project says spokesperson Julie Leroux.

For example, the corporate power developer has not actually confirmed the type of turbines it will use, but has provided a Noise Impact Assessment Report based on computer noise modeling for a type of Vestas wind turbines.

There are questions too about studies of waterways and groundwater, and how the wind turbine foundations will affect the ground. The Nation has Leda Clay which can be unstable.

The water issue is of special concern as property owners in Chatham-Kent are now experiencing contaminated water or Black Water as vibration from turbine construction and operation has been implicated in disturbing aquifers, and causing toxic heavy metals to contaminate wells.

Another concern is the company’s response to complaints of excessive noise and vibration. Wind Concerns Ontario received documents under Freedom of Information legislation showing that thousands of noise complaints have been filed since 2006, very few of which have had any response or resolution. RES Canada’s Talbot development was the source of hundreds of noise complaints. The Ministry of the Environment and Climate Change (MOECC) leaves response to noise complaints up to the power developers, in spite of the Ministry’s mandate to protect the environment and health.

There will be two Open Houses, the final events before the developer files documents for a Renewable Energy Approval.

Tuesday August 29, 2017 from 5:00 pm to 8:00 pm

Caledonia Community Centre

6900 County Road 22

St-Bernardin, ON

 

Wednesday August 30, 2017 from 5:00 pm to 8:00 pm

Vankleek Hill Curling Club

136 Bond Street

Vankleek Hill, ON

To contact Save The Nation and donate toward pre-operational environmental testing and legal fees

Website: www.sauvonslanation.ca

Email: Sauvonslanation@xplornet.com

Tel.: 613-678-6471

 

Wind power developer documents found lacking: engineers’ report

09 Wednesday Aug 2017

Posted by ottawawindconcerns in Renewable energy, Wind power

≈ 5 Comments

Tags

Brinston, EDP Renewables, electricity supply Ontario, environmental assessment, green energy, MInistry of the Environment and Climate Change, MOECC, Morrison Hershfield, Nation Rise wind farm, North Stormont Ontario, renewables, South Branch wind farm, wind farm, wind power

Power developer project documents are missing key details, engineering firm tells Municipality of North Stormont

Concerned Citizens of North Stormont leader Margaret Benke, in Finch, Ontario: MOECC has poor track record in meeting its responsibilities

August 9, 2017

Last week, Portugal-based EDP Renewables filed documents with the Ministry of the Environment and Climate Change (MOECC) as part of the Renewable Energy Approval (REA) process, to get final approval for its “Nation Rise” wind power project in North Stormont, just south of Ottawa.

Using every tool they have to act responsibly on behalf of citizens, North Stormont had engaged Ottawa engineering firm Morrison Hershfield to conduct a review of the documents presented earlier.

The firm found that key information was missing from the project documents in critical areas such as the impact of the project on groundwater, and on bird and bat populations, to name two. An excerpt from the Morrison Hershfield report, tabled at a late June Council meeting, follows.

  • No review has been completed for potential impacts of the project on potable water sources. While potential impacts to groundwater resources have been reviewed from a biophysical perspective, no review has been completed to assess the potential impacts to groundwater resources from a potable water quantity and quality perspective.

• No review has been completed for potential impacts of the project on prime agricultural lands (Class 1-3 agricultural soils)

• Confirmation letter from the Ministry of Tourism, Culture and Sport regarding completeness of archaeological and cultural heritage assessments has not been received for the project as described in clauses 22 (a) and 23 (3) (a) of Ontario Regulation 359/09;

• Confirmation letter from the Ministry of Natural Resources and Forestry regarding completeness of natural heritage assessment and birds and bats EEMP has not been received for the project as described in clauses 28 (3) (b) and (c) of Ontario Regulation 359/09;

• Significant details are missing on the project description (e.g. location and type of permanent meteorological towers & location of the 2-3 proposed staging areas of 2-7 hectares each); and

• No detailed review has been completed to assess potential effects of the project construction on municipal infrastructure.

The consulting firm recommended to Council that North Stormont ask for these reports to be provided, including an assessment of impact on groundwater and municipal infrastructure such as roads.

Read the engineering firm report here.

There is no information on whether EDP complied with the request from North Stormont before filing project documents to be screened for “completeness” by the MOECC.

Citizens in the area are very concerned about the power project. Margaret Benke, a leader with Concerned Citizens of North Stormont, told Ottawa Wind Concerns “You can imagine that with 825 homes within 2km of one and up to 10 proposed turbines, and both Crysler and Finch villages within 3km of multiple turbines, we are bracing for the worst.

The group is especially concerned following release of a report by Wind Concerns Ontario in June, showing that the MOECC has failed to respond to thousands of reports of excessive noise from wind turbines.

“We have many apprehensive citizens,” Benke said. “Unless the MOECC changes its approach, we expect that we could be treated with the same lack of respect and consideration as the 3,200 other residents of Ontario who were largely ignored.  We will continue our fight to protect our rural citizens, who deserve equal respect as citizens.”

EDP also operates the South Branch wind power project in Brinston; it took over a year to file its required acoustic audit to demonstrate compliance with provincial noise regulations for wind turbines, but there is no report posted on the company’s website.

The Nation Rise project will be 100-megawatt capacity using 30-35 industrial-scale wind turbines; Ontario currently has a surplus of electrical power and is regularly selling off extra at below-market prices, and paying wind power generators not to produce in times of low demand and high supply.

A report published by the Council for Safe a& Reliable Energy noted that 70 percent of Ontario’s wind power is wasted. (Ontario’s High-Cost Millstone, June, 2017)

Honesty required for new Environment Minister

01 Tuesday Aug 2017

Posted by ottawawindconcerns in Health, Renewable energy, Wind power

≈ 3 Comments

Tags

Chris Ballard, EDP Renewables, environmental damage wind farm, Jane Wilson, La Nation, MOECC, North Stormont, Ottawa wind farms, RES Canada, Wind Concerns Ontario, wind farm noise, wind farms, wind power, wind turbine noise, Wynne government

EDP wind turbine and home at South Branch project, Brinston, Ontario. Problems unresolved. [Photo by Ray Pilon, Ottawa]

With more wind power projects queued up for environmental approvals to produce intermittent electrical power Ontario doesn’t need, Ontario’s new Minister of the Environment and Climate Change needs a fresh approach.

The previous Minister left thousands of complaints about noise and vibration unresolved, and did not follow through on promises to help people affected by the huge wind turbine installations.

Right now, in the Ottawa area, two projects are planned: the “Eastern Fields” in The Nation and “Nation Rise” in North Stormont. Both are opposed by their communities, both projects will come with negative environmental and social impacts, and neither will produce power that’s needed.

Wind Concerns Ontario has sent a letter to the new Minister with a “To Do” list for his immediate attention.

Here it is:

To the Honourable Chris Ballard

Minister of the Environment and Climate Change

Queen’s Park, Toronto

Welcome to your new position as Minister of the Environment and Climate Change.

Unfortunately, Minister Glen Murray has left you an extensive list of action items requiring your immediate follow-up. We highlight the key issues for you in the following list, related to Ontario’s energy policy and wind power projects.

White Pines – Withdraw the Renewable Energy Approval for this project as developer wpd cannot meet the terms of their contract. There are significant environmental concerns with this project that remain, even after a successful appeal by citizens before the Environmental Review Tribunal.

Amherst Island – Rescind Renewable Energy Approval for this project which is planned for the tiny island heritage community. Significant environmental risks are present including the serious impact on migrating birds that congregate in this area; Ontario does not need the power from this project.

Saugeen Shores – The single wind turbine at the Unifor educational facility has been fraught with problems and engendered hundreds of complaints about excessive noise. This turbine would not be allowed under present regulations. You can immediately address the failure to meet a June 30 deadline for submission of a compliance audit report.

K2 Wind – This is another wind power project, a large one, with many problems in its relatively short history. You can deliver on Minister Glen Murray’s mid-May commitment to Black family, and others, to provide a solution to wind turbines that MOECC testing indicated were not compliant with Ontario regulations to protect the environment and health.

Address Concerns Raised at Request of Minister Murray – Many people across Ontario took Minister Murray at his word when he said that there were no complaints reaching his office and that he would ensure his officials responded quickly to address the issues. They wrote to him and are still waiting for action on their issues.

Complaint Tracking Process – Complaint records released to WCO in response to an FOI request indicate that the MOECC does not respond to most complaints about wind turbine noise. These complaints should be a source of learning for the Ministry rather than being ignored as currently appears to be the case. A full revision of the process is needed to ensure that complaints are actually resolved with procedures that allow the Minister’s office to track resolution. MOECC records indicate little or no resolution of more than 3,100 formal Pollution Reports made by Ontario citizens between 2006 and 2014.

REA Approval Process – Increase setbacks from residences to reflect learning from MOECC complaint records that include staff reports that confirm that current regulations are not sufficient to protect health of residents living in wind projects. Last week, the Supreme Court of Canada set out standards for consultations with communities which are substantially more rigorous than the standards used for Ontario Renewable Energy Projects.

MOECC Noise Modeling Procedures – implement new noise modeling procedures based on MOECC internal testing that demonstrates wind turbines routinely exceed predicted levels.

Otter Creek – Retract decision to deem this application “complete” for the Renewable Energy Approval process. The proponent is unable to provide noise emission data for the turbine equipment proposed. The noise report submitted with the application for a REA is not grounded in fact but rather is estimates based estimates. Also, a full MOECC investigation of the impact on well water is required.

LRP I Contracts – suspend REA process for remaining LRP I projects until full review of requirements based on internal complaint records is completed.

Noise Compliance Audit Protocol – Expand the wind speeds covered under the protocol to include wind speeds below 4 metres/second which are the source of a substantial portion of complaints about excessive noise. Even MOECC testing shows these wind speeds are the source of noise levels exceeding 40 dB(A), which completely undercuts the credibility of this audit process.

REA Enforcement – REA terms make the project operator responsible for addressing the concerns raised in each complaint to ensure that it does not recur. The MOECC needs to follow up on all operating with projects to ensure compliance with these terms and take action where it is not occurring.

Shadow Flicker – The flickering shadows produced when a turbine is positioned between the rising or setting sun is a major irritant for residents. It is not considered in the REA approvals and is easy to address by turning off the turbine for the times when it is casting moving shadows on a house.  In some projects, these changes have been implemented by the wind company but in other MOECC staff is telling residents no action is required, even though the REA requires the wind company to address complaints like these.

Infrasound – Expand MOECC testing to include the full range of noise emissions from wind turbines as independent testing shows the presence of elevated levels of infrasound in homes where residents have had to leave to protect their health.

Health Studies – The Ministry has been telling residents that its policy is based on the “best science” available since the first turbine projects were built. MOECC records clearly show that this is not correct, but the Ministry continues to be willfully blind to input from both residents and its own staff, quoting dated and selective literature reviews in a field where the science is rapidly evolving.  The need for noise studies and other investigation has been highlighted in numerous reports but never undertaken.  It is time for some serious field studies of the problems being caused by wind turbine projects in rural communities across Ontario. This was an information gap identified in 2010 by Ontario’s Chief Medical Officer of Health.

 

Last, it is important that as you prepare for this major portfolio, you understand that industrial-scale wind power generation does NOT benefit the environment.

Wind power generation on this scale is a high-impact development for little benefit, if any. Two Auditors General for Ontario recommended that Ontario undertake a cost-benefit and/or impact analysis — that has never been done.

We ask you to approach this issue with honesty and honour, and respect the wishes of the citizens of rural Ontario.

Sincerely,

Jane Wilson

President

Wind Concerns Ontario

Wind Concerns Ontario is a coalition of community groups, individuals and families concerned about the impact of industrial-scale wind power development on Ontario’s economy, the natural environment, and human health.

*Ottawa Wind Concerns is a community group member of Wind Concerns Ontario

ottawawindconcerns@gmail.com

Hard questions for wind farm developer in Finch

28 Wednesday Jun 2017

Posted by ottawawindconcerns in Renewable energy, Wind power

≈ 1 Comment

Tags

Concerned Citizens of North Stormont, EDP Renewables, Finch Ontario, IESO, Jim McDonell MPP, MOECC, North Stormont Ontario, Ontario Ministry of the Environment and Climate Change, surplus power Ontario

Community concerns about giant wind power project in quiet rural area remain unanswered

Concerned Citizens of North Stormont leader Margaret Benke, in Finch, Ontario

Last evening marked the final public engagement session in the lead-up to power developer EDP applying for Renewable Energy Approval for its 100-megawatt “Nation Rise” power project.

The local population has made it clear they are not in favour of the giant wind power project, which will cost the people $3.3 million over the 20-year contract with the IESO, and add more to everyone’s electricity bill.

For power that Ontario doesn’t need.

People attending had some questions for the developer that may have been tough to answer. Some examples:

The Draft Project Description Report, under Wind Turbines states that the hub height will be anywhere from 100 to 140m. This is significantly higher than the 100m towers at your South Branch Wind Project in Brinston, where residents have filed complaints.

How will the proposed 132m height affect the transmission of noise across our flat, relatively non-forested terrain and how will it differ when there is a hard ice/snow covering on the frozen ground and no leaves on the trees, a condition often found between late November and early April in North Stormont?

In your noise report, you use a global ground absorption factor” of 0.7.  This number is supposed to reflect the worst-case scenario, in our case when surfaces are hard/non-absorptive, like those we see repeatedly in winter, when the ground is frozen and following ice rain events (6 or more this past winter).  Why have you not included a more accurate “0” absorption factor, which is our “worst case” scenario, or something closer to it, which reflects local conditions in North Stormont?

Who are the engineers referred to in Section 3.2.6 of your “Site Considerations” Review? Will they sign, without “qualifying” their report, and assume professional responsibility for all information provided?

Given that over 3,200 noise complaints were officially documented in Ontario from 2006-2014, (just as EDP’s South Branch was brought on-line) and from your prior experience internationally, how have you addressed noise and health complaints?

Community members were particularly concerned that EDP, even though this was the last community event, still could not provide information on the exact equipment to be used, and how many turbines there would actually be in the project that could have as many as 34 50-storey structures.

For more information or to provide support and donations for possible legal action, contact the Concerned Citizens of North Stormont here.

Wind turbine noise reports not answered: Global News report

02 Friday Jun 2017

Posted by ottawawindconcerns in Renewable energy, Wind power

≈ 3 Comments

Tags

Glen Murray MPP, Global News, MOECC, Shirlee Engel, Wind Concerns Ontario, wind farm, wind farm noise, wind turbines

Turbines surround a home in Huron County, Ontario. Complaints get no response. [Photo by Gary Moon]

The Global News investigative team took on the task of finding out what happens when people in rural Ontario report excessive noise and other effects from industrial-scale wind turbines in nearby wind power projects?
The answer, said Global National reporter Shirlee Engel is, “Not much.”
Here are Parts 1 and 2 of the Global News investigative report. The investigation took four months, and was based on documents and analysis provided to Global by Wind Concerns Ontario. It took two years for Wind Concerns to get the documents from the Ministry of the Environment and Climate Change (MOECC) under Freedom of Information legislation.
In over half the cases in the documents, the MOECC made no response; in others there was limited response. The Ministry relied upon wind power companies “predicted modeling” to determine whether noise exceedance was possible. When actual measurements of noise were done, they were limited to a narrow range of audible noise and did not include low frequency or tonal noise.
Minister Glen Murray told the Legislature yesterday after a barrage of questions from Opposition MPPs that the Ministry will now be including “tonal” noise in its measurement; the Minister still insists there is no problem, and told Global News that he has no complaints on his desk at present — Wind Concerns Ontario documents show almost 3,200 complaints filed between 2006 and 2014.

http://globalnews.ca/video/3498008/ontario-wind-turbine-complaints-fall-on-deaf-ears/
http://globalnews.ca/video/3498012/community-fed-up-with-ministrys-response-to-wind-turbine-complaints

Wind turbines are a nightmare: Ontario family

31 Wednesday May 2017

Posted by ottawawindconcerns in Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Brian Hill Global, Global News, La Nation, MOECC, North Stormont, Ontario Ministry of the Environment and Climate Change, The Nation, Wind Concerns Ontario, wind farm noise, wind turbine noise

Global News has a report today on information related to wind turbine noise complaints.

Carla Stachura and her husband Mike thought they’d found the perfect spot to retire.

A house in rural Ontario where they run a wildlife sanctuary with lamas and a variety of birds, and planned to spend their retirement years enjoying the peace and quiet of country life.

But that dream was shattered when wind turbines began popping up near their Goderich, Ontario home. Since then, their dream has become a nightmare. The couple says they’ve been unable to sleep and exposed to prolonged periods of annoying noise. Adding to their frustration, they say the provincial government won’t lift a finger to help them, other than order more tests.

“We’ve been having issues since they turned the turbines on,” said Carla.

The couple purchased the property in 2003. They say it was paradise until the K2 Wind Farm, operated by Pattern Energy, started operations in the spring of 2015.

READ MORE: Ontario residents fight wind turbines planned near Collingwood airport 

“I immediately called K2,” Carla said.

Over the past two years, officials from the ministry have measured violations of the province’s noise limits at the couple’s home on two occasions, first in August 2015 and again in March 2017. Despite these violations, the couple says the government has done nothing other than order more tests.

Ministry of Environment does not respond to majority of wind turbine complaints

The Stachura’s complaints of government inaction are not unique. In fact, Global News has learned that Ontario’s Ministry of the Environment and Climate Change does not respond to the majority of complaints made by residents concerned about wind turbines.

Documents released through Ontario’s Freedom of Information Act and obtained by Global News reveal officials from the Ministry of Environment chose not to investigate or deferred responding to – meaning they did not make immediate plans to investigate – roughly 68 per cent of all noise and health complaints lodged against wind turbine operators in the province between 2006 and 2014. This represents nearly 2,200 individual complaints.

The documents also show limited resources sometimes prevented the ministry from responding to complaints.

Originally obtained by Wind Concerns Ontario, the documents include a list of 3,180 complaints. They also include a 458-page collection of “master incident reports,” which the ministry has verified as authentic, detailing the ministry’s response – or lack thereof – in cases where residents complained multiple times.

The documents show that in 54 per cent of all cases – more than 1,700 individual complaints – the ministry did not investigate residents’ concerns. In another 450 cases, roughly 14 per cent of total incidents, the ministry deferred responding to complaints.

In most cases, the documents do not reveal why the ministry chose not to respond. Instead, they tend to focus on whether the wind farm was compliant with ministry standards or past efforts to resolve residents’ concerns.

“The lack of response from the ministry shows just how unprepared they were for the potential effects of putting these giant machines so close to people and their communities,” said Jane Wilson, president of Wind Concerns Ontario.

Read more here, and watch the story today on Global News.

Two wind power projects have contracts but not Renewable Energy Approvals yet in the Ottawa area: the Nation Rise project in North Stormont (Finch, Berwick) and Eastern Fields in The Nation (St Bernardin, Casselman).

Wind Concerns Ontario is recommending that approvals not be granted for these projects, and that new tougher noise standards be developed for turbines, and enforced.

← Older posts

Recent Posts

  • Net Zero, renewables, natural gas ban a hot issue in Eastern Ontario
  • What do we know about Battery Energy Storage? Not much
  • Ottawa Council votes unanimously to hold approvals of new power generation installations until protective bylaws in place
  • Rural councillors propose motion to protect health, safety
  • Prince Edward County rejects battery storage proposal

Follow me on Twitter

My Tweets

Enter your email address to follow this blog and receive notifications of new posts by email.

Tags

Bob Chiarelli electricity bills Ontario Green Energy Act IESO Ontario Ottawa wind concerns wind farm wind farms wind power wind turbines

Contact us

PO Box 3 North Gower ON K0A 2T0

Create a free website or blog at WordPress.com.

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Follow Following
    • Ottawa Wind Concerns
    • Join 369 other followers
    • Already have a WordPress.com account? Log in now.
    • Ottawa Wind Concerns
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...