• About
  • BRINSTON/SOUTH BRANCH/NORTH DUNDAS/NORTH STORMONT
  • Donate!
  • Ottawa’s “Energy Evolution”: wind turbines coming to rural communities
  • Wind Concerns Ontario

Ottawa Wind Concerns

~ A safe environment for everyone

Ottawa Wind Concerns

Tag Archives: wind farm noise

Turbines go up, turbines come down

19 Tuesday Nov 2019

Posted by ottawawindconcerns in Ottawa, Renewable energy, Wind power

≈ 2 Comments

Tags

Conservation and Parks, Finch Ontario, IESO, Jim McDonell MPP, Ministry of Environment, Ontario, prince Edward County, wind, wind farm noise, wind power

Crane used to dismantle grid-scale wind turbine in Prince Edward County this week. Meanwhile, more going up south of Ottawa [Photo: Alliance to Protect Prince Edward County]

Contrast between North Stormont and Prince Edward County an indication of Ontario’s muddled electricity file

November 19, 2019

While people in Prince Edward County are celebrating the demise of the “White Pines” wind power project as government-ordered decommissioning of the industrial-scale wind turbines is going on this week, the people of North Stormont, south-east of Ottawa, are watching the behemoths go UP.

The White Pines project in Prince Edward County, developed by Germany-based wpd, was a controversial power project appealed several times by residents concerned about the environmental impact of the wind power generators and infrastructure on wildlife and people. The original plan was for 29 turbines; that was reduced to 27 after legal action and finally, to nine.

The new Ontario government passed legislation not long after taking office cancelling the power project — residents say it should never have been approved in the first place.

But now, more than 30 giant grid-scale wind turbines are currently being erected in North Stormont, near the communities of Finch, Crysler and Berwick by Portugal-based power developer EDPR. EDPR sold the project last year to Axium Infrastructure; that consortium also owns the K2 Wind power project in Huron County, which has been the subject of appeals, and post-operation, hundreds of noise complaints.

K2 Wind is currently under order by the Director of the environment ministry to implement and evaluate a noise assessment plan for more than 80 of its 140 turbines, which were found to be out of compliance with Ontario regulations for wind turbine noise emissions.

“Nation Rise” as the North Stormont project is called, was also the subject of appeals, and a last appeal was submitted to the Ontario environment minister six months ago. No word on the status of the appeal, nor on the status of a request for a stay of construction, filed in May.

Residents are concerned not only about noise (the project got to use old, pre-2017 noise assessment rules under the Wynne government), and also damage to the environment, especially a fragile or “vulnerable” water table.

The Nation Rise final approval came through days before the provincial election in 2018, despite the “caretaker” government convention which discourages major decisions during the election period. The Independent Electricity System Operator (IESO) also granted a Notice To Proceed days after the election, despite being warned by government leader MPP Todd Smith not to approve any more projects.

Now, the giant towers are rising in the quiet communities of North Stormont, as the power developer races to meet a December operational deadline. The local MPP Jim McDonell claims there’s nothing he can do about it—that Notice To Proceed meant the project had to go ahead.

Pre-construction liability for Nation Rise (i.e., the cost of the government cancelling the contract) was about $400,000. If it goes into operation, the people of Ontario will bear the cost of the project which will add more than $400 million to electricity bills, over the 20-year life of the power contract.

So, while the turbines go up, others — already approved and built — come down. And you’re paying for it all.

OTTAWA WIND CONCERNS

Turbine blades at Johnstown, destined for Nation Rise

The local community group Concerned Citizens of North Stormont are having a fund-raising country breakfast December 1st. https://concernedcitizensofnorthstormont.ca/

 

Advertisement

Wind power lobby hopes Ontario forgets all the bad stuff about wind turbines

02 Tuesday Apr 2019

Posted by ottawawindconcerns in Renewable energy, Wind power

≈ Leave a comment

Tags

CanWEA, renewables, wind energy, wind farm, wind farm noise, wind turbines

Wind power lobby cajoles Ontario to ignore all the problems and take another chance on invasive, problem-ridden wind turbines.

Lobbyist for multi-billion-dollar wind power developers want Ontario to forget the past and choose industrial wind … again. [Shutterstock image]

April 2, 2019

Canada’s lobbyist and trade association for the wind power development industry, the Canadian Wind Energy Association (CanWEA), has just launched its campaign to make the Ontario government reconsider its position on wind power.

On Sunday, March 31st, CanWEA published a blog post entitled “Why wind energy is Ontario’s best option for new electricity supply.”

Ontario director Brandy Gianetta then lists five points.

Not a single one of them is true.

But here’s what is true:

Wind doesn’t work.

Everyone wants the best for the environment, and we all want “clean” electricity, but here’s what we know about the giant wind experiment in Ontario over its 13-year history:

  • Industrial-scale wind turbines have a high impact on the environment for no benefit
  • Wind power never replaced any form of power generation: coal was replaced by nuclear and natural gas
  • Wind power is intermittent, and produced out-of-phase with demand in Ontario; the Coalition for Clean & Reliable Energy notes that almost 70% of wind power is wasted in Ontario … but we have to pay for it anyway.
  • Wind is not “low-cost”; claims of 3.7 cents per kWh prices from Alberta ignore government subsidies. Wind power contracts are a significant factor in Ontario’s high electricity bills, and the trend to “energy poverty.”
  • Wind power has had multiple negative impacts in Ontario, including thousands of complaints of excessive noise reported to government. These have not been resolved, and many power projects may be out of compliance with their approvals; enforcement of the regulations is needed.
  • The promised jobs bonanza never happened.

In fact, a cost-benefit/impact analysis was never done for Ontario’s wind power program, according to two Auditors General.

Ontario doesn’t need more power now says the Independent Electricity System Operator (IESO), but if we did, why choose an intermittent, unreliable source of power that has so many negative side effects?

Wind doesn’t work.

 

Wind Concerns Ontario

See also Wind Concerns Ontario noise reports: Second Report Noise Complaints February 2018-FINAL

North Stormont appeal delayed until September

22 Wednesday Aug 2018

Posted by ottawawindconcerns in Health, Renewable energy, Wind power

≈ 1 Comment

Tags

bat deaths, Berwick, Concerned Citizens of North Stormont, environment, ERT, North Stormont, Ontario Farmer, Ontario Ministry of the Environment Conservation and Parks, Tom Van Dusen, wind farm, wind farm noise, wind turbines

Witnesses for the community opposition present fresh evidence on harm to people and the environment

 

Berwick area farm: 33 huge industrial wind turbines proposed, with risk to health, safety, environment and wildlife [Photo Dorothea Larsen, Kemptville]

Ontario Farmer, August 14, 2018

By Tom Van Dusen

The Environmental Review Tribunal hearing into North Stormont’s approved Nation Rise wind turbine project has been adjourned until September 10-11.

The adjournment was called by tribunal chair Maureen Carter-Whitney July 31, with three days remaining on the original two-week schedule.

Key issues in deciding whether authorization given to EDP Renewables for the wind farm should be revoked are that it poses serious risk to human health, or that it could create irrevocable damage to the natural environment.

When the hearing resumes, hydrology will be the main topic. Before it broke, opponents presented their case on the threat to bats and birds posed by the installation of 33 turbines in the farming community south-east of Ottawa, the last wind power project to be approved in Ontario before the recent provincial election.

Expert witness Philippe Thomas, a resident of nearby Chesterville, educated the panel on barotrauma, a phenomenon which can cause the lungs of bats to implode when they fly in low-pressure areas close to turbine blades.

He described a study in Western Canada where it was part of his job to retrieve 400 bat carcasses at the base of wind turbines; only a few showed injuries consistent with being struck by blades, while the majority would have succumbed to barotrauma.

..EDP had a chance to rebut bird and bats arguments with its own expert witnesses. Biologist Andrew Ryckman and Dr Paul Kerlinger concluded the danger to bats would be minima and the impact on songbirds and migratory birds would be equally limited because they’re commonly found closer to shorelines. …

[Opposition coordinator Margaret Benke] indicated opposing witnesses brought forward some fresh points on wind turbine noise and on “debris fling” — the fact that pieces sometimes break off wind mills and are hurled long distances, posing a threat to humans in the area.

A major issue now, she emphasized, is paying the $20,000 debt opponents have accumulated in going against the project while raising more money to continue to fight to the end.

ottawawindconcerns@gmail.com

To help with fundraising for the North Stormont appeal, go to Go Fund Me here or send a cheque to Concerned Citizens of North Stormont c/o Wind Concerns Ontario, PO Box 509, 250 Wellington Main Street, Wellington ON  K0K 3L0.

Ottawa area community groups petition Queen’s Park today

30 Monday Apr 2018

Posted by ottawawindconcerns in Health, Renewable energy, Wind power

≈ 1 Comment

Tags

Dutton-Dunwich, environmental noise, North Stormont, Ottawa, renewables, The Nation, Wallaceburg, wind farm noise, wind power

Concerned Citizens of North Stormont leader Margaret Benke, Same rules for everybody.

April 30, 2018

The Ontario government realized there were inadequacies in their protocols for wind turbine noise and the assessment procedures needed in the approval process for new wind power projects, so they changed them.

And then gave the five newest wind power projects the option not to use the new rules.

As a result, the powerful power generators in projects that received contracts in 2016 but which are not yet built — in fact four don’t have Renewable Energy Approval yet — will be out of compliance with the new regulations the minute they start operating.

Four Ontario community groups think that’s not right.

They’re heading to Queen’s Park today as three MPPs present thousands of signatures on a Petition, asking the government to follow its own rules.

Representatives of Ottawa-area Concerned Citizens of North Stormont and Save The Nation will join their colleagues from Dutton Dunwich Opponents of Wind Turbines (DDOWT) and Wallaceburg Area Wind Concerns as the Petition is presented in the Legislature.

The Petition is related to the creation of “Transition Provisions” by the Ministry of the Environment and Climate Change (MOECC) in the Renewable Energy Approval process, which allows wind power developers to ignore new noise modelling guidelines, even for the newest unapproved power projects.

“The MOECC recognized that the previous requirements for turbine noise modelling were inadequate and they revised them,” says Bonnie Rowe, spokesperson for Dutton Dunwich Opponents of Wind Turbines (DDOWT), whose citizen group has applied for a Judicial Review of the Transition. “The noise modelling requirements are important to protect health and safety for people living near the turbines but now, the government has allowed the developers for the new projects to use the old ones — we think that’s wrong.

“If the government sets rules, especially for health, then everyone should have to follow them, no exceptions.”

Wind turbine noise has been linked to sleep disturbance, which in turn leads to other, serious health problems. According to Wind Concerns Ontario, documents received from the Ministry of the Environment and Climate Change #MOECC show that thousands of reports of excessive noise remain unresolved, and not responded to in Ontario.

MPPs presenting the petitions Monday are: Jeff Yurek, from Elgin-Middlesex-London where the Strong Breeze Wind Power Project is proposed for Dutton Dunwich; Monte McNaughton, from Lambton-Kent-Middlesex where the Otter Creek Wind Farm is proposed for the Wallaceburg area; and Jim McDonell, MPP for Stormont-Dundas-South Glengarry, who will be delivering petitions on behalf of the North Stormont area where the Nation Rise Wind Farm is proposed, and also the Municipality of The Nation, where the Eastern Fields Wind Power Project is proposed.

Concerned Citizens of North Stormont: Margaret Benke  macbenke@aol.com

Ottawa Wind Concerns: ottawawindconcerns@gmail.com

Ottawa area citizen groups to sue Ontario over wind turbine noise

28 Sunday Jan 2018

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Concerned Citizens of North Stormont, Eric Gillespie, MOECC, Ontario Ministry of the Environment and Climate Change, Ottawa wind farms, wind energy, wind farm, wind farm noise, wind power, wind turbine noise

CBC.ca

Citizens sue province over proposed industrial wind turbine projects

Groups allege 5 wind power projects are allowed to defy safe noise limits

By Amanda Pfeffer, CBC News Posted: Jan 28, 2018 6:20 AM ETLast Updated: Jan 28, 2018 6:20 AM ET

Citizens living near five proposed wind turbine parks in Ontario have launched a lawsuit alleging the provincial government is allowing the companies behind the projects to defy safe noise limits.

The province approved the wind park projects in 2016. They are scattered around rural Ontario, and two are within an hour’s drive from Ottawa.

The projects are now going through a “technical review” as part of the final approval process by the Ontario Ministry of Environment and Climate Change.

  • Wind turbines approved for eastern Ontario despite objections

In 2016, the Ontario government also introduced new and more accurate standards for how companies model the noise impact of turbines before they’re built.

Map of wind turbine impact, Eastern Fields Wind Power Project

Map depicting range of impacts of wind turbines for Eastern Fields project near St Bernardin and St Isidore, east of Ottawa [Photo: Radio-Canada]

Suit alleges standards out of date

The lawsuit, however, alleges the proponents behind the five projects have been using old modelling standards.

“It appears that the majority of proposed turbine sites are out of compliance with the [new] requirements,” states the suit, which has been filed with the Ontario Divisional Court.

If the projects were forced to adhere to the new standards, three quarters of the more than 200 proposed turbines in the province would be breaking the rules, according to Eric Gillespie, the Toronto lawyer who filed the suit on behalf of concerned citizens.

If the companies used the new guidelines for modelling, Gillespie said, those rule-breaking turbines “will have to be relocated or removed.”

Citizens concerned about impact on health

The suit doesn’t ask for monetary damages, said Gillespie, but is about ensuring “that anyone living near an industrial wind turbine project is safe.”

“There’s well-documented research that you don’t want to go above the legislated level,” said Gillespie, adding that the noise associated with the loud, rhythmic drumbeat of the turbines can affect sleep, heart health, and general well-being.

“Unfortunately, it appears almost all these projects and most of the turbines in them are going to [break the guidelines] if they’re allowed to proceed.”

The lawsuit includes affidavits from experts on noise pollution, as well as from residents affected by the projects.

Gary Wheeler, a spokesperson with the Ontario Ministry of Environment and Climate Change, wrote in an email that the ministry is working with the companies behind the wind turbine projects to make sure they meet “our stringent noise standards.”

“We will be determining the appropriate next steps,” said Wheeler, who declined to comment on the lawsuit.

Margaret Benke

Margaret Benke, right, lives near the proposed Nation Rise Wind Farm located in the Township of North Stormont. She met Saturday with other residents to discuss the lawsuit. [Photo: Radio-Canada]

Residents plan strategy

The five proposed projects include two in eastern Ontario:

  • Eastern Fields Wind Power Project, in the Municipality of The Nation.
  • Nation Rise Wind Farm, in the Township of North Stormont,

Some of the residents living close to those projects met Saturday to discuss the suit and their next steps.

“We’re asking the government to consider the sentence they’re imposing on the people of rural Ontario,” said Margaret Benke, who lives near the proposed Nation Rise Wind Farm, about 60 kilometres southwest of Ottawa.

Benke said she’s concerned that almost three quarters of the turbines proposed in her community would break the current noise standard.

“I can move out,” she said, “but there are many people without that option. Even if their health is affected.”

The three other projects are all in southern Ontario:

  • Otter Creek Wind Farm, north of Wallaceburg, Ont., in the Municipality of Chatham-Kent.
  • Romney Wind Energy Centre, in Lakeshore, Ont.
  • Strong Breeze Wind Power Project in the Municipality of Dutton/Dunwich.

###

Wind Concerns Ontario obtained records of noise complaints and government response in two batches, 2006-2014 and 2015-2016, under Freedom of Information legislation. There are thousands of unresolved citizen complaints about wind turbine noise and vibration; yet, the government is in the process of approving more industrial wind power projects. Read the WCO report here. NoiseResponseReport-FINAL-May9

NOTE: these power projects are NOT “parks.”

Cornwall MOECC office unresponsive on wind turbine noise reports

04 Monday Sep 2017

Posted by ottawawindconcerns in Ottawa, Uncategorized, Wind power

≈ 2 Comments

Tags

Brinston, Cornwall MOECC, EDPR, MOECC, Nation Rise, North Stormont, wind farm noise, wind turbine noise

North Stormont residents concerned that no one will look out for them if new 100-megawatt power project is approved

(Re-posted from Wind Concerns Ontario)

This past spring, Wind Concerns Ontario conducted an analysis of Ministry of the Environment and Climate Change (MOECC) response to reports of excessive noise and vibration(MOECC) and concluded the process for responding to citizen complaints is deeply flawed and largely ineffective. Global News ran a two-part investigative report on this information, which featured Ontario families who have been complaining about turbine noise for years, with no resolution.

More documents recently released under Freedom of Information (FOI) and correspondence with Ministry staff reveal problems with the Cornwall office that are further examples of a poor strategy for response. The documents and email also are a clear indication that the MOECC has completely abdicated its role as a regulator, and leaves resolution of any problems up to corporate wind power developers.

The Cornwall office up to now has only had to deal with any reports of excessive noise stemming from the 30-megawatt South Branch power project in and around Brinston, Ontario. Documents show that noise complaints were made even before the project began commercial operation in March, 2014.

No report number means no records?

Our initial request for information resulted in three records, which did not match Wind Concerns Ontario members’ experiences with this power project. It turned out, the Cornwall office had not been giving Incident Report numbers to people reporting, as is procedure, so their complaints were not recorded or tracked. On the advice of insider, we re-filed a request, this time asking for “investigative” reports and received  and handful — again, at odds with our members’ real-life experiences–was turned over.

In the records was an email from the Senior Environmental Officer to the power developer EDP Renewables, in which the MOECC staff member actually apologizes for passing along a complaint. [Emphasis ours]

Tuesday July 22, 2014

Hi Ken [Ken Little , EDPR project manager for South Branch]

Sorry about this …

I received a noise complaint last week –not specific to any particular time last week, but a complaint of noise when the winds are from the west or south west. The resident lives [redacted] and is bothered by the noise from the turbine [redacted] The caller stated he cannot open his winds when the winds are from that particular direction due to the noise. …

Do you have any acoustic results for that specific turbine yet?

Excerpts from other complaints

May, 2014: There have been several nights when I am awakened with the window closed. I shudder to think of having the windows open all the time now …

March 20, 2014: I have had several sleepless nights when the wind is in the east direction as the sound waves of the turbines kept me awake from 12:30 a.m. or 2:30 a.m. until morning. [Redacted] Is there any way we can control the wind turbine motion for daytime hours only as [sic] they do not run from 10:00 p.m. until 6:00 a.m.?

And, in one actual Incident Report:

June, 2014 IR 5006-9KYK5D: ..caller report last night was the 7th night since start-up of wind turbines as SBWF that she has been unable to sleep for the noise …Noise is described as drone of an airplane — very loud with windows closed.

MOECC noted: “acoustic monitoring conducted by tech support July 14-18 2014, report under review with noise engineer”

This summer, a Brinston area resident wrote to Minister Murray about the complete lack of response to her reports of excessive noise (she has had to sleep in her basement on occasion because of the noise and vibration), and an officer with the Cornwall Office telephoned her.

Here’s what she was told.

*Ministry staff were completely unprepared for wind turbine noise complaints.

*They still don’t really know what to do.

*They “lost” her records — even though she had so many reports that the MOECC actually installed equipment and did noise measurement for several days.

*Last, it was too bad they lost everything pertaining to her situation and reports but it didn’t really matter, she was told because “You’re the only one complaining.”

“Lost” records? Citizen complaints under the regulations “don’t matter”? And she was “the only one”, which is completely false?

Outrageous behavior for a regulator

Wind Concerns Ontario wrote a letter to new MOECC Minister Ballard, stating “This is outrageous treatment of a citizen of Ontario, who is simply following the process communicated to her by both the Government of Ontario and the wind power developer, who is mandated under its Renewable Energy Approval to act on and resolve any complaints of excessive noise.”

Moreover, WCO noted in its letter to the Minister, the Cornwall office is not ensuring compliance to conditions of the Renewable Energy Approval, specifically results of the compliance audit, which must be posted on the wind power project website, but are not. The response from the Cornwall Office (August 10, 2017):

“Copies of the acoustic audits can be obtained from the Ministry of Environment and Climate Change through a Freedom of Information (FOI) request.  I haven’t had a chance to check, but some reports have been included in the SBWF website– I assume you’ve already checked there.  Let me know if you are interested in pursuing an FOI request and I’ll direct you to the form and process.”

When WCO responded that the report is supposed to be public as per the protocol released by the MOECC in April 2017, the Senior Environmental Officer replies [emphasis ours] on August 10, 2017:

“Ah…I haven’t had a chance to review this new protocol in its entirety…there are some changes worth noting.  Thank you for bringing my attention to this.  I will be requiring the SBWF to post their reports on their website.  I’ll keep you apprised.

“This is completely inappropriate behaviour for a regulator,” WCO president Jane Wilson wrote to Minister Ballard.

“The people of this particular area are now facing approval of a 100-megawatt power project by the same developer, this one close to TWO communities,*  and they have no assurance whatsoever that the Cornwall District Office is prepared, or even competent, to respond effectively to noise complaints.

“On behalf of our members, we ask that you investigate this situation. Government staff should be prepared to fulfill the department’s mandate, and carry out their responsibilities to the people of Ontario.”

As of September 4, 2017, the mandated compliance report is still not on the South Branch Wind Farm website.

 ****UPDATE****

The MOECC informed Wind Concerns Ontario that the documents filed for a noise compliance audit by EDP are “incomplete” and therefore cannot be posted.

South Branch is now in the same position as every other wind power project in Ontario — there is no valid audit to confirm compliance with noise regulations.

See the letter to Minister Ballard here: August28LetterMinisterBallardCornwalDO

Contact the Concerned Citizens of North Stormont here.

Read WCO’s report on noise response by the Ministry 2006-2014 here: NoiseResponseReport-FINAL-May9

Serious questions still unanswered as Nation wind power developer holds final Open House

28 Monday Aug 2017

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Eastern Fields wind farm, Julie Leroux, Leda Clay, MOECC, Ontario Ministry of the Environment and Climate Change, Renewable Energy Approval, Save The Nation, The Nation municipality, wind farm, wind farm noise, wind turbine, wind turbine noise

Citizens have concerns about impact of noise, and about environmental effects on water and wildlife

Citizens have unanswered questions about a huge power project in Nation Municipality [Photo: Ontario Farmer/PostMedia]

 

August 28, 2017

Wind power developer RES Canada has scheduled the final Open House events for the Eastern Fields wind power project in The Nation, east of Ottawa. The Nation includes St Bernardin and Casselman.

The power project proposed would be 32-megawatt capacity, and cost Ontario almost $140 million over the 20-year contract. Ontario is currently in a situation of surplus power, and is regularly selling off surplus power as well as paying power producers to “constrain” or not to produce.

Community group Save The Nation/Sauvons La Nation has many unanswered questions about the project says spokesperson Julie Leroux.

For example, the corporate power developer has not actually confirmed the type of turbines it will use, but has provided a Noise Impact Assessment Report based on computer noise modeling for a type of Vestas wind turbines.

There are questions too about studies of waterways and groundwater, and how the wind turbine foundations will affect the ground. The Nation has Leda Clay which can be unstable.

The water issue is of special concern as property owners in Chatham-Kent are now experiencing contaminated water or Black Water as vibration from turbine construction and operation has been implicated in disturbing aquifers, and causing toxic heavy metals to contaminate wells.

Another concern is the company’s response to complaints of excessive noise and vibration. Wind Concerns Ontario received documents under Freedom of Information legislation showing that thousands of noise complaints have been filed since 2006, very few of which have had any response or resolution. RES Canada’s Talbot development was the source of hundreds of noise complaints. The Ministry of the Environment and Climate Change (MOECC) leaves response to noise complaints up to the power developers, in spite of the Ministry’s mandate to protect the environment and health.

There will be two Open Houses, the final events before the developer files documents for a Renewable Energy Approval.

Tuesday August 29, 2017 from 5:00 pm to 8:00 pm

Caledonia Community Centre

6900 County Road 22

St-Bernardin, ON

 

Wednesday August 30, 2017 from 5:00 pm to 8:00 pm

Vankleek Hill Curling Club

136 Bond Street

Vankleek Hill, ON

To contact Save The Nation and donate toward pre-operational environmental testing and legal fees

Website: www.sauvonslanation.ca

Email: Sauvonslanation@xplornet.com

Tel.: 613-678-6471

 

Honesty required for new Environment Minister

01 Tuesday Aug 2017

Posted by ottawawindconcerns in Health, Renewable energy, Wind power

≈ 3 Comments

Tags

Chris Ballard, EDP Renewables, environmental damage wind farm, Jane Wilson, La Nation, MOECC, North Stormont, Ottawa wind farms, RES Canada, Wind Concerns Ontario, wind farm noise, wind farms, wind power, wind turbine noise, Wynne government

EDP wind turbine and home at South Branch project, Brinston, Ontario. Problems unresolved. [Photo by Ray Pilon, Ottawa]

With more wind power projects queued up for environmental approvals to produce intermittent electrical power Ontario doesn’t need, Ontario’s new Minister of the Environment and Climate Change needs a fresh approach.

The previous Minister left thousands of complaints about noise and vibration unresolved, and did not follow through on promises to help people affected by the huge wind turbine installations.

Right now, in the Ottawa area, two projects are planned: the “Eastern Fields” in The Nation and “Nation Rise” in North Stormont. Both are opposed by their communities, both projects will come with negative environmental and social impacts, and neither will produce power that’s needed.

Wind Concerns Ontario has sent a letter to the new Minister with a “To Do” list for his immediate attention.

Here it is:

To the Honourable Chris Ballard

Minister of the Environment and Climate Change

Queen’s Park, Toronto

Welcome to your new position as Minister of the Environment and Climate Change.

Unfortunately, Minister Glen Murray has left you an extensive list of action items requiring your immediate follow-up. We highlight the key issues for you in the following list, related to Ontario’s energy policy and wind power projects.

White Pines – Withdraw the Renewable Energy Approval for this project as developer wpd cannot meet the terms of their contract. There are significant environmental concerns with this project that remain, even after a successful appeal by citizens before the Environmental Review Tribunal.

Amherst Island – Rescind Renewable Energy Approval for this project which is planned for the tiny island heritage community. Significant environmental risks are present including the serious impact on migrating birds that congregate in this area; Ontario does not need the power from this project.

Saugeen Shores – The single wind turbine at the Unifor educational facility has been fraught with problems and engendered hundreds of complaints about excessive noise. This turbine would not be allowed under present regulations. You can immediately address the failure to meet a June 30 deadline for submission of a compliance audit report.

K2 Wind – This is another wind power project, a large one, with many problems in its relatively short history. You can deliver on Minister Glen Murray’s mid-May commitment to Black family, and others, to provide a solution to wind turbines that MOECC testing indicated were not compliant with Ontario regulations to protect the environment and health.

Address Concerns Raised at Request of Minister Murray – Many people across Ontario took Minister Murray at his word when he said that there were no complaints reaching his office and that he would ensure his officials responded quickly to address the issues. They wrote to him and are still waiting for action on their issues.

Complaint Tracking Process – Complaint records released to WCO in response to an FOI request indicate that the MOECC does not respond to most complaints about wind turbine noise. These complaints should be a source of learning for the Ministry rather than being ignored as currently appears to be the case. A full revision of the process is needed to ensure that complaints are actually resolved with procedures that allow the Minister’s office to track resolution. MOECC records indicate little or no resolution of more than 3,100 formal Pollution Reports made by Ontario citizens between 2006 and 2014.

REA Approval Process – Increase setbacks from residences to reflect learning from MOECC complaint records that include staff reports that confirm that current regulations are not sufficient to protect health of residents living in wind projects. Last week, the Supreme Court of Canada set out standards for consultations with communities which are substantially more rigorous than the standards used for Ontario Renewable Energy Projects.

MOECC Noise Modeling Procedures – implement new noise modeling procedures based on MOECC internal testing that demonstrates wind turbines routinely exceed predicted levels.

Otter Creek – Retract decision to deem this application “complete” for the Renewable Energy Approval process. The proponent is unable to provide noise emission data for the turbine equipment proposed. The noise report submitted with the application for a REA is not grounded in fact but rather is estimates based estimates. Also, a full MOECC investigation of the impact on well water is required.

LRP I Contracts – suspend REA process for remaining LRP I projects until full review of requirements based on internal complaint records is completed.

Noise Compliance Audit Protocol – Expand the wind speeds covered under the protocol to include wind speeds below 4 metres/second which are the source of a substantial portion of complaints about excessive noise. Even MOECC testing shows these wind speeds are the source of noise levels exceeding 40 dB(A), which completely undercuts the credibility of this audit process.

REA Enforcement – REA terms make the project operator responsible for addressing the concerns raised in each complaint to ensure that it does not recur. The MOECC needs to follow up on all operating with projects to ensure compliance with these terms and take action where it is not occurring.

Shadow Flicker – The flickering shadows produced when a turbine is positioned between the rising or setting sun is a major irritant for residents. It is not considered in the REA approvals and is easy to address by turning off the turbine for the times when it is casting moving shadows on a house.  In some projects, these changes have been implemented by the wind company but in other MOECC staff is telling residents no action is required, even though the REA requires the wind company to address complaints like these.

Infrasound – Expand MOECC testing to include the full range of noise emissions from wind turbines as independent testing shows the presence of elevated levels of infrasound in homes where residents have had to leave to protect their health.

Health Studies – The Ministry has been telling residents that its policy is based on the “best science” available since the first turbine projects were built. MOECC records clearly show that this is not correct, but the Ministry continues to be willfully blind to input from both residents and its own staff, quoting dated and selective literature reviews in a field where the science is rapidly evolving.  The need for noise studies and other investigation has been highlighted in numerous reports but never undertaken.  It is time for some serious field studies of the problems being caused by wind turbine projects in rural communities across Ontario. This was an information gap identified in 2010 by Ontario’s Chief Medical Officer of Health.

 

Last, it is important that as you prepare for this major portfolio, you understand that industrial-scale wind power generation does NOT benefit the environment.

Wind power generation on this scale is a high-impact development for little benefit, if any. Two Auditors General for Ontario recommended that Ontario undertake a cost-benefit and/or impact analysis — that has never been done.

We ask you to approach this issue with honesty and honour, and respect the wishes of the citizens of rural Ontario.

Sincerely,

Jane Wilson

President

Wind Concerns Ontario

Wind Concerns Ontario is a coalition of community groups, individuals and families concerned about the impact of industrial-scale wind power development on Ontario’s economy, the natural environment, and human health.

*Ottawa Wind Concerns is a community group member of Wind Concerns Ontario

ottawawindconcerns@gmail.com

Wind turbine noise reports not answered: Global News report

02 Friday Jun 2017

Posted by ottawawindconcerns in Renewable energy, Wind power

≈ 3 Comments

Tags

Glen Murray MPP, Global News, MOECC, Shirlee Engel, Wind Concerns Ontario, wind farm, wind farm noise, wind turbines

Turbines surround a home in Huron County, Ontario. Complaints get no response. [Photo by Gary Moon]

The Global News investigative team took on the task of finding out what happens when people in rural Ontario report excessive noise and other effects from industrial-scale wind turbines in nearby wind power projects?
The answer, said Global National reporter Shirlee Engel is, “Not much.”
Here are Parts 1 and 2 of the Global News investigative report. The investigation took four months, and was based on documents and analysis provided to Global by Wind Concerns Ontario. It took two years for Wind Concerns to get the documents from the Ministry of the Environment and Climate Change (MOECC) under Freedom of Information legislation.
In over half the cases in the documents, the MOECC made no response; in others there was limited response. The Ministry relied upon wind power companies “predicted modeling” to determine whether noise exceedance was possible. When actual measurements of noise were done, they were limited to a narrow range of audible noise and did not include low frequency or tonal noise.
Minister Glen Murray told the Legislature yesterday after a barrage of questions from Opposition MPPs that the Ministry will now be including “tonal” noise in its measurement; the Minister still insists there is no problem, and told Global News that he has no complaints on his desk at present — Wind Concerns Ontario documents show almost 3,200 complaints filed between 2006 and 2014.

http://globalnews.ca/video/3498008/ontario-wind-turbine-complaints-fall-on-deaf-ears/
http://globalnews.ca/video/3498012/community-fed-up-with-ministrys-response-to-wind-turbine-complaints

Wind turbines are a nightmare: Ontario family

31 Wednesday May 2017

Posted by ottawawindconcerns in Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Brian Hill Global, Global News, La Nation, MOECC, North Stormont, Ontario Ministry of the Environment and Climate Change, The Nation, Wind Concerns Ontario, wind farm noise, wind turbine noise

Global News has a report today on information related to wind turbine noise complaints.

Carla Stachura and her husband Mike thought they’d found the perfect spot to retire.

A house in rural Ontario where they run a wildlife sanctuary with lamas and a variety of birds, and planned to spend their retirement years enjoying the peace and quiet of country life.

But that dream was shattered when wind turbines began popping up near their Goderich, Ontario home. Since then, their dream has become a nightmare. The couple says they’ve been unable to sleep and exposed to prolonged periods of annoying noise. Adding to their frustration, they say the provincial government won’t lift a finger to help them, other than order more tests.

“We’ve been having issues since they turned the turbines on,” said Carla.

The couple purchased the property in 2003. They say it was paradise until the K2 Wind Farm, operated by Pattern Energy, started operations in the spring of 2015.

READ MORE: Ontario residents fight wind turbines planned near Collingwood airport 

“I immediately called K2,” Carla said.

Over the past two years, officials from the ministry have measured violations of the province’s noise limits at the couple’s home on two occasions, first in August 2015 and again in March 2017. Despite these violations, the couple says the government has done nothing other than order more tests.

Ministry of Environment does not respond to majority of wind turbine complaints

The Stachura’s complaints of government inaction are not unique. In fact, Global News has learned that Ontario’s Ministry of the Environment and Climate Change does not respond to the majority of complaints made by residents concerned about wind turbines.

Documents released through Ontario’s Freedom of Information Act and obtained by Global News reveal officials from the Ministry of Environment chose not to investigate or deferred responding to – meaning they did not make immediate plans to investigate – roughly 68 per cent of all noise and health complaints lodged against wind turbine operators in the province between 2006 and 2014. This represents nearly 2,200 individual complaints.

The documents also show limited resources sometimes prevented the ministry from responding to complaints.

Originally obtained by Wind Concerns Ontario, the documents include a list of 3,180 complaints. They also include a 458-page collection of “master incident reports,” which the ministry has verified as authentic, detailing the ministry’s response – or lack thereof – in cases where residents complained multiple times.

The documents show that in 54 per cent of all cases – more than 1,700 individual complaints – the ministry did not investigate residents’ concerns. In another 450 cases, roughly 14 per cent of total incidents, the ministry deferred responding to complaints.

In most cases, the documents do not reveal why the ministry chose not to respond. Instead, they tend to focus on whether the wind farm was compliant with ministry standards or past efforts to resolve residents’ concerns.

“The lack of response from the ministry shows just how unprepared they were for the potential effects of putting these giant machines so close to people and their communities,” said Jane Wilson, president of Wind Concerns Ontario.

Read more here, and watch the story today on Global News.

Two wind power projects have contracts but not Renewable Energy Approvals yet in the Ottawa area: the Nation Rise project in North Stormont (Finch, Berwick) and Eastern Fields in The Nation (St Bernardin, Casselman).

Wind Concerns Ontario is recommending that approvals not be granted for these projects, and that new tougher noise standards be developed for turbines, and enforced.

← Older posts

Recent Posts

  • Net Zero, renewables, natural gas ban a hot issue in Eastern Ontario
  • What do we know about Battery Energy Storage? Not much
  • Ottawa Council votes unanimously to hold approvals of new power generation installations until protective bylaws in place
  • Rural councillors propose motion to protect health, safety
  • Prince Edward County rejects battery storage proposal

Follow me on Twitter

My Tweets

Enter your email address to follow this blog and receive notifications of new posts by email.

Tags

Bob Chiarelli electricity bills Ontario Green Energy Act IESO Ontario Ottawa wind concerns wind farm wind farms wind power wind turbines

Contact us

PO Box 3 North Gower ON K0A 2T0

Create a free website or blog at WordPress.com.

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Follow Following
    • Ottawa Wind Concerns
    • Join 369 other followers
    • Already have a WordPress.com account? Log in now.
    • Ottawa Wind Concerns
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...