• About
  • Donate!
  • EVENTS
  • Ottawa’s “Energy Evolution”: wind turbines coming to rural communities
  • Thinking of signing a wind turbine lease?
  • Wind Concerns Ontario
  • Wind turbines: what you need to know

Ottawa Wind Concerns

~ A safe environment for everyone

Ottawa Wind Concerns

Tag Archives: wind farm

MPP Smith: end taxpayer support for wind farm environmental damage

24 Friday Apr 2015

Posted by Ottawa Wind Concerns in Renewable energy, Wind power

≈ 2 Comments

Tags

Blanding's Turtle, Gilead Power, Glen Murray, Ministry of the Environment, Ontario, prince Edward County, taxpayers Ontario, Todd Smith, wind farm, wind farm environmental damage, wind power

Reposted from Wind Concerns Ontario, today. Todd Smith, MPP for Prince Edward-Hastings, rose in the Ontario Legislature yesterday with a question for Environment Minister Glen Murray. In lieu of the fact that the Ontario Court of Appeal upheld the decision by the Environmental Review Tribunal to rescind approval for a wind power development that would cause serious and irreversible harm to an endangered species, Smith said, would the Minister’s department now stop development on that site and further, stop aiding the wind power developer to destroy the ecosystem on the south shore of Prince Edward County? Minister Murray said he commended the Prince Edward County Field Naturalists for their activism (saying nothing about the hundreds of thousands of after-tax dollars spent by Ontario citizens to protect the environment form thew Ministry of the Environment), and offered to meet with the MPP on this issue. See the video of the exchange here.

Ontario wind farm halted by endangered turtles

21 Tuesday Apr 2015

Posted by Ottawa Wind Concerns in Renewable energy, Wind power

≈ 1 Comment

Tags

Blanding's Turtle, endangered species Ontario, environmental damage wind farm, Eric Gillespie, Frederic Beaudry, Gilead Power, Ontario, Ontario Court of Appeal, Ontario Ministry of NAtural Resources, Ontario Ministry of the Environment, prince Edward County, Prince Edward County Field Naturalists, wind farm, wind power

 

Globe and Mail, April 21, 2015

A turtle that insists on crossing a road has put a stop to a massive wind-energy development in Eastern Ontario.

The Ontario Court of Appeal ruled on Monday that a 324-hectare, nine-turbine wind farm proposed for the south shore of Prince Edward County puts a population of endangered Blanding’s turtles at risk of dying out in that region’s wetland. The risk is posed not by the wind farm itself but by 5.4 kilometres of roads to and from the site. Experts said the turtles, which range widely as part of their natural life cycle, would inevitably try to cross those roads, exposing them to vehicles, predators and human poachers.

The ruling restores an environmental tribunal’s 2013 decision that the wind farm, while not posing a serious risk to human health, would cause “serious and irreversible” harm to the Blanding’s turtle. That ruling had been rejected by Ontario Divisional Court partly because the tribunal did not know how many turtles live in the provincially significant wetland.

But the Ontario Court of Appeal said the number of turtles at risk does not matter. “The number of Blanding’s turtles, no matter what that number is, satisfies the criteria” for being deemed threatened and endangered, the court said in a 3-0 ruling written by Justice Russell Juriansz. It cited testimony from Frédéric Beaudry, a wildlife ecologist at Alfred University in New York State, that the number is “likely small.”

The Court of Appeal ruling means the case now goes back to the environmental tribunal to decide what should happen with the project, including whether an alternative plan can be permitted that takes the turtles into account. The company involved, Ostrander Point Wind Energy LP, had proposed at an earlier stage to close the road to public access.

The ruling is a setback for Ontario’s multibillion-dollar wind energy business. “It will mean that, in future, wind companies are going to have to pay attention to some of these environmental effects,” said Stephen Hazell, director of conservation and a lawyer with Nature Canada, which supported the suit launched by the Prince Edward County Field Naturalists, a local conservancy group.

Mr. Hazell added that other groups with concerns about the impact of wind projects in their own jurisdictions now have “a legal test that in some cases they may be able to meet.”

During the initial hearing, conservationists argued that the wind project would have adverse effects on a number of species, including migratory birds, but the final decision came down to the Blanding’s turtle alone because of its extreme sensitivity to human activity, particularly roads.

With a bright yellow throat, a gentle disposition and an expression that resembles a perpetual smile, the species makes a tempting target for poaching, even by well-meaning individuals looking for an unusual pet. But Blanding’s turtles usually die once they are captured or released in a different location.

Ponderously slow to grow and mature, females of the species generally do not reproduce until they reach 18 years of age. Even then, they may only lay eggs every other year. The turtle’s long life span offsets its slow replacement rate – adults may live 90 years or more – but only in places when individuals have a good chance of avoiding lethal encounters along the way.

“Losing a couple of females can, in the long run, do a population in,” said Dr. Beaudry, a world expert on the species.

He added that he had no doubt the turtles would be crossing the roads if the wind project went ahead, as they typically travel for kilometres from the places where they hatch in search of food or mates.

Blanding’s turtles are considered globally endangered. Small populations are found in scattered pockets from the American Midwest to Nova Scotia.

OWC editor’s note: counsel for the Prince Edward County Field Naturalists was Eric Gillespie, environmental lawyer based in Toronto. Ottawa Wind Concerns has Mr Gillespie’s firm on retainer.

Citizens’ group: Radiation Emissions Act in force for wind farms

16 Thursday Apr 2015

Posted by Ottawa Wind Concerns in Health, Ottawa, Renewable energy, Wind power

≈ 3 Comments

Tags

acoustic emissions, CFREE, Council of Canadian Academies, environmental health, Green Energy Act Ontario, Health Canada, health impacts wind turbines, Healthy Environments and Consumer Safety Canada, Joan Morris, Ministry of Health Canada, radiation emissions, Radiation Emitting Devioces Act, Rona Ambrose, wind farm, wind industry, wind turbine noise

Here is a statement from a citizens’ group, Canadians for Radiation Emissions Enforcement (CFREE), which posits that wind turbines’ acoustic emissions are covered under federal law, the Radiation Emitting Devices Act.

The group has responded to the recently released report on wind turbine noise and health by the Council of Canadian Academies. Their full statement is available on CFREE’s weblog, available here.

An excerpt follows:

It is prescribed in the REDA [Radiation Emitting Devices Act]that if an importer or operator of a device such as a wind turbine is made aware of risk of personal injury or  impairment of health they must “forthwith notify the Minister” [of Health for Canada]. CFREE asks why wind developers did not follow this law seven years ago when people first reported problems to them about the impacts of the noise emitted from turbines operating in their vicinity.

“If developers had complied with the law and reported the complaints to Health Canada, investigations would have been carried out back then before the Green Energy Act. This could have advanced the understanding a long time ago and avoided risk of harm to those living close to these facilities” said Joan Morris, an epidemiologist and Chair of CFREE.

No good reason for wind turbinesHydro One, electricity bills, wind power, wind turbines, cost of renewable, Ontario electricity bills, : says letter writer

16 Thursday Apr 2015

Posted by Ottawa Wind Concerns in Ottawa, Renewable energy, Wind power

≈ 3 Comments

Tags

Hydro One, Ontario, Ontario electricity bills, West Carleton Review, wind farm, wind power, wind turbines

Provincial government, Hydro One both to blame for the mess

West Carleton Review

To the Editor:

Your April 9 edition of the West Carleton Review contained a number of articles and letters to the editor regarding our sad state of affairs with regard to Hydro in Ontario.

Hydro in the last century has become one of our essential services, and as the ice storm of 1998 demonstrated, our lives revolve around electricity to power everything in our homes and even the gas stations that fuel our vehicles.

However, in Ontario the distribution, sale and production of hydro is treated as a political spectator sport with boondoggles, lies, smart meter errors, overpaid employees and corruption being the order of the day.

Even the Auditor-General (AG) has taken this government to task regarding hydro, but the Minister, Bob Chiarelli, tries to shame the AG by stating that it is a complicated file and she doesn’t have the knowledge required to ascertain the problems at hydro, let alone recommendations on how to fix them, a fact that was quickly debunked when we found out that the AG used to work for Manitoba Hydro.

I feel it is the minister that is “out of his league” on this file.

And now the same minister and government want to implement a low-income plan to help pay for the most expensive electricity in North America by further increasing the cost of electricity to the millions who will not qualify for this subsidy since the bar has been set so low as to be mostly ineffective and unavailable to most customers of hydro. This certainly appears to be nothing else but a PR exercise on the part of the government.

There is no good reason why we should have installed so many wind turbines or solar farms, both of which need an alternative back-up source of electrical power, since both wind and sun are unreliable sources of continuous energy available on demand.

The fact that there is no available mechanism to store surplus electrical power produced by wind or solar, Hydro One sells it on the open market at a substantial loss. Unfortunately, the current government has tied their hands for quite a few more years with multi-billion dollar contracts to foreign companies to supply either the turbines or the solar panels.

In my estimation, the only solution to the mess created by this government is to buy power from reliable and affordable sources of electricity producing jurisdictions, such as Quebec Hydro or Manitoba Hydro.

Hydro One cannot be trusted to produce the required amount of affordable power required and this government, regretably, has created most of the current (no pun intended) mess it finds itself in on the hydro file.

Richard Gaudet

Kinburn

Surplus power in Ontario: $4 billion lost

13 Monday Apr 2015

Posted by Ottawa Wind Concerns in Wind power, Renewable energy

≈ 2 Comments

Tags

Ontario economy, Parker Gallant, wind power, Green Energy Act, electricity bills Ontario, hydro bills Ontario, wind farm, surplus power Ontario, George Smitherman

From Wind Concerns Ontario:

Wind output up, exports up, cost of electricity up— no coincidence

Five years ago, in 2009, George Smitherman, Minister of Energy during the McGuinty reign, rammed through the Ontario Legislature the Green Energy and Green Economy Act.  The Act ushered in the FIT (Feed In Tariff) and MicroFIT programs, attracting corporations from around the world who wanted the lucrative power contracts being let by the government-mandated Ontario Power Authority.

The result of the Act is now evident with huge chunks of rural Ontario covered with solar panels and spiked by 500-foot industrial wind turbines cranking out intermittent electricity, surplus to our demand, 99.9% of the time.

Early in 2010, the Independent Electricity System Operator (IESO) advised us of electricity generation    for Ontario by fuel type for 2009.  The headline in their press release stated: “Wind Power in Ontario Generates a New Record in 2009.” Wind produced 2.3 terawatt hours (TWh) or 1.6% of Ontario’s total demand of 139 TWh.   The same press release noted Ontario exported 15.1 TWh, and wind’s percentage of those exports was 15.2%.  The release also disclosed the average HOEP (hourly Ontario electricity price) for 2009 was $31.6 million per TWh, and the Global Adjustment (GA) $30.6 million/TWh.

That means, the costs of power generation (on average) were $60.2 million per/TWh.

Wind significant share of the loss

In 2009, Ontario exported 15.1 TWh generating revenue of $477.2 million (15.1 TWh x $31.6 million), but the TWh exported cost Ontario ratepayers $909 million (15.1 TWh X $60.2) — that means Ontario lost $432 million.  The cost of power production from wind was $283 million (2.3 TWh X $123 million/TWh), representing 65.5% of the losses on the exported TWh.

Fast forward five years to January 2015: IESO’s announcement indicated Ontario’s demand in 2014 was 139.8 TWh. Wind was 6.8 TWh, or 4% of all generation.  Exports grew to 19.1 TWh and wind’s percentage of exports shot up to 35.6%.   HOEP was $36 million/TWh and the GA jumped to $54.6 million/TWh, making the all-in-cost to Ontario’s ratepayers $90.6 million/TWh.   The cost to produce 19.1 TWh was $1,730 million (19.1 TWh X $90.6 million), and revenue generated from the sale was $688 million (19.1 TWh X $36 million). That left Ontario’s electricity ratepayers to pick up the $1.042 billion shortfall.  The cost for 6.8 TWh of wind was $836 million plus another $42 million1. for curtailed wind bringing its cost to $878 million, representing 84 % of export losses.

$4 billion

The all-in-cost of Ontario’s electricity generation jumped from 6.2 cents/kWh in 2009 to 9.06 cents/kWh in 2014, an increase of 46%. Ratepayers picked up an additional burden of $4,048 million for 139.8 TWh.

The extra .8 TWh (800 million kWh) Ontario ratepayers consumed in 2014 versus 2009 cost us over $4 billion or $5.06 per/kWh, much of it was caused by the push for renewable energy and the need to have back-up power plants for when the wind is not blowing or the sun isn’t shining.

Imagine how many subway stations or hospitals $4 billion might have built.

©Parker Gallant

April 13, 2015

What’s the true cost of wind power? Plenty, says NEWSWEEK

13 Monday Apr 2015

Posted by Ottawa Wind Concerns in Renewable energy, Wind power

≈ 2 Comments

Tags

back-up wind power, electricity bill, electricity bills, electricity from wind, power, reliability wind power, subsidies wind power, wind energy, wind farm, wind farms, wind power, wind power developers

What’s the True Cost of Wind Power?

Newsweek OPINION

By Randy Simmons 4/11/15 at 5:22 PM

As consumers, we pay for electricity twice: once through our monthly electricity bill and a second time through taxes that finance massive subsidies for inefficient wind and other energy producers.

Most cost estimates for wind power disregard the heavy burden of these subsidies on U.S. taxpayers. But if Americans realized the full cost of generating energy from wind power, they would be less willing to foot the bill—because it’s more than most people think.

Over the past 35 years, wind energy—which supplies just 2 percent of U.S. electricity—has received $30 billion in federal subsidies and grants. These subsidies shield people from the uncomfortable truth of just how much wind power actually costs and transfer money from average taxpayers to wealthy wind farm owners, many of which are units of foreign companies.

Proponents tend to claim it costs as little as $59 to generate a megawatt-hour of electricity from wind. In reality, the true price tag is more than two and a half times that.

This represents a waste of resources that could be better spent by taxpayers themselves. Even the supposed environmental gains of relying more on wind power are dubious because of its unreliability—it doesn’t always blow—meaning a stable backup power source must always be online to take over during periods of calm.

But at the same time, the subsidies make the U.S. energy infrastructure more tenuous because the artificially cheap electricity prices push more reliable producers—including those needed as backup—out of the market. As we rely more on wind for our power and its inherent unreliability, the risk of blackouts grows. If that happens, the costs will really soar.

Read more of this article from Newsweek, here.

Ottawa Wind Concerns at Agricultural and Rural Affairs today

02 Thursday Apr 2015

Posted by Ottawa Wind Concerns in Uncategorized

≈ 3 Comments

Tags

EDP Renewables, North Gower, North Gower wind farm, Ottawa, Ottawa wind concerns, wind farm, wind power, wind power project, wind turbines

 

Ottawa Wind Concerns will present an overview of the new Ontario contracting process for wind power at the Agricultural and Rural Affairs committee today.

The group has prepared a presentation that outlines the process for developers, based on the 100-page document from the Independent Electricity System Operator or IESO, and has added recommendations for the City of Ottawa, should a proposal for a wind power project come forward.

“Our rural communities are completely opposed being industrialized for wind power projects, to produce power Ontario doesn’t need,” says chair Jane Wilson. “Almost 1,300 residents of the North Gower area signed a petition in 2013 to say they do not support a wind power project in their community, due to the economic and social costs.”

Ontario is contracting for 300 more megawatts of wind power in 2015, which will cost Ontario $200 million annually.

U.S.-based EDP Renewables has stated it is planning to propose 30-50 turbines just 30 minutes south of Ottawa, in North Dundas.

Ottawa Wind Concerns is a community group and corporate member of Wind Concerns Ontario.

 

Federal law and protecton from wind turbine noise

30 Monday Mar 2015

Posted by Ottawa Wind Concerns in Ottawa, Renewable energy, Wind power

≈ 2 Comments

Tags

Conservative government Canada, Dale Goldhawk, federal law emissions, federal law radiation, Government of Canada, wind farm, wind farm infrasound, wind farm noise

Appearing on Goldhawk Fights back on Zoomer Radio at 11;30 AM today will be epidemiology exert Joan Morris and wind farm appellant Shawn Drennan, to speak on whether federal legislation for radiation emissions covers the noise and infrasound emissions from utility-scale wind turbines.

Listen at AM740 in southern Ontario, or online Listen Live at ZoomerRadio.ca

Next showing of Big Wind documentary: Tuesday at 10 PM

30 Monday Mar 2015

Posted by Ottawa Wind Concerns in Uncategorized

≈ 4 Comments

Tags

adverse health effects wind farms, adverse health symptoms wind farm, Big Wind documentary, CanWEA, Shawn Drennan, transformer stations, TVOntario, wind farm, wind power, wind turbines

TVOntario is showing the new documentary film Big Wind again on Tuesday, March 31st, at 10 PM

The film documents the legal struggle of one farm family in Ontario about to be surrounded by over 100 wind turbines and two transformer stations, and other communities already dealing with the effects of living near the huge power generating machines.

Key interviews include former nursing teacher Norma Schmidt, whose sleep was so disturbed she became ill and had to leave her job; she and her husband are now unable to live in the family home. Another is with a farmer who has a turbine on his property, and thus receiving lease payments; he said “We decided we weren’t going to be bothered” by the turbine.

One wind developer was interviewed for the film but Head Office later tried to have all the recording erased; last week the Canadian Wind Energy Association (CanWEA, the lobby group for the developers in Canada) claimed it was too bad no wind developers were interviewed for the film!

A podcast of Big Wind, and a special edition of The Agenda which featured a panel discussion on the effects of wind power on communities, are available on the TVOntario website at TVO.org

Energy Minister Chiarelli on CFRA today

27 Friday Mar 2015

Posted by Ottawa Wind Concerns in Renewable energy, Wind power

≈ 3 Comments

Tags

Bob Chiarelli, CFRA, electricity bill increases, energy poverty, hydro bills Ontario, Large Renewable Procurement Ontario, Not a Willing host, Ontario consumers, Ontario electricity bills, Ottawa, Ottawa wind concerns, Steve Madely CFRA, wind farm, wind power

After “boasting” that projected electricity bill increases will result in $120 more on electricity customers bills a year yesterday in Toronto, Ontario Energy Minister Bob Chiarelli is a guest on CFRA’s The Home Page at 1 p.m.

Morning show host Steve Madely disputed Chiarelli’s math on his CFRA show this morning, saying by his calculation, the increase in electricity bills will be at least $140…and that Ontario consumers can ill afford it.

Chiarelli acknowledged that the increases are due to Ontario’s “investment” in “green” energy.

That doesn’t make economic sense, says Ottawa Wind Concerns Chair Jane Wilson. “Wind power which is today less than 4% of Ontario’s power capacity, actually represents 20% of the utility cost,” she says. “And because Ontario has a surplus of power, we are exporting a significant part of that at a loss to the United States, while we are paying wind power developers billions. Yet consumers are being asked to pay more–this is just nuts.”

Ontario opened its new contracting process for large renewable power projects on March 10; it is not clear whether a large wind power generation project will be proposed for the rural Ottawa area. The City passed a resolution in 2013 saying it did not support a wind “farm” in North Gower, and demanded a return of local land use planning powers that were removed by Ontario’s Green Energy Act.

Call in to the radio station at 613-521-8255, and listen at 580AM in Eastern Ontario, or live online at cfra.com

ottawawindconcerns@gmail.com

← Older posts
Newer posts →

Recent Posts

  • Land use conflict prompts citizen legal action over West Carleton battery storage site
  • Energy Minister Stephen Lecce speaks out on renewable power sources wind and solar; emphasizes cost, reliability
  • Open letter to CAFES Ottawa
  • Ottawa Wind Concerns supports West Carleton residents
  • What does wind ‘farm’ construction really look like?

Follow me on Twitter

My Tweets

Enter your email address to follow this blog and receive notifications of new posts by email.

Tags

Bob Chiarelli Green Energy Act IESO Ontario Ottawa Ottawa wind concerns wind energy wind farm wind power wind turbines

Contact us

PO Box 3 North Gower ON K0A 2T0

Create a free website or blog at WordPress.com.

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Subscribe Subscribed
    • Ottawa Wind Concerns
    • Join 379 other subscribers
    • Already have a WordPress.com account? Log in now.
    • Ottawa Wind Concerns
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar