• About
  • Donate!
  • EVENTS
  • Ottawa’s “Energy Evolution”: wind turbines coming to rural communities
  • Thinking of signing a wind turbine lease?
  • Wind Concerns Ontario
  • Wind turbines: what you need to know

Ottawa Wind Concerns

~ A safe environment for everyone

Ottawa Wind Concerns

Tag Archives: wind power

David Suzuki: turbines OK at my place (except I don’t really live there)

03 Thursday Apr 2014

Posted by Ottawa Wind Concerns in Renewable energy, Wind power

≈ 1 Comment

Tags

British Columbia coast, David Suzuki, dead birds wind farms, hydroelectric power, wind farms, wind farms bird kills, wind farms environmental damage, wind power

David Suzuki says he’s OK with wind farm near his cabin

David Suzuki: Supporting wind power makes sense

by David Suzuki on Apr 1, 2014 at 4:07 pm

I have a cabin on Quadra Island off the British Columbia coast that’s as close to my heart as you can imagine. From my porch you can see clear across the waters of Georgia Strait to the snowy peaks of the rugged Coast Mountains. It’s one of the most beautiful views I have seen. And I would gladly share it with a wind farm.

Sometimes it seems I’m in the minority. Across Europe and North America, environmentalists and others are locking horns with the wind industry over farm locations. In Canada, opposition to wind installations has sprung up from Nova Scotia to Ontario to Alberta to B.C. In the U.K., more than 100 national and local groups, led by some of the country’s most prominent environmentalists, have argued wind power is inefficient, destroys the ambience of the countryside and makes little difference to carbon emissions. And in the U.S., the Cape Wind Project, which would site 130 turbines off the coast of affluent Cape Cod, Massachusetts, has come under fire from famous liberals, including John Kerry and the late Sen. Edward Kennedy.
It’s time for some perspective. With the growing urgency of climate change, we can’t have it both ways. We can’t shout about the dangers of global warming and then turn around and shout even louder about the “dangers” of windmills. Climate change is one of the greatest challenges humanity will face this century. Confronting it will take a radical change in the way we produce and consume energy—another industrial revolution, this time for clean energy, conservation, and efficiency.
We’ve undergone such transformations before and we can again. But we must accept that all forms of energy have associated costs. Fossil fuels are limited in quantity, create vast amounts of pollution and contribute to climate change. Large-scale hydroelectric power floods valleys and destroys habitat. Nuclear power plants are expensive, create radioactive waste and take a long time to build.
Wind power also has its downsides. It’s highly visible and can kill birds. But any man-made structure (not to mention cars and house cats) can kill birds—houses, radio towers, skyscrapers. In Toronto alone, an estimated one million birds collide with the city’s buildings every year. In comparison, the risk to birds from well-sited wind farms is low. Even the U.K.’s Royal Society for the Protection of Birds says scientific evidence shows wind farms “have negligible impacts” on birds when they are appropriately located.
…

Read the full account here.

We write to OFA rep Straathof

21 Friday Mar 2014

Posted by Ottawa Wind Concerns in Health, Renewable energy, Wind power

≈ 1 Comment

Tags

Debra pretty-Straathof, Green Energy Act, North Gower, OFA, Ontario Federation of Agriculture Executive Member Debra Pretty-Straathof, Ottawa wind concerns, wind farm and health, wind farm North Gower, wind farm Richmond, wind power, wind power Ontario, wind power project

We learned this week that Ontario Federation of Agriculture Executive Member Debra Pretty-Straathof made remarks that our community is “split” over the proposed wind power development.

Really.

So, Ottawa Wind Concerns wrote to Ms Straathof to correct her. Here is an excerpt of that letter.

It is possible you have not seen the news stories about this particular project, and in specific, the fact that the majority of voting age residents last year signed a legal petition which was then presented to and accepted by the City of Ottawa at Council; Council then went on to pass a resolution of support, and to demand that local land-use planning powers be returned to Ontario municipalities.

The petition was the result of a three-week long campaign, which began with a public meeting attended by 300 communities members; in the weeks that followed, dozens of community members gathered signatures on the legal document, and we held a final public event which again, attracted hundreds more residents. The signatures on the petition numbered more than 1,230—this was equal to the TOTAL NUMBER of residents [in North Gower] voting in the municipal election in 2010, according to our Councillor.

The event was reported on by the Ottawa Citizen, the CBC and CFRA, among other media outlets such as the local community papers.

It will also interest you to know that our MP Pierre Poilievre prepared his own petition back in 2012, gathered hundreds of signatures from North Gower residents, and then rose in the House of Commons to present it, and demand that the North Gower wind power project not be approved, or at least wait until the results of the Health Canada study are known.

Our community has been involved in the fight against this inappropriate wind power project for more than four years. Here’s why:

  • Ontario has a surplus of power generation and does not need this wind power project.
  • The project as proposed before the pause in procurement of large scale power projects, was to be a 20-megawatt facility with 8 wind turbines; the turbines would have been within 3 km of more than 1,000 homes—this is completely inappropriate siting.
  • According to property value research done in Ontario, the projected property value loss for the North Gower area would be $134 million. This would pose a hardship for residents, particularly young families and seniors, for whom their home is their prime investment.
  • Reports of health effects due to the environmental noise produced by these machines are mounting throughout Ontario, as you must know; if only 10 percent of North Gower residents were affected, that would still be hundreds of people, many of them children. As proposed, this project would have meant that some children would be exposed to the noise 24 hours a day.

Again, the message this community has given is clear and without argument: a wind power project so close to the village and area residents is not appropriate, not necessary, and not wanted.

Any opinions to the contrary are uninformed.

We have not had the courtesy of a response from the OFA rep as yet. OFA members may wish to write to her themselves and express concern at her lack of awareness on this important issue.

Email us at ottawawindconcerns@gmail.com

Documentary on wind power in Quebec

21 Friday Mar 2014

Posted by Ottawa Wind Concerns in Health, Renewable energy, Wind power

≈ 1 Comment

Tags

MP Pierre Poilievre, Parc eolier de l'erable, Pierre Poilievre, Quebec wind farms, turbine development, wind energy, wind farm noise and health, wind farms noise, wind power, wind power generation

MP Pierre Poilievre sent along this clip for us; it’s a documentary that aired last week on TVA, on the situation with wind power generation developments in Quebec.

It is in French, but here are some of the high points:

-the government noise regulations are that turbines cannot exceed 40 decibels; however, some have been measured at 55+

-“greed” is cited as a factor in the turbine development

-legal actions are ongoing, and citizens are requesting independent noise testing

The link to the documentary is here.

 

European countries revising wind power contracts

20 Thursday Mar 2014

Posted by Ottawa Wind Concerns in Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

cost renewables, Feed In Tariff Ontario, renewable energy, renewable energy contracts, renewable energy producers, renewable energy sector, subsidies for renewables, wind power, wind power Europe

Europe tearing up renewable energy contracts (you can too, Bob)

Europe’s renewable energy investors are facing a harsh reality – that the promises from politicians can be taken away at any moment. Canada’s renewable energy investors may soon face that same reality.
Idyllic isn’t it? Also not the truth.

Governments rip up renewable contracts

Brady Yauch, Special to Financial Post | March 18, 2014 | Last Updated: Mar 19 7:13 AM ET
More from Special to Financial Post

Companies ‘do not have a right [to expect the compensation] not to be changed’
Governments across Europe, regretting the over-generous deals doled out to the renewable energy sector, have begun reneging on them. To slow ruinous power bills hikes, governments are unilaterally rewriting contracts and clawing back unseemly profits.
In Italy, one of Europe’s largest economies and one that lavished billions in subsidies on the renewable sector, the government in 2013 applied its so-called “Robin Hood tax” to renewable energy producers. Under the new rule, renewable energy producers with more than €3 million in revenue and income greater than €300,000 must now pay a tax of 10.5%.
That follows a 2012 move to charge all solar producers a five cent tax per kilowatt hour on all self-consumed energy. The government also told solar producers that it would stop taking their power – and would offer no compensation – when their output overwhelms the system.
The result of these and other changes, says the solar industry, has been a surge in bankruptcies and a massive decrease in solar investment.
In Belgium – where both regional and federal bodies hand out renewable subsidies – a number of retroactive changes have capped the largesse renewable producers once received. In one region the price for “green certificates” – which producers received for renewable energy – was slashed by 79%. The government original committed to buy green certificates at a benchmarked price for 20 years, then cut it to 10 years.
Belgium’s regulators tried to impose a fee on all energy added to the grid from small- to medium-sized solar producers. While the country’s court of appeals struck down that fee, a defiant regional government plans to reintroduce it next year, forcing all solar producers to pay an annual fee that varies with the power they pump into the grid. Various municipalities, meanwhile, are introducing taxes on new and existing wind turbines.
As in Italy, Belgium’s renewable sector in the county has gone dark –“imploded” in the view of a solar industry publication. Many companies shrank or went bankrupt.
In France the government last year cut by 20% the “guaranteed” rate offered to all solar producers, and retroactively applied it to projects connected to the grid in the previous three months. The government is also considering ending an 11% tax break on solar energy producers.
Perhaps the most dramatic moves occurred in Spain, for years the poster child for those touting a transition to green energy. Since 2000, Spain has given renewable producers $41-billion more for their power than it has fetched on the open market. To recover those subsidies, the Spanish government recently killed its Feed In Tariff (FIT) program for renewables,….

Read the full story here.

Algoma residents consider action on wind power plant approval

13 Sunday Oct 2013

Posted by Ottawa Wind Concerns in Health, Renewable energy, Wind power

≈ 1 Comment

Tags

cost-benefit analysis wind power, environmental damage wind power, Goulais Bay, Group of Seven Algoma, wind farm Algoma, wind power

The Goulais Bay wind power generation plant was approved October 4th, despite objections from all over Canada about placing an industrial power generation project in the landscape celebrated by Canada’s Group of Seven painters.

From SooToday:

Goulais wind farm approved, opponents consider next steps

Saturday, October 12, 2013   by: Darren Taylor

 

The Save Ontario’s Algoma Region (SOAR) group is clearly disappointed with the Ontario Ministry of the Environment (MOE) October 4, 2013 decision to approve construction of the Goulais Wind Farm project.

A Renewable Energy Approval (REA) has been given to SP Development Limited Partnership to build, install, operate and eventually retire a renewable energy facility, consisting of 11 wind turbines , with a total capacity of 25 MW, in the unorganized Townships of Pennefather and Aweres.

The wind facility will be connected to Great Lakes Power’s distribution system.

The REA comes with a long list of conditions, which include requiring SP Development Limited to construct and install the facility within three years of the date of approval, compliance with the MOE’s noise emission limits,  keep an eye on storm water management, sediment and erosion during and after construction, the effect of the project on wildlife (such as birds and bats), establish a community liaison committee with members of the public, and properly decommissioning of the facility upon its retirement.

SOAR’s Executive Member and spokesperson Gillan Richards, in an e-mail to SooToday.com, stated: “SOAR and Wind Concerns Ontario (WCO) will now consider what action to take in response to the Goulais Project Approval.”

The group, if it decides to file an application to appeal the MOE’s Goulais Wind Farm project approval, must do so within 15 days.

SOAR has long been opposed to the project, and has maintained that the whirring of wind turbines, for example, is detrimental to human health, and that the presence of more wind farms in Algoma would be an all-round disruption to the environment and wildlife in the area.

Also ranking high among the group’s concerns is that, in its view, the project will create an eyesore on the area’s famous Group of Seven landscape, disturbing “the natural beauty of Algoma from industrial intrusion.”

SOAR states the public in general has never been keen on wind turbine developments, claiming  “Algoma residents and visitors are already annoyed and dismayed by the intrusion of the Prince Wind Farm turbines.”

SOAR has also long insisted not enough public input has been gathered from the province and the developer regarding the Goulais Wind Farm project (along with other wind projects, proposed by other developers, for the Algoma region).

The group agrees with criticism from The Fraser Institute (a Canadian think tank based in Vancouver) that forecasts Ontario’s energy prices will increase dramatically (40 to 50 percent) in coming years, putting the blame for that on the use of wind and solar farms, and insisting that wind turbines are simply inefficient in producing electricity.

SOAR agrees with critics who state Ontario could have gone with cheaper alternatives, such as natural gas or nuclear power, when it sought to move away from coal-fired plants and brought in the Green Energy Act in 2009.

The Ontario government has said the Green Energy Act, despite higher costs for electricity, will ensure “cleaner” electricity for future generations.

Time for the Chief Medical Officer of Health to step up

18 Tuesday Jun 2013

Posted by Ottawa Wind Concerns in Health, Ottawa, Renewable energy, Wind power

≈ 3 Comments

Tags

Dr Arlene King, health effects wind power, health effects wind turbine noise, health research wind power, health research wind turbine noise, noise wind farms, North Gower wind farm, North Gower wind power, Ontario government, Richmond wind farm, sound pressure wind turbines, Wind Concerns Ontario, wind power

Wind Concerns Ontario announced today that it has formally requested the Chief Medical Officer of Health, Dr Arlene King, to follow up on the numerous complaints of excessive noise and ill health, coming from people who are living near or among large-scale wind turbines in Ontario.

Dr King produced a report, which was a simple literature review, in 2010 which found no “direct” link between turbine noise and health problems. That report was widely criticized as being inadequate and based on industry-selected literature, but it has served the wind power development lobby very well, serving as a rubber stamp on health from the Ontario government.

A lot of water has passed under a lot of bridges since: the 2011 Environmental Review Tribunal decision noted that the government ought to keep pace with research on the health impacts, and review and revise regulations as needed—it hasn’t done that.

Dr King herself recommended more research, specifically on the noise. It hasn’t done that either and in fact while acknowledging that infrasound (vibration, sound pressure) could be a problem, it won’t even have guidelines for infrasound until 2015.

By that time, with the government continuing to approve two or three wind power projects a month, everything that is planned or proposed will be built.

Wind Concerns says the government has a duty to investigate the complaints coming from residents under the Health Protection and Promotion Act. With the current Environmental Tribunal concluding this week, after hearing from expert witnesses and actual wind turbine noise victims, it would be appropriate for the government to act.

It is especially important for the people of North Gower and Richmond, where a wind power project would expose hundreds of people–including the property owners leasing land for turbines themselves– to environmental noise and vibration, for the regulations to be revised based on the on-the-ground experiences.

See the news story and actual letter here: http://www.freewco.blogspot.ca/2013/06/wco-demands-investigation-of-noise.html

Prowind sells South Branch/E Ontario project to US wind giant EDP

25 Thursday Oct 2012

Posted by Ottawa Wind Concerns in Health, Wind power

≈ 1 Comment

Tags

Brinston, Chris Bentley, cost of electricity Ontario, Dwight Duncan, EDP, Prowind, Shanly, South Branch, South Branch Wind Opposition group, South Dundas, Tim Hudak, wind power

From this week’s Chesterville Record, news that Prowind sold its 14-turbine project to Houston-based EDP.

See the story here:

http://chestervillerecord.com/2012/10/wind-farm-pursued-in-n-stormont/

This is bad news for the community there–Prowind already has a Feed In Tariff or FIT contract for the project. Now, as owner, EDP will simply be able to add to it without additional environmental assessments or any other sort of oversight.

Not that there is any, anyway.

The subsidies given to wind power developers under FIT amount to about $500,000 per turbine, per year. Just a few kilometers away from Cornwall, which purchases cheap hydro power from Quebec for about 6 cents a kWh, the South Branch project will have a nameplate capacity of 30 megawatts. This is power that Ontario does NOT need.

In other news, in Ottawa at a Town Hall last evening, PC Leader Tim Hudak repeated his pledge to cancel the Feed In Tariff program if his party wins the next election.

Energy Minister Chris Bentley announced today that he is not seeking the Party leadership and is indeed leaving politics. Asked in Ottawa if he was surprised that Finance Minister Dwight Duncan was leaving politics, Mr Hudak said, “Who can blame him? Six budgets and he never once balanced the budget and now he’s leaving behind the worst financial mess.”

Email us at ottawawindconcerns@yahoo.ca and join our community of families concerned about the impacts of large-scale wind power generation projects on our communities, our health, the environment, and our economy.

For more news of our colleague group in South Dundas, go to http://www.stopbigwind.ca

Member: Wind Concerns Ontario http://www.windconcernsontario.ca

Newer posts →

Recent Posts

  • High-Speed Rail opposition in Rural Eastern Ontario: a lesson for wind power developers
  • Land use conflict prompts citizen legal action over West Carleton battery storage site
  • Energy Minister Stephen Lecce speaks out on renewable power sources wind and solar; emphasizes cost, reliability
  • Open letter to CAFES Ottawa
  • Ottawa Wind Concerns supports West Carleton residents

Follow me on Twitter

My Tweets

Enter your email address to follow this blog and receive notifications of new posts by email.

Tags

Bob Chiarelli Green Energy Act IESO Ontario Ottawa Ottawa wind concerns wind energy wind farm wind power wind turbines

Contact us

PO Box 3 North Gower ON K0A 2T0

Blog at WordPress.com.

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Subscribe Subscribed
    • Ottawa Wind Concerns
    • Join 380 other subscribers
    • Already have a WordPress.com account? Log in now.
    • Ottawa Wind Concerns
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar