• About
  • Donate!
  • EVENTS
  • Ottawa’s “Energy Evolution”: wind turbines coming to rural communities
  • Thinking of signing a wind turbine lease?
  • Wind Concerns Ontario
  • Wind turbines: what you need to know

Ottawa Wind Concerns

~ A safe environment for everyone

Ottawa Wind Concerns

Author Archives: Ottawa Wind Concerns

Ontario seeking bids for offshore turbine noise study

08 Monday Sep 2014

Posted by Ottawa Wind Concerns in Renewable energy, Wind power

≈ 3 Comments

Tags

Dalton McGuinty, Great Lakes wind farms, noise impact, noise studies, offshore wind, Offshore Wind Farm noise impacts, offshore wind farms, offshore wind turbines, Ontario, Ontario Liberal, property values, wind farm Lake Erie, wind farm Lake Huron, wind farm Lake Ontario, wind farm moratorium

Just prior to the 2011 Ontario election, the Dalton McGuinty government announced a “moratorium” on offshore wind development. It was widely thought this move was to stave off any criticism (and lost votes) from Toronto, the Ontario Liberal stronghold, as there was significant opposition to a project proposed off the Scarborough area, where lake views are prized.

Now, it’s 2014, and the Liberals have a majority and four years ahead in power.

Last Friday, a request for proposal for a noise impact study for offshore wind “farms” was posted on MERX here.

Details here:

echnical Evaluation to Predict Offshore Wind Farm Noise Impacts in Ontario

Detailed Description
This Request for Proposals is an invitation to prospective proponents to submit proposals for the Technical Evaluation of Sound Propagation Modelling Methodologies to Predict Offshore Wind Farm Noise Impacts in Ontario.

Scope of Work
The Preferred Proponent will be required to conduct a technical evaluation of sound propagation modelling methodologies to predict Offshore Wind Farm noise impacts in Ontario (the “Study”), and create a report about the Study to the satisfaction of and for approval by the Ministry (the “Study Report”). The scope of work to be performed by the Preferred Proponent includes:

(i) Conducting a literature review and consulting technical and government specialists;

(ii) Preparing and submitting the Study Report based on the literature review and consultation;

(iii) Providing the chapters of the Study Report to the Ministry in draft form for review, comment and approval by the Ministry, and revising the chapters and final Study Report to the satisfaction of the Ministry; and,

(iv) Participating in kick-off meeting/teleconference and periodic teleconferences with Ministry staff as required.

Field measurements, validation testing and/or the purchase of Offshore Models are outside the scope of this study.

 

Note that this is essentially a literature review and actual noise measurement is “outside the scope”; we expect that the wind industry lobby will contribute heavily to this “study.”

Offshore wind power generation projects have been proposed for several areas in Lakes Ontario, Erie and Huron. Concerns about such development range from worries about noise (turbine noise produced at Wolfe Island is experienced across the water in New York State), damage to the lake beds, especially Erie, where the toxic substances have settled, and for property values of adjacent properties.

Email us at ottawawindconcerns@gmail.com

 

 

Chatham-Kent airport turbines still not removed: company fighting Transport Canada order

03 Wednesday Sep 2014

Posted by Ottawa Wind Concerns in Wind power

≈ Leave a comment

Tags

aviation safety, GDF Suez, Mike Crawley, Transport Canada, wind farm

Turbines near Chatham-Kent Municipal Airport (Photo by Trevor Thompson)

Blackburn News, September 2, 2014

Photo: Trevor Thompson

An appeal to an order to have wind turbines removed at the Chatham-Kent Municipal Airport continues to move through the federal process.

Renewable Energy company GDF Suez is arguing that the turbines don’t pose any danger to incoming or outgoing aircraft. But Transport Canada disagrees, and has ordered them removed by the end of the year.

According to a Transport Canada email sent to BlackburnNews.com, a board is being formed to review the company’s appeal and hear the government’s reasoning for the removal order.

The government says the board will be made up of one or more impartial representatives. There’s no word on when the board will be formed or when the hearing will take place.

Read the full story and comments here.

Editor’s note: GDF Suez is headed by Mike Crawley, former president of the Ontario Liberal Party, and the Liberal Party of Canada. Anyone who saw the documentary Down Wind is aware of Mr Crawley’s success in reaping millions of dollars worth of wind power contracts from the ONtario government.

Ontario doesn’t need more wind power: WCO

01 Monday Sep 2014

Posted by Ottawa Wind Concerns in Renewable energy

≈ Leave a comment

ONTARIO DOESN’T NEED MORE POWER SAYS WIND CONCERNS ONTARIO

Large Renewable Procurement means higher electricity bills for consumers

September 1, 2014, Toronto— Ontario’s new Large Renewable Procurement process aims to add more expensive, intermittent wind power to Ontario’s power capacity at a time when Ontario doesn’t need the power, and can’t afford new generation, says Wind Concerns Ontario.

In comments made to the Ontario Power Authority on the draft new procurement process for “renewables” such as wind and solar, the advocacy organization said it cannot understand why suppliers for more power are being sought at this time.

“Ontario lost more than $1.5 billion last year because we had power being produced at the wrong time of day for people to use it,” says president Jane Wilson. “We had to sell it off to other jurisdictions like neighbouring U.S. States at bargain-basement prices. And now, we ‘re looking for more? It doesn’t make sense.”

Adding more renewables to the mix will increase electricity bills for Ontario’s already strapped consumers. “I am very concerned about energy poverty,” Wilson, a registered nurse, says. “We are hearing from young people and seniors who say they have reached or exceeded their limits and just can’t pay any more. Why is Ontario scaling back on cheap hydro power, and looking to buy more expensive wind?”

Wind Concerns Ontario also noted concerns about the approval process for wind power projects. At present 85 municipalities in Ontario have declared themselves to be unwilling hosts to the wind power plants, which can reduce property values, diminish attractiveness for tourists, and produce noise and vibration that disturbs sleep and affects health for some residents. Seven projects have been approved since the June election, Wind Concerns says. The cost of those projects works out to $135.7 million a year or $2.7 billion over the life of the 20 year contracts, or an additional $28.28 per household every year.

“Kathleen Wynne, Bob Chiarelli and their government keep saying that they are not going to ‘force’ wind power projects on communities,” Wilson says, “but just last week they approved a huge power project at Plympton-Wyoming in Lambton County—that community has been very clear about its wishes. This new process fails to define what community approval means. Our communities need to know that, now.”

Wind Concerns commented on other issues with the Ontario Power Authority such as a need for power developer to disclose all the impacts of a proposed project to local governments, for their sales staff to adhere to a code of practice, and for wind power contracts to contain measures that allow landowners to change their minds about having turbines on their property.

Wind Concerns Ontario is a coalition of community groups and individuals concerned about the potential impact of large-scale wind power generation projects on the economy, on the natural environment and wildlife, and on human health.

Read the full Wind Concerns Ontario comment to the Ontario Power Authority on the new Large Renewable Procurement process here: Aug23Input into Large Renewable Procurement RFP Framework

Parker Gallant on Hydro One: use less, pay more

01 Monday Sep 2014

Posted by Ottawa Wind Concerns in Uncategorized

≈ Leave a comment

Tags

electricity rates, energy poverty, hydro bills, hydro bills Ontario, Hydro One, LDCs, Parker Gallant

Reposted from Wind Concerns Ontario

What Hydro One is doing to over a million ratepayers is a shame

People who know me know it’s like Christmas for me when the Ontario Energy Board (OEB) posts the Yearbook of Distributors and it’s true, the data is a big gift!  You can imagine how a banker might react when confronted with the details the OEB releases.  It gets better when you look at it in detail.

Here is my take on the information as it relates to Hydro One, only one of Ontario’s 73 LDCs (local distribution companies). Hydro One is a monopoly that services 1,221,100 customers (according to the Yearbook) in Ontario, and has exclusive rights to the transmission of energy generation.  Caution some of the fact that follow may disturb some readers.

  • Total Hydro One full-time employees as at December 31, 2013 was 5,641, plus what are referred to as “non-regular” employees numbering 2,109.  In 2002 Hydro One had 3,933 regular employees, so full-time employees have grown by 1,708 (up 43.4%).
  • In 2002, Hydro One had 1,219,614 customers; at year-end December 31, 2013, they reported 1,221,100 customers but they apparently needed 1,708 additional full-time employees to service those additional 1,486 customers.   (The number of “non-regular” employees for 2002 was not available.)
  • Total “Purchased Power” by the 73 local distribution companies in 2013 was 125,306 million kWh and by Hydro One was 25,829 million, or 20.6% of the total. Yet Hydro One services 24.7% of all Ontario ratepayers.
  • The average OMA (operations, management and administration) costs for the 73 local distribution companies was $325.00 per ratepayer, but for Hydro One’s customers it was $495.60—that’s $170.60 more, or 52.5% higher.
  • If one removes the hard data for Hydro One and calculates the OMA for 2013 for the 72 LDCs the average comes to $269,  meaning Hydro One’s OMA is 84.8% higher. For 2012 it was only (I use the term lightly) 65.4% higher.
  • Gross Income (net of Power Purchased) was $3.418 billion for all 73 local distribution companies but for Hydro One it was $1,323 billion or 38.7% of all the Gross Revenue from those 24.7% of ratepayers.
  • Net Income, after PILT (payment in lieu of taxes) was $624.6 million for the 73 local distribution companies and $258.3 million for Hydro One—that represents 41.3% of Net Income for only 24.7 of all ratepayers.
  • Average monthly kWh (kilowatt hours) consumed per customer was 2,112 for all customers of the 73 local distribution companies, but only 1,764 kWh for Hydro One’s customers. That means Hydro One’s customers consume 16.5% less kWh. But… (see the next bullet for the other shoe to drop).
  • Average Power & Distribution Revenue less Cost of Power & Related Costs per customer annually for all customers for the73 local distribution customers was $691.35; for Hydro One (24.7% of all ratepayers) it was $1,084.10— a difference of $392.75 or 56.8% higher for Hydro One ratepayers.
  • Average Power & Distribution Revenue less Cost of Power & Related Costs per total kWh purchased for all 73 local distribution companies was 0.027 cents/kWh; for Hydro One customers it was 0.051 cents/kWh, a difference of 0.024 cents or about 89% higher.
  • Line losses, which we are all billed for, vary and those averaged 4.1% for all 73 local distribution companies; but for Hydro One they amounted to 6.8% or 69.5% more.
  • If one adds the 900 employees Hydro One outsourced in 2002 to Inergi to for their customer service/billing process to the 3,291 reported to be employed in their LDC unit, and then add that number to the 10,022 employees all 73 LDCs reported, Hydro One employees represent 38.4% of all LDC employees, while servicing only 24.7% of all ratepayers.
  • If one calculates the number of customers per employee of the foregoing it works out to 2,914 customers per Hydro One employee and 5,532 for the other 72 LDCs. In other words, employees of the other LDCs support 2,616 more ratepayers per employee compared to Hydro One.
  • Why are Hydro One employees paid more on average if they service 47.3 % fewer ratepayers?

There are a lot more damning statistics that even a mediocre mathematician could use to demonstrate how Hydro One is the least efficient of the 73 LDCs. I believe it is obvious that there are standards applied to municipally owned LDCs that simply do not apply to Hydro One.  They are given carte blanche by the regulator, the OEB,  to run roughshod over 24.7% of all of the ratepayers of the province without consequences.

The Ontario Ombudsman’s report, expected in the fall of 2014, will highlight the mess of Hydro One’s billing system; what will the Ontario Liberal Government do to correct the blatant mistreatment of over a million ratepayers by Hydro One?

©Parker Gallant

August 27, 2014

The views expressed here are those of the author.

MP Cheryl Gallant calls for smart meter investigation

01 Monday Sep 2014

Posted by Ottawa Wind Concerns in Uncategorized

≈ Leave a comment

Tags

Cheryl Gallant, Hydro One, smart meters

For Immediate Release
August 29, 2014.

MP Gallant Investigates Hydro One Smart Meters

Ottawa, Ontario… Cheryl Gallant, MP recently met with Industry Canada officials regarding the controversial Ontario Hydro One “smart meter” program. The meeting was a result of an investigation that was requested by the Renfrew-Nipissing-Pembroke MP due to the thousands of complaints she has received about Hydro One. While the regulation of electricity is a provincial responsibility, measuring devices like electricity meters falls under Federal jurisdiction.

“When I started my investigation into Hydro One so-called smart meters after receiving thousands of complaints from electricity customers, the Saskatchewan smart meter fires that prompted calls to remove all installed meters in that Province were not yet in the media,” observed Cheryl Gallant, MP. “While our Federal Minister of Industry was already working with me in my investigation, the observation that other jurisdictions were experiencing problems with the new electricity meters added a sense of urgency to my investigation,” remarked MP Gallant. “The odd fact about the billing problems and smart meters at Hydro One, is that they seemed to be confined only to the Ontario Provincial Crown Corporation. Ottawa River Power Solutions, one of our locally-controlled electricity distribution companies, verified that in 10 years, they received no complaints about their smart meters.”

“Measurement Canada, the Federal Agency at the Department of Industry tasked with the responsibility to regulate metering devices, confirmed for me the problem is not with individual electricity meters when they are received from the manufacturer for certification. Laboratory tests confirm this. That means the problem is with Hydro One. “Whether it’s corruption of data between meters and the billing department, erroneous estimates where connectivity does not exist, gross incompetency or something else on the part of the provincial government, this merits further investigation.”

“Measurement Canada also confirmed to me its interest is seeing full disclosure on an individual’s Hydro One bill. Of particular note is the charge for “line loss.” It is not clear what the “line loss” or “delivery” charge on someone’s bill is actually for. Actual line loss is an easy calculation. Hydro One and the provincial government have made the calculation so convoluted, this needs an independent investigation. This is all about fairness. Not considered a tax, electrical use increases hurt more than a tax hike because at the end of the day you have less money in your pocket for food, rent, heat mortgage payments and other necessities of life,” concluded Cheryl Gallant, MP.
-30-
For more information contact MP Cheryl Gallant at 613-732-4404

Editor’s note: Cheryl Gallant is a Conservative Party of Canada MP

Read the full story here.

Citizen opposition to wind farms results in ratepayer savings

25 Monday Aug 2014

Posted by Ottawa Wind Concerns in Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

NIMBY, Ontario, Ontario Power Authority, Robert Lyman, Scott Luft, Wind Concerns Ontario, wind farm opposition, wind farms, wind power Ontario, wind power projects

Here is a comment from Ottawa economist Robert Lyman, who is reflecting on a recent post by energy blogger Scott Luft.

Luft believes that citizen opposition to giant wind power projects has resulted in substantial savings for Ontario.

http://coldairings.luftonline.net/post/91257093641/against-the-wind-one-more-1-billion-estimate-plus
I thought I might extract a few of the more salient points that would be of interest to Wind Concerns Ontario.
The article is intended as a status report on industrial wind in Ontario, measured three years after the last batch of feed-in tariff contracts were awarded.  Three years ago, the contracted capacity from wind generators increased from around 4000 MW to around 5800 MW, according to the Ontario Power Authority (OPA). The OPA showed 1958 MW “in service” in 2011.
The Independent Electricity System Operator (IESO), in contrast, currently reports that “installed generation capacity” for wind is 1824 MW, well below the OPA’s figure for 30 months ago. The discrepancy between the two agencies is unexplained. Scott Luft’s interpretation is that actual generation from wind sites has been only about 12.5 % of the grid-connected wind sites. He also estimates, based on OPA data, that Ontario currently has about 2800 MW of generation capacity from industrial wind turbine generators. This is less than half the capacity that was contracted for three years ago.
He believes that the delays in construction of the contracted capacity is clearly the result of “rural NIMBYism”; in other words, the strong efforts of rural communities to push back against wind developers.
How much has this saved Ontario ratepayers?
The feed-in tariff contracts were to pay $135 per MWh. At 2850 MW, a delay of one year in construction pushes back about $1 billion in contract payments. However, the savings to be realized from wind opposition go further. Contracting, which was planned to go to about 8000 MW of capacity, was curtailed below 6000 MW three years ago, and the 2013 Long Term Energy Plan rolled back wind plans by an additional 1200 MW. The deferral on contracting 2000 MW of wind for three years is worth about $2.5 billion, and cancelling 1200 MW altogether could be worth another $8.5 billion over the 20 years of the contract term.

North Gower resident report on K2 wind project

25 Monday Aug 2014

Posted by Ottawa Wind Concerns in Ottawa, Renewable energy, Wind power

≈ Leave a comment

Tags

Capital Power, environmental damage wind farm, Huron County, K2, Pattern Energy, Samsung, wind farm, wind plant, wind power, wind turbines

A resident of North Gower recently visited Huron County, where the K2 wind power project is under construction by a consortium of Samsung, Pattern Energy, and Capital Power. The 270-megawatt 140-turbine power project is located in the Township of Ashfrield-Colborne-Wawanosh.

Billed as “one of Ontario’s most promising renewable energy facilities,” the project was the subject of an appeal (dismissed) and is now being appealed by local residents who are asking for a stay of construction.

Here is what our citizen reporter said:

I just returned from Huron Co from vacation next to the K2 plant which is well into construction. All dire predictions of construction problems have occurred, the concession roads in Ashfield are taking such a pounding from heavy trucks that the $15 m paid to the township won’t begin to replace the damaged roads. While last year no one would talk of wind turbines, this year they will talk of little else; over 85% of residents now are against K2. Very frustrating as it seems people have to experience the degradation to the community before they will pay attention. If such pressure had been applied to the council earlier, perhaps something could have been done. But, maybe not as some of the sitting members have signed on as leasees with Capital-Samsung, in an unbelievable conflict of interest.
Further south at Grand Bend the council is at least appealing a wind plant, probably with no effect but they are trying.
All the more reason to alert residents here of what will occur if a go ahead is ever given to the local wind plant. It will not be pretty to put it mildly, and the wind company will act immediately to expedite the project. By then it will be too late.
Despite being warned about the potential for problems with water (the water table is 12 inches from the surface), Samsung-Pattern-Capital proceeded with the wind project, with the approval of the Ontario government. Almost immediately after construction began, land was flooded and as far as we know, water continues to be pumped and trucked away from the project.

Ontario energy ministers’ hydro rate forecasts off

20 Wednesday Aug 2014

Posted by Ottawa Wind Concerns in Uncategorized

≈ Leave a comment

Tags

Bob Chiarelli, Brad Duguid, electricity bills Ontario, hydro bills Ontario, Hydro One, Parker Gallant, wind power

Parker Gallant: Ontario’s energy ministers’ forecasts: don’t believe a word

Hydro One serves less than one-quarter Ontario customers, yet has more “costs”

In late 2009, with the advent of the Green Energy and Green Economy Act, then Energy Minister George Smitherman proclaimed that electricity rates would only rise by 1% per year.  The 2010 Minister of Energy Brad Duguid launched his personal version of the Long-Term Energy Plan (LTEP) and included a forecast that electricity rates would rise by an average of 7.9 %over the next three years.   In late 2013 Energy Minister Bob Chiarelli produced his LTEP. His forecast? Electricity rates would rise by 42% over the ensuing five years and by 33% over the next three.

George, Brad and Bob have a treat in store: the Ontario Energy Board’s 2013Yearbook of Distributors is now out, and actual results show that all their forecasts appear to have been grossly understated.

Comparing the “cost of power” (COP) for the year ended December 31, 2013 to that of 2012 shows the COP increased by over $1.6 billion (for less consumption) by Ontario’s ratepayers (not including Ontario’s large industrial users and exports) which translated to a 15% jump, well over forecasts of the past and present Energy Ministers.

$350 a year more to our bills

That $1.6 billion jump in the cost of power from 2012 to 2013 added about $350 annually to the typical ratepayers bill.

The Yearbook is a labyrinth of data to be mined for more interesting information.  For example, the OMA (operations, maintenance & administration) costs for 2013 increased by $97 million (6.4%) over 2012 for the 73 LDCs (local distribution company) reporting.  One could assume that the increase can be shared equally by all 73 LDCs, but no: $68 million or 69% of that increase came from Hydro One even though they only service 24.7% of Ontario’s ratepayers.

Looking back to the first Yearbook (2005 year end) and comparing average kilowatts (kWh) consumed per customer per month, you calculate that it has decreased by 11.2% from 2,378 kWh to 2,112 kWh.  At the same time Hydro One customers decreased their usage by only 5.6 % (104 kWh) but started at a much lower average level of consumption. This is surprising in that the OEB allows Hydro One to use a higher average consumption level when applying for a rate increase.  It may be a reflection on the inability of OEB staff to look at data in a different fashion instead of the “isolation” they appear to apply to each and every rate increase application.

In 2012 the OEB started collecting new data referred to as “Full-time Equivalent Number of Employees” (FTE) and if one totes up the numbers you find that the LDC sector had 10,022 FTEs at the 2013 year-end, of whom 3,291 (33%) are FTEs of Hydro One. Again, Hydro One serves just 24.7% of Ontario’s ratepayers.

Take those FTE numbers and use the data supplied in some of the other 102 Yearbook pages you can determine the average cost of each FTE  (adding up OMA costs for 2013, all staffing costs, and then dividing by the number of FTEs).  For 2013, if you deduct Hydro One’s OMA costs and FTEs you get  72 LDCs claimed costs at $1.001 billion and FTEs were 6,731 — so the “average” cost per FTE $148,760.  For Hydro One the OMA costs were $604.7 million for 3.291 employees making the “average” cost for a Hydro One FTE $183,744.  One has to ask, Are Hydro One workers worth the extra $35,000?

The other information that started appearing in the Yearbook a couple of years ago under “liabilities” was what is referred to as “Employee future benefits” (EFB) which one assumes is what the individual LDC has allocated towards pension and other retirement benefits.   For 2013 the EFB for the 72 LDCs (excluding Hydro One) was $468 million and if one simply divides that value by the FTEs (excluding Hydro One) you determine those EFBs average $69,529 per FTE or about $70,000 per employee to cover future pension and post retirement benefits.

Do that for Hydro One and you see they allocated $824 million (increased by $248 million, up 43% in just two years, from 2011) towards their EFBs.  Calculating what that is for each of their 3,291 employees you are better able to understand what the Leech Report highlighted about the unaffordability of the pensions and benefits at Hydro One, OPG, and the other electricity-related Crown corporations. Employees chip in $1 for every $4 of employer (in other words, you and me, the ratepayer) contributions.

Hydro One’s liability for “future benefits” represented almost 64% of the total of “Employee future benefits” at the end of 2013 — again to service just 24.7% of all ratepayers.

In fact, the liability per Hydro One employee of $250,000 at the end of 2013 was more than three times that of the other 72 local distribution companies.

More pain in the future

Ontario finished 2013 with slightly less than 1,200 MW of solar and 2,800 MW of wind in operation.  That amount of wind and solar played the major role in causing the extraordinary jump in the cost of power.  As of March 31, 2014 an additional 3,000 MW of wind generation and 1,000 MW of solar is either contracted for or under construction, which will double the sources of intermittent and unreliable  generation.  Those contracts will push up the cost of power by $350, or more, per annum, for the “typical” householder — in other words,  George, Brad and Bob all missed forecasts by a long shot.

Don’t expect to see the Ontario government tackle the rising costs of electricity caused by the incredibly generous salary and benefits programs and increasing amounts of wind and solar added to the grid. With billions of dollars destined annually for wind and solar developers, and huge shortfalls in the overly generous pensions and future benefits of the (mainly) provincial owned electricity entities, Ontarians will see continuing double digit growth in electricity costs.

Ontario ratepayers simply cannot believe what the Energy Ministers say.

©Parker Gallant

August 18, 2014

The views expressed here are those of the author.

Republished from Wind Concerns Ontario.

Wind farm still a concern in Ottawa

20 Wednesday Aug 2014

Posted by Ottawa Wind Concerns in Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Dan Scharf, EDP Renewables, municipal election Ontario, Ontario Power Authority, OPA, Ottawa wind concerns, Scott Moffatt, South Branch, South Branch wind farm, wind energy, wind farm, wind farm North Gower, wind farm Richmond

People attending a community meeting in North Gower last evening expressed continuing concern about the wind power project that was proposed in 2008 for North Gower-Richmond. The project application has been suspended pending a new application under the Request for Proposal process, which will open in a few weeks.

According to documents obtained by Ottawa Wind Concerns via the Freedom of Information process (thanks to donations from the community) the wind power developer Prowind, was informed of the application suspension in June, 2013, but advised to keep in touch with their contact at the Ontario Power Authority (OPA) about the new opportunity to apply. Prowind maintains a listing for the project on its website.

At that time, Prowind’s documents were “deemed complete” by the OPA, and the company was waiting for a connection to the grid, before the approval process could continue.

Prowind advised The Ottawa Citizen in August 2013, that the company would review the terms of the new process, and re-apply, if appropriate.

In October of 2013, a legal petition bearing more than 1,200 signatures from area residents was presented to the City of Ottawa; council passed a motion that recognized the petition and further, asked the province for a return of local land-use planning powers.

Statements to the effect that the project is now dead are not correct; the OPA has not yet defined its “community engagement” requirement under the new process.

Meanwhile, the OPA has designated Eastern Ontario as a “green light” area for wind power development.

It is expected that the wind power project will be an issue in the upcoming municipal election; incumbent councillor Scott Moffatt wrote a report on the project in last week’s Manotick Messenger, and candidate Dan Scharf has stated he is opposed to it.

The South Branch project, also developed by Prowind and sold to US-based EDP Renewables, has been operating south of Ottawa since March; the turbines are the first 3-megawatt power generators in Ontario.

Email us at ottawawindconcerns@gmail.com 

Tough questions on spending for Energy Minister Chiarelli from Parker Gallant

13 Wednesday Aug 2014

Posted by Ottawa Wind Concerns in Renewable energy, Uncategorized

≈ 1 Comment

Tags

Bob Chiarelli, electricity bills, Energy Bob Chiarelli, energy poverty, government spending, hydro bills, Ontario, Ontario economy, Ontario government grants, Ontario Power Authority, Parker Gallant, Tesla cars

Stipula_fountain_pen

Parker Gallant has written a letter to Ontario Minister of Energy Bob Chiarelli, as a concerned citizen of Ontario. He has included a series of pointed questions on the energy portfolio in Ontario, specifically what value there is for taxpayers and ratepayers, and what the effect will be on the Ontario economy.

Sample questions:

Why does the Ontario Power Authority claim it will pick up old refrigerators for “free” when the truth is, everyone is paying for that service?

Why does Ontario list “conservation” as a source of power when you can’t exactly plug a toaster into it.

Why does Ontario hand out grants of $650 to people buying energy-efficient air conditioners but only give $400 to less than 1% of Ontario’s citizens who are suffering from “energy poverty” and can’t pay their electricity bills? (And don’t get him started on the huge grants to people buying expensive Tesla electric cars…)

Read the full letter here! Letter to Energy Minister with questions

(Originally posted at http://www.windconcernsontario.ca )

← Older posts
Newer posts →

Recent Posts

  • Leiper vows “full implementation” of $57-B Energy Evolution plan
  • Time to get real about wind power in Ontario
  • The stats tell the story: wind doesn’t work
  • Wind power locally: reliably unreliable
  • Has Ottawa lost its focus on city priorities?

Follow me on Twitter

My Tweets

Enter your email address to follow this blog and receive notifications of new posts by email.

Tags

Bob Chiarelli Green Energy Act IESO Ontario Ottawa Ottawa wind concerns wind energy wind farm wind power wind turbines

Contact us

PO Box 3 North Gower ON K0A 2T0

Blog at WordPress.com.

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Subscribe Subscribed
    Ottawa Wind Concerns
    Join 376 other subscribers

    Have a WordPress.com account? Log in now.

  • Ottawa Wind Concerns
    View site in Reader
    Manage subscriptionsSign upLog in
    Report this content
    Collapse this bar
Loading Comments...