Ottawa concerned about closeness of proposed wind project in North Gower

30 Wednesday Oct 2013

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Green Energy Act, health effects wind farms, Jim Watson, Kathleen Wynne, noise wind farms, noise wind turbines, Ottawa wind concerns, Prowind, Scott Moffat, shadow flicker wind turbines, wind farm North Gower, wind farm Richmond Ontario

Here from the Ottawa Sun, a story by Susan Sherring, on the opposition to the proposed North Gower-Richmond wind power generation project.

No to wind turbines in North Gower

2

Susan Sherring

By Susan Sherring ,Ottawa Sun

First posted: Wednesday, October 30, 2013 06:03 PM EDT | Updated: Wednesday, October 30, 2013 06:19 PM EDT

Wind turbines
Wind turbines at the Erie Shores Wind Farm near Port Burwell generate power. Similar turbines may be popping up near Ottawa. (CRAIG GLOVER/QMI AGENCY)
Article

  • Change text size for the story
  • Print this story

Report an error

Related Stories

  • Boy dies in freak accident with wind turbine
  • Wind turbine opponents lose fight
  • Wind turbines generate controversy
  • Group disputes wind turbine study
  • Turbine tussle whips up
  • Time for turbine investigation

Related Videos

  • Turbine tussle whips up

Topics

  • Ottawa City Hall

Related attachment(s)

  • Propose North Gower wind farm (pdf)
  • WInd Farm info (pdf)

For years, Gary Thomas has run a successful 50-acre Christmas tree farm in North Gower.

And he does it right, a family event with horse-drawn sleighs, tractor-drawn wagons and a warm fire with hot chocolate and cookies waiting for you upon your return from the bush.

Don’t forget the sweet smells of fresh Scotch Pine and Balsam fir.

Idyllic? Absolutely.

Now picture the same Norman Rockwell scene with a 600-foot high wind turbine less than 1 km away.

Sort of jars the senses, doesn’t it?

And then picture the massive turbine casting a shadow over the scene every few seconds.

Thomas says he can barely believe the possibility.

But indeed, there continues to be a looming threat of a wind turbine project as his next-door-neighbour.

A company called Prowind has applied more than once to the province for permission to build the wind turbine project in North Gower.

And when the province opens up for bids again, there’s every expectation Prowind will submit a proposal again.

“We’re not very pleased with it for a number of reasons. Health, there’s the psychological aspect, and the flicker effect, with every few second have a shadow come in front of our house, this is crazy,

“I’m not sure customers having the old fashioned experience will like the shadow,” he said.

Agreed.

Thomas doesn’t just worry about the immediate effects of the turbines, but he and his wife have counted on the farm for their retirement — and if the giant wind turbines are erected, doesn’t know how that will effect the resale value of their home.

“We’re hopeful Watson and council won’t put them in the municipality,” he says, in an interview with the Sun on Wednesday.

The threat of a giant wind turbine farm in their community has galvanized residents of North Gower in opposition of the project.

“We really don’t need these wind power projects,” said Jane Wilson, the chair of Ottawa Wind Concerns.

The group is circulating a petition — which now has about 400 names on it — advising the province North Gower doesn’t want to be home to a wind turbine project.

“It’s a pretty big power plant, I’m not sure people understand that. It’s huge, these are really large machines, they make noise and the vibrations can be upsetting,” she said.

The group has the support of their ward councillor Scott Moffatt, who’s working with them and city staff to craft a motion asking the province to give municipalities a say in where the wind power projects can and can’t be located.

“The majority are against it,” he added.

……………..

Read more at the Ottawa Sun website and take the poll!

North Gower rally vs proposed wind power project

27 Sunday Oct 2013

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ 4 Comments

Tags

Lisa MacLeod, noise wind farms, noise wind turbines, Ottawa wind concerns, Pierre Poilievre, property value loss North Gower, Prowind, wind farm North Gower, wind farm Richmond Ontario, wind power North Gower

(Dear Tom Spears: they are NOT ‘farms’)

From the Ottawa Citizen

North Gower rally opposes possible wind farm

  By Tom Spears, OTTAWA CITIZEN October 26, 2013
  • Photos ( 2 )
North Gower rally opposes possible wind farm

Nearly 300 people came to the recreation centre in North Gower Saturday morning to oppose construction of eight to 10 wind turbines north and west of the village.

NORTH GOWER — Nearly 300 people came to the recreation centre in North Gower Saturday morning to oppose construction of eight to 10 wind turbines north and west of the village.

“They’re too noisy. They are really way to close to people for an industrial power plant,” said organizer Jane Wilson, of Ottawa Wind Concerns. “Far too close to too many people.”

She estimates that 1,100 homes would be within 3.5 kilometres of the turbines.

“A number of the homes are within two kilometres, which is … where you see most of the health effects,” she said.

Her group circulated a map of where it says the turbines would be sited, “and when people start looking at the map and see how close it is, it really makes a difference to them.”

Opponents of wind farms say sound waves that are at too low a frequency for the human ear to hear can cause insomnia, dizziness, headaches and other health problems. The industry says there is no health impact.

Construction could begin in the fall of 2014, she believes.

The proposal by Prowind Canada is on hold for now, but residents expect the company to go ahead eventually. The Prowind website estimates the size of what it calls the Marlborough wind farm at eight turbines, producing up to 20 megawatts.

Nepean-Carleton MPP Lisa MacLeod, who is also the Conservative energy critic, attended the event to support the protest.

“Rural communities are going to be assaulted by these wind turbine developments,” she said.

She said the Conservatives want a moratorium on new wind developments, and an end to subsidies “so that we can put them put of business.”

She also accused the turbines of being costly and inefficient.

Wind farms are common in many parts of Ontario, especially along the Great Lakes, but are not yet common in Eastern Ontario. In some rural communities they have pitted neighbours against each other, with some welcoming the revenue and some saying their health and property values are at stake.

“There are obviously some health issues that need to be explored and Health Canada is doing that right now,” MacLeod said.

Wilson said the Saturday rally collected 282 signatures declaring that North Gower is “not a willing host” to a wind farm.

Nepean-Carleton MP Pierre Poilievre announced on Twitter that the social costs of wind farms are too high and added, “I will continue to stand with you.”

Click here for the map by Ottawa Wind Concerns.

tspears@ottawacitizen.com

New map shows potential impact of North Gower wind power project

13 Sunday Oct 2013

Posted by ottawawindconcerns in Health, Renewable energy, Wind power

≈ 19 Comments

Tags

North Gower wind farm, North Gower wind power project, Not a Willing host, Ottawa wind concerns, property value loss Richmond

turbine and houseCloseWith new research on both health impacts and property value loss surfacing, we decided to update our maps on the sphere of influence of the proposed wind power generation project in North Gower and Richmond.

It is staggering. With health problems due to the environmental noise being reported as far away as 5 km in other jurisdictions (10 km reported in Australia) and property value loss substantial within 2 miles (US study from Clarkson University), our map depicts the influence on residents living within 3.5 km.

See the map HERE NG wind turbines – 3500m- 20131012

Where is YOUR home?

And what can you do? Tell the City of Ottawa that the residents of the North Gower area are NOT a “willing host” to this wind power project.

Come sign the legal petition Saturday October 26th at 10 AM at the Alfred Taylor Centre, and help get the word out to your North Gower friends and neighbours.

Alternate signing day will be Saturday November 9th from 11 AM to 1 PM. Volunteers will also be going door-to-door in the weeks after the petition launch; you may also email us at ottawawindconcerns@gmail.com to have a copy brought to you.

Each signature will be witnessed: this is a LEGAL DOCUMENT that will go to Ottawa City Council.

Donations welcome: PO Box 3, North Gower ON  K0A 2T0

Ottawa Wind Concerns

ottawawindconcerns@gmail.com

Ottawa economist on 10 years of power mismanagement in Ontario

23 Tuesday Jul 2013

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ Leave a comment

Tags

Bob Chiarelli, Bob Lyman, cost benefit wind power, cost-benefit renewable power, Dalton McGuinty, electricity rates Ontario, Feed In Tariff Ontario, Green Energy Act, Kathleen Wynne, Ontario by-elections, Ontario Ministry of Energy, Ontario Power Authority, Ontario's electricity system, Ottawa wind concerns, Parker Gallant, power bills Ontario, Robert Lyman, Wind Concerns Ontario

You’ve read Bob Lyman, an economist specializing in energy issues, on these pages before.

In his latest work, he has written an overview of the last 10 years of energy policy as it relates to electricity in Ontario, and come up with the very worrying conclusion: the whole thing has been grossly mismanaged.

The question now is, can Ontario ever get out of this hole? That’s tough when Ontario keeps approving big, expensive wind power projects on the order of one a week this summer, despite not having a current long-term energy plan.

Here is Bob Lyman’s latest:

Ten Years of Liberal Mismanagement of Ontario’s Electricity System

A Layperson’s Summary

On July 16, 2013, Parker Gallant, a retired banker who for about six years has written about Ontario electricity policies, wrote an article to mark the forthcoming tenth anniversary of the Liberal Party’s tenure as government of Ontario. Mr. Gallant’s article can be found at the following link:

http://www.freewco.blogspot.ca/2013/07/ontario-liberals-10-years-of.html

This article is of great importance for Ontario residents who want to understand what has been happening to electricity supply, demand and prices over the past decade and, perhaps more importantly, how they should weigh these developments as they contemplate forthcoming elections in the province. Shortly, there will be five by-elections in different parts of Ontario that may swing the balance of power in the legislature. It is also likely that there will be a general election in Ontario within the next two years.

Voters need to understand what the fuss is all about and how it affects them. Unfortunately, Mr. Gallant’s article, as wonderfully insightful as it is, might be difficult to understand for the average citizen who does not follow electricity matters on a regular basis. The objective of this note is to offer a somewhat simplified version of the story people should know. …

Read the whole document here: Ten Years of Liberal Mismanagement of Ontario’s Electricity System

Upcoming topics: what does the situation at Chatham-Kent airport (where 8 turbines have been order removed) really mean?

Please contact us at ottawawindconcerns@gmail.com

Donations welcome at PO Box 3, North Gower ON   K0A 2T0

Prowind: we want you to be “comfortable”

19 Friday Jul 2013

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

cost benefit wind power, cost-benefit renewable power, Elizabeth Payne, Green Energy Act, health effects wind farms, health effects wind power, health effects wind turbine noise, indirect health effects wind turbines, infrasound wind turbines, North Gower wind farm, North Gower wind power project, Ottawa Citizen, Ottawa wind concerns, Prowind, Richmond wind farm, Rochelle Rumney, South Branch wind farm, wind power project Ottawa

In the article on the proposed wind power project for North Gower-Richmond appearing in today’s Ottawa Citizen (http://www.ottawacitizen.com/business/Wind+power+projects+harmful+cancelled+plants+critic+contends/8678755/story.html), wind power developer Prowind (based in Germany) representative Rochelle Rumney says the project is “on hold” until the new application process is announced by the Government of Ontario.

Taking a cue from the province, which is making lots of noise about “community engagement” while still NOT returning local land-use planning powers removed by the Green Energy Act, Rumney told the Citizen writer that Prowind wants to work with the community to “try to have everybody be comfortable with the project.”

Comfortable.

Really.

How do we get “comfortable” with the fact that Prowind has concealed the true locations of the turbines and to this date, does not depict the turbines just north-west of a housing subdivision on its website?

How do we get “comfortable” with the fact that by conservative estimates (and this has been accepted by the Ontario Superior Court of Justice) property values could decline by 22-50% ?

How do we get “comfortable” with the fact that, again by conservative estimates, if only 10% of the residents within 3 km of the turbines were to experience sleep disturbance and other health problems, that would mean over 100 people could be affected?

How do we get “comfortable” with the fact that a few people who live here can do this to the rest of their community?

This community has options, none of them comfortable, but they will be pursued.

Just a reminder of who we’re dealing with, here again is the photo of Prowind’s stunning Head Office in Hamilton, Ontario.

Prowind HQ-Hamilton

Donations welcome to cover costs including legal fees: PO Box 3, North Gower ON   K0A 2T0

Ottawa Wind Concerns Inc. is a corporate member of Wind Concerns Ontario.

Wind power project siting process needs to be replaced, says Ottawa Wind Concerns

18 Thursday Jul 2013

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

cost benefit wind power, Feed In Tariff Ontario, gas plant cancellations Ontario, gas plants Ontario, Green Energy Act, health effects wind farms, health effects wind turbine noise, health problems wind farms, indirect health effects wind turbines, infrasound wind turbines, Lisa MacLeod, moratorium wind power projects, North Gower wind farm, North Gower wind power project, Ottawa wind concerns, Pierre Poilievre, Prowind, Rochelle Rumney, Wind Concerns Ontario, wind power performance Ontario, wind turbines and property values

Posted by the Ottawa Citizen:

Wind-power projects as harmful as cancelled gas plants, critic contends

By Elizabeth Payne, OTTAWA CITIZEN July 18, 2013 6:04 PM
 OTTAWA —The same process that led to Ontario’s “gas plant fiasco” is being used for wind-generation projects with disastrous results, says the head of a group concerned about a proposed wind farm in rural southern Ottawa.

“The gas plants got all the attention, but the wind-power projects are more widespread — and causing real problems for communities in terms of health problems, social disruption, lost property value and harm to the natural environment,” wrote Jane Wilson in a submission to the Ontario Power Generation and the Independent Energy System Operator as part of a “dialogue” about the way the province locates large power projects.

The consultation process stemmed from the political controversy around the location, and cancellation, of planned gas plants in southern Ontario. The Liberal government’s handling of the costly gas plant issue is the subject of an inquiry and a criminal investigation.

Ottawa Wind Concerns, which Wilson heads (in addition to Wind Concerns Ontario) wants a new system for planning and siting all large energy projects, including wind, that gives local communities more control. The Liberal government’s Green Energy Act gave the province control over location of wind energy projects. In May, the provincial government announced changes that will make developers work more closely with municipalities.

Ottawa Wind Concerns says, however, that the province needs to go further and give municipalities full control over projects as well as treating them the same way an industrial project would be treated. So far 60 municipalities across the province have declared themselves not willing hosts to wind power projects.

“Local land use planning needs to be returned to communities as a start and power projects should be treated as any other sort of infrastructure, with residents having full input to decisions that will affect their community, their financial futures and their health.”

Although many people living near wind turbines complain about health effects, research into the issue is limited. Ontario’s Chief Medical Officer of Health, in a 2010 report, concluded that “the scientific evidence available to date does not demonstrate a direct causal link between wind turbine noise and adverse health effects.” It also concluded that sound from wind turbines with common setbacks is not sufficient to cause hearing problems, although people might find it annoying. It also said there is no scientific evidence that vibrations from low-frequency wind turbine noise causes health issues. The report also said that “community engagement at the outset of planning for wind turbines is important and may alleviate health concerns.”

Health Canada has launched a major study into the effect of wind turbines on health. Meanwhile, federal cabinet minister Pierre Poilievre and Conservative MPP Lisa MacLeod, both of whom represent the riding where the project is planned, are calling for a moratorium on the North Gower project until the Health Canada study is completed.

A spokesman for the company that is proposing to build the project, Prowind Canada Inc., said it is temporarily on hold until the province determines what the new process for awarding wind power contracts will look like.

Rochelle Rumney, environmental co-ordinator with the company, said — environmental coordinator said Prowind would “like to work with the community and try to have everybody be comfortable with the project.”

Meanwhile, during an ongoing July heat wave that has strained the power grid, wind power contributed less than one per cent to Ontario’s power needs this week, something that Wilson says underlines the need for a cost-benefit analysis of wind-power projects.

© Copyright (c) The Ottawa Citizen
OWC notes: despite community opposition, and opposition from elected representatives, despite clear evidence this project will cost taxpayers/ratepayers $4.8 million a year for power we don’t need, it looks like Prowind is still prepared to proceed with the North Gower-Richmond project…or sell it to someone who is. That means, we need even more help and especially funds for legal counsel. Donations welcome at PO Box 3, North Gower ON   K0A 2T0 Email us at ottawawindconcerns@gmail.com

Impact of Ottawa wind power project would be ‘staggering’

16 Tuesday Jul 2013

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy

≈ 3 Comments

Tags

cost benefit wind power, cost-benefit renewable power, Green Energy Act, health effects wind farms, health effects wind power, IESO, infrasound wind turbines, Lisa MacLeod, North Gower wind farm, Ontario government power projects, OPA, Ottawa wind concerns, Pierre Poilievre, Richmond wind farm, siting power projects, wind power project Ottawa

Community group Ottawa Wind Concerns has filed a formal comment with the Ontario Power Authority and the Independent Electricity System Operator as part of the “dialogue” process on siting large power projects in Ontario.

Placing a huge wind power project as proposed in the North Gower and Richmond communities, part of the City of Ottawa, would have “staggering” effects, the group says, in terms of negative health impacts and on property values.

On a day when wind power is contributing considerably less than one percent to Ontario’s power needs during the current heat wave, OWC’s chair Jane Wilson said that a thorough cost-benefit analysis, including comparison to other forms of power generation and the impact on communities, should be done for this and every wind power project.

“Ontario needs a new process,” she says. “That starts with a return of local land use planning and the recognition that wind power projects should be treated as any other type of infrastructure.”

MP Pierre Poilievre, MPP Lisa MacLeod and Ottawa City Councillor have all expressed opposition to the wind power project.

ottawawindconcerns@gmail.com

Read the full comment document here: OPA-commentJuly11

Donations welcome, please mail to PO Box 3, North Gower ON  K0A 2T0

Green Energy Act “bigger debacle” than gas plant scandal

27 Thursday Jun 2013

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ Leave a comment

Tags

cost benefit wind power, cost wind power, cost-benefit renewable power, Dalton McGuinty, Feed In Tariff Ontario, Green Energy Act, Kathleen Wynne, Ottawa wind concerns, Parker Gallant, rising electricity costs Ontario, wind power Ontario

Here from today’s Financial Post, a comment from Parker Gallant, on the cost of the Green Energy and Green Economy Act. He estimates $1,100 per household per year, but that’s not including property value loss for areas living near wind power projects…Ontario is in deep, deep trouble, and it’s not over yet.

The Ontario Power Authority is currently tripping through Ontario asking communities what will make them happier about the planning process for large-scale power projects.

Here is Parker Gallant: http://www.freewco.blogspot.ca/2013/06/parker-gallant-ontario-green-energy-act.html

Email us at ottawawindconcerns@gmail.com (join our confidential email list for updates) and please donate toward our legal and other costs PO Box 3 North Gower ON  K0A 2T0

Ontario Government’s green power policy: an “abject failure”

25 Tuesday Jun 2013

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ Leave a comment

Tags

Auditor General Ontario, cost benefit wind power, cost-benefit renewable power, Dalton McGuinty, Feed In Tariff Ontario, Green Energy Act, Kathleen Wynne, Ottawa wind concerns, Waterloo Region Record, wind farms Ontario, wind power Ontario

Here today from the Waterloo Region Record, a comment on the McGuinty government’s “green energy” program which was meant to bring jobs and prosperity to Ontario, while cleaning up our air (never mind that the air pollution in Southern Ontario is from cars and trucks).

The author rightly points out that the government continues to put a brave face on its policy, even as it disintegrates daily. What the author of this comment doesn’t know, is that the Ontario government continues to approve giant wind power projects weekly. In fact, this month has seen a record number of project approvals, including one at West Lincoln, which had passed a resolution at Council declaring itself not to be a “willing host” to wind power on this scale.

Here is the comment. Email us at ottawawindconcerns@gmail.com and donations are most welcome for legal and other costs at PO Box 3, North Gower ON  K0A 2T0

http://www.therecord.com/opinion-story/3854511-a-white-flag-for-green-energy/
TheRecord

A white flag for green energy

Waterloo Region Record

The Ontario Liberals are striving mightily to portray their disastrous green energy program as a rousing success. Do not believe them. It is an abject failure that inflated electricity costs, alienated rural communities and never lived up to its billing as the engine not just of more jobs but an entirely new manufacturing sector.

This is the context in which to understand last week’s announcement that the province had downsized a multi-billion dollar deal it signed with Samsung Group in 2010 to produce electricity from wind and solar projects.

Instead of giving the South Korean corporate giant $9.7 billion for 2,500 megawatts of electricity, Ontario will spend $6 billion for 1,369 megawatts. We pay less. We also get less. Samsung is cutting its investment in new green energy plants and components in Ontario from the $7 billion it originally pledged to $5 billion.

Although the government once boasted that Samsung would create 16,000 new manufacturing jobs, the number of new workers being talked about last week was just 900. That’s a flimsy foundation for an economic renaissance.

Energy Minister Bob Chiarelli defended the latest Samsung agreement as a way “to bend the cost curve (down) for ratepayers.” But even he can’t make a silk purse out of a sow’s ear. The best that can be said of his accomplishment is that the government’s ill-conceived and poorly delivered green energy crusade will leave ratepayers battered but not comatose.

Go back a few years and remember then-premier Dalton McGuinty’s grand and hubristic vision of turning this province into a green utopia. Making everyone pay far more for wind and solar energy than other sources of electricity was the key to his plan. Sure it would hurt consumers — but it would be worth it.

Not only would the McGuinty brain trust produce more energy for Ontario, it would do so in an environmentally friendly way. To top it all off, in the wake of the devastating recession of 2008-09 in which thousands of the province’s factory jobs were lost, the Liberals were going to create a thriving green energy industry that would sell to a global market.

It turns out McGuinty was a modern-day Don Quixote tilting at wind turbines. He was off on just about every premise. The World Trade Organization recently struck down the made-in-Ontario provision in McGuinty’s program.

The Liberals overestimated Ontario’s energy needs. The recession drove down demand for electricity and the province wound up with a surplus of it. We don’t need all the electricity Samsung was originally contracted to deliver.

The job boom never materialized either. As it happens, China can make solar panels far cheaper than Ontario. No wonder one of Canada’s most touted solar power firms, Arise Technology Corporation of Cambridge, went bankrupt last year while solar energy equipment maker Silken SA closed its Windsor operation.

And the bloated cost of this energy scheme will hurt for years to come. In 2011, Auditor General Jim McCarter estimated Ontario’s green energy policies were adding $220 million a year to the province’s already soaring hydro bills which were now among the most expensive in North America. No wonder the government scaled back its rates for green energy.

With McGuinty now gone and Kathleen Wynne in the premier’s office, the government is running away from the green energy program as fast as it can. The Samsung agreement has been overhauled. In future, priority will be given to wind turbine projects where there is community support.

For months, Ontarians have been justifiably outraged by the same government’s cavalier cancellation of two gas-fired electricity plants, arguably for political reasons and at a cost to the public of at least $585 million. The green energy program is as big a fiasco — and will cost more in the long-run.

 

The Chiarelli-Wynne non-announcement for Ontario municipalities: nothing has changed

03 Monday Jun 2013

Posted by ottawawindconcerns in Health, Ottawa, Renewable energy, Wind power

≈ 2 Comments

Tags

April Jeffs, Bob Chiarelli, cancel wind power projects, FIT contracts, health problems wind power projects, Kathleen Wynne, map Ontario wind turbines, municipal control wind power projects, national Post, North Gower wind farm, North Gower wind project, Ottawa wind concerns, Parker Gallant, Scott Stinson, Trillium Power, Wainfleet, Wind Concerns Ontario

Last week, Energy Minister and former Ottawa Mayor Bob Chiarelli announced that Ontario would in future increase “local control” in renewable energy development. This was in reaction to the fact that in recent weeks, almost 40 municipalities took the step of formally passing a resolution to say they are NOT a “willing host” to wind power projects, picking up on remarks made months earlier by Premier Kathleen Wynne.

Mr Chiarelli announced that a new process will “replace the existing large project stream of Feed-In Tariff (FIT) program and better meet the needs of communities.”

A new “competitive procurement process for projects over 500 kW” will be announced in the fall.

What does it all mean?

Absolutely nothing.

In fact, things may even be worse for communities who don’t wish to expose their residents to the health impacts, property value loss, and social divisions that come along with large-scale wind power generation projects.

Note the wording: “meet the needs of communities.” What the province is saying it will now do is develop Regional Energy Plans and the new process will “require energy planners and developers to work directly with municipalities to identify appropriate locations and site requirements.”

We’re not sure who the “energy planners” are but take this scenario: a regional energy plan for Ottawa and area is developed and the province says there must be a mix of power sources. Therefore, a wind power project, and guess what? There’s already one in process in North Gower-Richmond*, or countless other communities across Ontario near large urban centres, so, carry on! And we know that siting wind power projects has NOTHING to do with health or the environment and everything to do with a few willing landowners.

And the Liberal government’s continuing policy of forcing wind power projects on rural and small urban communities.

Premier Wynne confirmed this in an interview last Friday when she said Ontario is continuing its goal of securing the province’s clean energy future, and that siting decisions will be made for the “greater good.”

That means, too bad for you North Gower and Richmond. Hundreds of families, young children, people with existing health problems, young families with everything invested in their homes suddenly forced to live with a power project? Too bad for you: it’s for the “greater good.”

This announcement was the Ontario government at its most cynical.

Scott Stinson wrote in The National Post, referring to the government’s earlier decision to pay power developers even if we don’t need the power: “So now Ontario will pay wind generators for energy that it isn’t even using, produced by turbines in communities that didn’t want them, and were installed under a set of rules that it has since admitted was a mistake.” http://fullcomment.nationalpost.com/2013/06/02/scott-stinson-rural-communities-not-blow-away-by-changes-to-ontarios-green-energy-act/

Wainfleet Mayor April Jeffs today wrote a letter to Premier Wynne on behalf of the 20 some municipalities that met earlier this year and formed a working group. While Mr Chiarelli claims that the province is unable to cancel, or not proceed on, projects with FIT contracts, Mayor Jeffs reminds him that this is not true: “the recent court decision in the lawsuit brought by Trillium Power indicated that this concern does not apply to projects that have not received REA approvals. FIT contract holders have only been granted permission to enter a ‘complex regulatory process’ that might lead to approval to build a wind project. A FIT contract is not a guarantee of a REA approval.”

In other words, with all due respect, Minister, you are lying.

For more on this we invite you to read Parker Gallant’s excellent column at Wind Concerns Ontario, The truth, whole truth, so help me Ontario. http://freewco.blogspot.ca/2013/06/the-truth-whole-truth-so-help-me-ontario.html

Contact us at ottawawindconcerns@gmail.com 

Middlesex-Lambton, Listowel, Prince Edward County, Haldimand, West Lincoln, Bluewater, Kincardine, Collingwood… for a list of wind power projects pending go to ontario-wind-turbines.org

← Older posts
Newer posts →

Recent Posts

  • Ottawa environment committee votes Yes to wind on City-owned lands
  • City environment committee to hear motion tomorrow on wind turbines on public land
  • Put distance between wind turbines and homes, Ottawa Wind Concerns tells City
  • Ontario government lags on wind turbine regulations: Ottawa business newspaper
  • Ottawa renewable energy future “predominately wind and solar” says city staff

Follow me on Twitter

My Tweets

Enter your email address to follow this blog and receive notifications of new posts by email.

Tags

Bob Chiarelli electricity bills Ontario Green Energy Act IESO Ontario Ottawa wind concerns wind farm wind farms wind power wind turbines

Contact us

PO Box 3 North Gower ON K0A 2T0

Create a free website or blog at WordPress.com.

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Follow Following
    • Ottawa Wind Concerns
    • Join 1,083 other followers
    • Already have a WordPress.com account? Log in now.
    • Ottawa Wind Concerns
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...