The Ostrander Point power project appeal: winnable!

28 Sunday Apr 2013

Posted by Ottawa Wind Concerns in Health, Renewable energy, Wind power

≈ Leave a comment

Tags

Algonquin Power, Alliance to protect Prince Edward County, APPEC, Carlyn Moulton, CCSAGE, cost benefit wind power, County Coalition for Safe and Appropriate Green Energy, Environmental Review Tribunal Ontario, Gilead Power, health effects wind farms, health effects wind power, health effects wind turbine noise, infrasound wind turbines, Ontario Ministry of the Environment, Ostrander Point, Paul Catling, PECFN, prince Edward County, Prince Edward County Field Naturalists, Regent Theatre Oicton, touism and wind power projects, tourism UK and wind power, White Pines wind power

As you know, two community groups have appeal the Ministry of the Environment’s approval of a wind power project on the South Shore of Prince Edward County at Ostrander Point. The Prince Edward County Field Naturalists (PECFN) and the Alliance to Protect Prince Edward County (APPEC) have both filed appeals, PECFN’s on the basis that the project will cause serious and irreversible harm to the natural environment, and APPEC on the basis of harm to human health. Wind Concerns Ontario was granted status as a participant and presented evidence on the potential harm to bats, and the resulting economic effects if this expensive and unnecessary power development were to be built. County Coalition for Safe Affordable Green Energy (CCSAGE)  is also assisting with fund-raising and other activities.

The Environmental Review Tribunal (ERT) is continuing in the County and a great deal of evidence on the environment has already been presented.

Last week, the community groups hosted a fund-raiser Town Hall, which featured excellent speakers. Local humourist Steve Campbell was the MC for the event, a packed hall at the venerable Regent Theatre in Picton, said he regularly reads of strife for city dwellers in the form of crime, and gang wars, etc. “Here in the County,” he said, “we only have two enemies: the provincial government, and the federal government.”

For more details on the event, please read the story here (and note the new mascot Angry Bird!):  http://www.freewco.blogspot.ca/2013/04/ccsages-town-hall-event-on-wind-turbine.html

One of the most stunning pieces of information presented that evening was from business owner Carlyn Moulton who noted that the arts and services sectors bring in $400 million in revenue annually to the County while the proposed wind power development will bring–get this–$1-2 million in tax revenue. “Huh?” she said. “How does that make any sense?” Tourism to the County will be drastically affected by the Ostrander Point project, and another proposed wind power project the “White Pines.” A study done recently in the U.K., Moulton said, showed that 75% of the visitors to an area where wind turbines had been installed said they would “never come back.”

Among the handouts that evening (we were there) was a flyer on why the Ostrander Point ERT is “winnable.” The environmental testimony has been damning—botanist Paul Catling said the damage to the rare alvar environment will be irreversible and he scoffed at developer Gilead Power’s claim to be able to re-create the environment elsewhere—but this ERT is the first opportunity for a Tribunal to hear actual testimony from people already living with wind turbines and the environmental noise and infrasound they produce.

“APPEC’s appeal is the first in which Ontario wind victims will present evidence demonstrating that wind turbines cause serious harm.This proof meets the test required in order to WIN  and ERT appeal,” APPEC wrote in the flyer. “By invalidating 550-m setbacks the appeal will set a precedent that applies to every proposed industrial wind project. The Ministry of the Environment would have to determine a new standard to protect the health of Ontarians, and it could not continue to rubber-stamp projects in Ontario.”

Worth supporting, wouldn’t you say?

Go to www.appec.ca to donate or send a cheque to

APPEC Legal Fund

PO Box 173

Milford ON   K0K 2P0

If the government actually approves this wind power project in a “globally significant” important bird area, and where the destruction of a rare environment is assured, there is no hope of using the government’s process for any project.

FIGHT IT.

Ottawa Wind Concerns

p-o-bird-gb-pt-pec(A grey-blue gnat-catcher, photographed by a Prince Edward County resident)

Court decision: you can sue a wind power developer!

23 Tuesday Apr 2013

Posted by Ottawa Wind Concerns in Health, Renewable energy, Wind power

≈ 1 Comment

Tags

CanWEA, Clearview wind farm, cost-benefit renewable power, Dr Robert McMurtry, Eric Gillespie, Feed In Tariff Ontario, health effects wind farms, health effects wind turbine noise, Ottawa wind concerns, wind power Ontario

A decision came down from the Ontario Superior Court of Justice last evening, which at first seems like a defeat for communities and people who suddenly find themselves predated upon by huge, subsidy-seeking wind power developers. The decision read that the plaintiffs in a legal action based on lost property values would not be able to proceed with their action.

Right now.

But if the project is approved by the Ontario government, that would be another story.

Also in the decision were remarks that the Court accepted evidence on property value loss–in the area of 22-50%– and also evidence from Dr Robert McMurtry on the potential for health effects.

This is a very significant event and marks a sea change for people and communities wishing to have some say in what goes on around them. As you know, local land use planning powers were removed for renewable energy projects by the Green Energy Act. What’s worse, as municipalities seek ways to get some form of control back, wind power developers are responding with punitive lawsuits (Thunder Bay, Wainfleet, Bluewater).

The news release on the court decision is here. As soon as we find a link to the full decision, we’ll get that for you too.

http://www.newswire.ca/en/story/1151369/ontario-court-allows-lawsuits-against-wind-company-and-landowners-just-a-matter-of-time

Donations welcome to cover legal fees (yes, we have one on retainer and yes, we’re thinking ahead) and other expenses: PO Box 3, North Gower On  K0A 2T0

 

Support for Bill 39 Affordable Energy Act

18 Thursday Apr 2013

Posted by Ottawa Wind Concerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

CanWEA, cost benefit wind power, cost-benefit renewable power, energy prices Ontario, Feed In Tariff Ontario, FIT program, Green Energy Act, health effects wind farms, Lisa MacLeod, Lisa Thompson, North Gower wind power project, power prices Ontario, Robert Lyman, wind power subsidies Europe

Energy economist Robert Lyman has provided us a copy of his letter to MPP Lisa MacLeod in support of Bill 39 for the Affordable Energy Act, which will be read today. The wind power corporate lobby group has been working hard to oppose this bill, which would see cancellation of the Feed In Tariff subsidy which is bankrupting Ontario and providing huge subsidies to wind power developers, return of local land use planning control for renewable energy projects, and the requirement that wind power projects provide power at competitive prices.

His rationale is worth reading.

Ms Macleod,

I am writing with respect to Huron-Bruce MPP’s proposed Bill 39, the Affordable Energy Act, which I understand will receive second reading in the Ontario legislature today. As you know, the bill would authorize the return to municipalities of local land use planning control for renewable energy projects. It would also require that that proposed wind power projects supply power at a price competitive with other sources of power. I appreciate that is is very difficult to obtain legislative approval for Private Members’ Bills, but I think the committee meeting on this subject is an appropriate time to raise the awareness of the legislature and perhaps the media concerning the major problems associated with the Green Energy Act.
Here are a few points you may wish to bear in mind.
The current FIT subsidy for on-shore wind turbines of 13.5 cents per kWh. One should note the comments and findings in Chapter 3 of the Auditor General of Ontario’s 2011 Annual Report ( My personal comments are in brackets):
– “Many other jurisdictions set lower FIT prices than Ontario and have the mechanisms to limit the total costs arising from FIT programs”.
– “Ontario’s FIT prices were originally designed with the intention of allowing a reasonable rate of return, defined as 11% after-tax return on equity.” (In today’s market, even the riskiest of investments don’t get an 11 % rate of return; the FIT prices, in contrast, are guaranteed for the twenty-year life of the contract. There is no risk at all.)
– “There was minimal documentation to support how FIT prices were calculated to achieve the targeted return on equity, because of the numerous changes in the financial model and assumptions made by the Ontario Power Authority”. (The method of determining the FIT prices was, and remains, obscure.)
– “There has been a lack of independent oversight on the reasonableness of FIT prices. Although the OEB has historically been mandated to oversee and approve electricity prices, it has no role or legislative responsibility to review or approve FIT prices.”
– “”The internal rates of return offered to the developers in Germany and Spain varied depending on market risks and ranged from just 5% to 7% in Germany to between 7% and 10% in Spain. When Ontario’s FIT prices were first developed in spring 2009, they were already higher than those in Germany and Spain, which have both significantly dropped their FOIT prices since then due to lower component costs arising from technological advances”
– (Ontario’s FIT price for onshore wind installations is higher that that in Michigan, Wisconsin, Denmark, Germany, Spain and South Korea. Only in Vermont and Washington are FIT prices higher.)
I would add that, of all the various elements of the Green Energy Act, the withdrawal of authority from municipalities to exercise land use planning control over the construction of renewable energy installations is probably the most egregious. It is an affront to democracy that the governments most closely associated with the affects these installations have lost their ability to protect the public.
Bob Lyman
Nepean
********
Email us at ottawawindconcerns@gmail.com
Donations welcome at PO Box 3 North Gower ON  K0A 2T0

Ottawa NOT a ‘willing host’ event Saturday April 6th

05 Friday Apr 2013

Posted by Ottawa Wind Concerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Bob Lyman, cost benefit wind power, health effects wind farms, health effects wind turbine noise, infrasound wind turbines, Lisa MacLeod, Not a Willing host, Ottawa wind concerns, South Branch Wind Opposition group, Wind Concerns Ontario, wind farm North Gower, wind farm Richmond, wind power project Ottawa

Print

NORTH GOWER-RICHMOND-BRINSTON NOT A “WILLING HOST” to giant wind power generation project.

News conference and peaceable demonstration Saturday April 6th, Ottawa City Hall, 2 PM, corner Elgin and Lisgar Streets, Human Rights monument

Speakers: Lisa MacLeod MPP, energy economist Bob Lyman, Wind Concerns Ontario president Jane Wilson

Organized by: Ottawa Wind Concerns, Wind Concerns Ontario, South Branch Wind Opposition Group

MPP MacLeod to Minister of Energy Chiarelli: we must have a voice

05 Tuesday Mar 2013

Posted by Ottawa Wind Concerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Bill 2 Ontario, Bob Chiarelli, cost benefit wind power, Green Energy Act, health effects wind farms, health effects wind power, Jim Wilson MPP, local land use planning Ontario, moratorium wind power projects, MPP Lisa MacLeod, North Gower wind power project, Ottawa wind concerns, wind power Ontario

Nepean-Carleton MPP Lisa MacLeod wrote a letter to Bob Chiarelli, now Ontario’s Minister of Energy, asking for local land use planning powers to be returned to Ontario communities.

“Minister, local municipalities and residents must have a voice regarding Industrial Wind Turbine projects that are planned for their community,” she wrote.

“I ask you to immediately implement a province-wide moratorium and support Bill 2, which would return planning authority back to municipal government control.”

Yes!

The letter is here: LisaMacLeod2BobChiarelli

Email us at ottawawindconcerns@gmail.com

Donations welcome at PO Box 3 North Gower ON  K0A 2T0

and, get your STOP WIND SCAM sign! Just $5 to stop the scam!

Medical Officer of Health: NO studies showed NO association

22 Friday Feb 2013

Posted by Ottawa Wind Concerns in Health, Renewable energy, Wind power

≈ 1 Comment

Tags

CanWEA, Dr Hazel Lynn, Dr Michael Nissenbaum, ethics of wind power projects, Harvey Wrightman, health effects wind farms, health effects wind turbine noise, health effects wind turbines, indirect health effects wind turbines, infrasound wind turbines, moratorium wind power projects, North Gower wind power project, Ontario government mens rea, Ottawa wind concerns, wind farm Richmond

We are reminded today of the “health” study–really just a review paper–sponsored by the wind power corporate lobby group CanWEA, which concluded that not only was there any proof of any association between industrial wind turbine noise (the word infrasound was not uttered in those days) and health impacts, in fact, the research team said, there is so little evidence of anything that we recommend no more money be spent on research. At all.

Appalling in the world of scientific research, to make a statement like that.

Now today, Grey Bruce Medical Officer of Health Hazel Lynn and colleague Dr Ian Arra, released the results of their own review and said, there are NO studies in the world that prove there is NO association at all between turbine noise and health impacts. In other words, the studies that CanWEA loves to trot out saying they are proof of no problems at all, are not valid.

At present, Dr Lynn and Arra said, the associations are weak, but not absent, and more research is needed they concluded.

Meanwhile, the wind power lobby group and corporations go around telling people that anyone complaining about wind turbine noise and health effects needs some kind of therapy, or an injection in their wallet–if either one of these things happens, their health problems will go away.

In the Ontario Farmer recently, farm owner Harvey Wrightman of Adelaide-Metcalfe, quoted Dr Michael Nissenbaum (whose study of turbine noise at Mars Hill indicated health effects as far away as three MILES): “If someone came into a doctor’s office and said they have chest pain and the physician said, ‘It’s all in your head,’ without investigating, that would be malpractice. It’s the same thing if patients are complaining of sleep disturbances and other ill effects, and off the top of your head you claim they’re making it up and it’s about the way the turbines look, especially when there’s a known, plausible mechanism for why people could be affected. There’s nothing magical about the effect that people are sleeping poorly due to the noise. There’s nothing difficult to understand or fantastical.”

“This whole issue has always been about ethics,” Wrightman continues, “and what the application of the practical limits are of harm, i.e., what you can reasonably accept in the way of harm of the rural population….Why are there increasing reports of vertigo and nausea with the latest projects?

“The first step to getting those answers is a moratorium on construction of projects. That would be a real show of understanding and respect for rural Ontario.”

We would add that there is more than ethics at play here, we would suggest that at this point, if the government has the slightest clue what it is doing could be wrong and could be harming people, there will be legal liability. The wind power companies, too. And the people who have leased their land for the turbines without thought for their neighbours and communities.

 

Contact us at ottawawindconcerns@gmail.com

Throne speech from the Wynne government: “willing hosts”

19 Tuesday Feb 2013

Posted by Ottawa Wind Concerns in Health, Ottawa, Renewable energy, Wind power

≈ 2 Comments

Tags

community input wind power, cost benefit wind power, Dalton McGuinty, FIT Ontario, health effects wind farms, health effects wind power, infrasound wind turbines, Kathleen Wynne, Throne Speech, wind power projects

So, the Throne Speech was delivered today from the “new” government, headed by brand new Premier Kathleen Wynne.

We are not much heartened by its content.

The only part that had anything to do with wind power generation projects, which Wynne has acknowledged is a very sore point with Ontario’s rural and small urban communities, is this:

Your government intends to work with municipalities on other issues, too.
Because communities must be involved and connected to one another.
They must have a voice in their future and a say in their integrated, regional development.
So that local populations are involved from the beginning if there is going to be a gas plant or a casino or a wind plant or a quarry in their hometown.
Because our economy can benefit from these things, but only if we have willing hosts.

We’re not sure what being “involved from the beginning” of a process to establish a wind power plant might look like, but when they put having a “voice” in the context of “integrated, regional development” that might just mean the small communities that are part of larger municipalities–like Ottawa, like West Lincoln–can “voice” their concerns all they want but the people in the larger community, who will never have to live next to a 626-foot, 2.5 Megawatt power generator, will drown those voices out. How will the government determine what is a “willing host”?

And what has happened to the “voice” already? Before the Green Energy Act was passed, dozens of communities complained about the loss of local land use planning powers, and they have continued to do so. Communities like North Perth, Picton and others have actually held their own referenda on wind power projects —didn’t amount to a hill of beans with the McGuinty government. McGuinty’s so-called point system, which was crafted to make it look like there was community involvement, meant that communities could go up on the list of power plants to be approved, but they could never get off.

Small urban and rural communities need to see more than this. Right now, people are being made ill by the environmental noise and vibration, homes are being left vacant, community social fabric being ripped apart…and the promise today is a “voice.”

We want more.

Let’s start with a HALT to all approvals until Ontario has done a proper cost-benefit analysis of wind power projects (that INCLUDES the effects on property values to neighbouring properties within 2-3 km) and the economics of wind power generation; and a HALT to the Feed In tariff subsidy program; and REPEAL of the Green Energy Act. Let’s get serious about measuring the noise from existing wind power projects. Let’s help the people who are sick now, and whose homes are worth nothing. And let’s wait until the health studies are actually done before we keep putting more of these things up.

 

Pro-wind group claims they are on the “right” side of history

15 Friday Feb 2013

Posted by Ottawa Wind Concerns in Health, Renewable energy, Wind power

≈ 2 Comments

Tags

CanWEA, Chris Forrest, cost-benefit renewable power, Friends of Wind, Green Energy Act, health effects wind farms, health effects wind power, health effects wind turbine noise, indirect health effects wind turbines, infrasound wind turbines, noise regulations wind power, Ottawa wind concerns

Friends of Wind, a wind biz lobby group funded organization, has been lauded by CanWEA’s VP of Communications Chris Forrest as being on the “right” side of history, in the fight against the “devastating” effects of the use of fossil fuels for power.

Applauding the volunteer efforts of its members, Forrest claims that while others languish, these solid citizens are spending volunteer hours working hard to get their message out. http://friendsofwind.ca/here-on-the-right-side-of-history/

So are we, Mr Forrest, so are we.

There are legions of people in Ontario–doctors, nurses, engineers, teachers, safety experts, acousticians, and others from all spheres–who are working tirelessly to protect the health and safety of people in this province, to say nothing of Ontario’s natural environment and word-renowned beautiful landscapes.

We believe that sources of power ought to be safe for everyone, not benefit just a few. We believe that the Ontario government’s green energy program ought to have been based on a proper cost-benefit analysis–it wasn’t (the Auditor-General says so). We believe the setbacks based on noise modelling ought to have been based on science–they weren’t. And as a result, hundreds of people across Ontario are now ill from exposure to the environmental noise and vibration produced by these huge power plants.

What does the wind industry say about the people reporting ill health effects? It’s all in their heads, they could benefit from therapy, if they got a bit of money their objections would go away … etc etc. This is just like the tobacco industry which maintained for years that not only were cigarettes not harmful, they were actually good for you.

We know who was on the “right” side of history there.

The “right” side now, is the side that stands up for health, the environment, and change that truly benefits the economy of Ontario … not a rush toward invasive, low-benefit, intermittent and unreliable wind power that benefits a few at the expense of many.

Cancel the Feed In Tariff program, repeal the Green Energy Act, hold the wind power plants compliant to noise regulations, and compensate those who have lost their health and property values…these are the right things to do.

Province knew about health effects in 2008

13 Wednesday Feb 2013

Posted by Ottawa Wind Concerns in Health, Renewable energy, Wind power

≈ 1 Comment

Tags

Amaranth, Dalton McGuinty, Green Energy Act, health effects wind farms, health effects wind turbine noise, health effects wind turbines, indirect health effects wind turbines, infrasound wind turbines, Lisa MacLeod, Melancthon, moratorium wind power projects, Orangeville, Ottawa wind concerns, Tim Hudak, wind farm North Gower, wind farm Richmond, wind farms Osgoode, wind farms Ottawa

At this point, no one is surprised that the Government of Ontario knew there was a potential for health impacts from wind turbine noise … but went ahead with its Green Energy and Green Economy Act anyway, which stripped away municipalities’ rights to plan local land use where “renewable” energy projects are concerned, and ride roughshod over the rights of citizens.

Here is an article from this week’s Niagara This Week which puts it all together.

The link is: http://www.niagarathisweek.com/

Province knew about health effects from turbines

Released documents show ministry aware of concerns as far back as 2006

 

Province knew about health effects from turbines. Documents released through a Freedom of Information request reveal the government was aware of adverse health effects caused by industrial wind turbines as far back as 2006. Toronto Star file photo

Documents released through a Freedom of Information request from an Orangeville resident reveal the government was aware of adverse health effects caused by industrial wind turbines as far back as 2006.

While Ontario Progressive Conservative leader Tim Hudak says he is not shocked to learn the government kept this information from the public in relation to the 200-megaWatt Melancthon EcoPower Centre (located in Amaranth and Melancthon Township, near Shelburne, Ont.), he says he is disappointed.

“I wasn’t surprised. Concerns have been raised across Ontario and in other jurisdictions,” says Hudak, whose own riding of Niagara West-Glanbrook is poised for the installation of several industrial wind turbines.

“What it is, is disappointing. It appears as through they were trying to cover something up.”

In the released document, ministry officials report “complaints of adverse health effects by area residents are for the most part justified.

“MOE Provincial Officers have attended at several of the complainant’s [sic] residences and have confirmed that despite the noise emissions apparently complying with the applicable standard … that the noise emissions are in fact causing material discomfort to the residents in and around their homes,” reads the document, written by provincial officer Gary Tomlinson.

According to the ministry, to develop the guidelines for noise limits, ministry scientists and engineers consulted with local community members and noise experts including representatives from major acoustical consulting firms. At the time of the Melancthon project, there were no minimum setback distances, only a provincial noise guideline of 40 decibels, which was maintained in the Act.

The documents state that “at least two families have moved out of their homes due to noise impacts” and that the MOE was aware of “at least six cases where the wind developer bought out resident’s [sic] homes to address and silence their ongoing concerns.”

Tomlinson writes, “reasonable people do not leave their homes to sleep elsewhere for frivolous reasons.”

Melancthon is Canada’s largest wind energy installation to date. Construction on phase one began in 2005, and phase two was completed in 2007. The project has a capacity close to 200 megawatts — roughly 30 megawatts less than the largest project proposed for West Lincoln by Niagara Region Wind Corp.

The Melancthon EcoPower Centre, made up of 133 turbines, was approved before the province passed its controversial Green Energy Act. The Act established a minimum setback distance of 550 metres between residential dwellings and turbines, which is 100 metres more than the minimum setback distance used in the Melancthon project.

Projects approved prior to the passing of the GEA had to meet provincial noise guidelines but the setback distance was to be negotiated between the developer and municipality.

The Melancthon turbines, however, are much smaller than those proposed for parts of West Lincoln. NRWC is proposing to erect 77, three-megaWatt turbines designed by Japanese manufacturer Enercon, which is building facilities in Niagara to manufacture both the towers and electrical components. Fourty-four of those turbines will be built in West Lincoln, three in Wainfleet and 31 in nearby Haldimand County. The concrete towers of these turbines measure to a maximum of 145 metres to the hub, about the length of 13 school buses stacked bumper to bumper. The blades stretch close to 50 metres, roughly another five school buses across.

The turbines used in the Melancthon project are 1.5 megawatts and are manufactured by GE. They measure 80 metres in height, with blades nearly 40 metres long.

While some local residents claim Enercon suggests a greater setback distance for the model being used by NRWC, a company spokesperson said she was unaware of it.

“Enercon has to sign off on everything we put forward,” said Randi Rahamim. “They have signed off on the full design.”

Hudak’s colleague, Huron-Bruce MPP Lisa Thompson, wants to know why the government moved ahead with the Green Energy Act when it was aware of health concerns.

“I’m absolutely disgusted,” said Thompson, who is the PC energy critic. “It’s sad, because, at the end of the day, it hurts that the Liberal government chose to play word games with people’s health. It comes back to my point of how and why did this Liberal government become so arrogant that they can blatantly play with people’s health just to further their own agenda.”

Thompson was further disappointed with the response from Ontario’s environment minister, St. Catharines MPP Jim Bradley, to a letter she sent to him Jan. 9 in light of the FOI information.

“His response was that there is no direct impact,” said Thompson. “Of course, the odds of a blade falling off and hitting someone are rare. But too many people have come forward with concerns, and their complaints have gone nowhere.

“This further emphasizes the need for a moratorium, which I have tabled twice now,” said the MPP whose own riding not only includes the Bruce Power nuclear energy plant but is poised to see 1,700-1,800 wind turbines primarily along the shoreline of Lake Huron.

Thompson said her office is getting ready to table a motion when the house resumes Feb. 19.

“I will continue to put forward efforts to make this government accountable,” said Thompson. “I am not going to let go of these redacted documents… They point to a larger problem of this Liberal government: it doesn’t matter who is in charge, hiding things and driving its own agenda on the taxpayer’s back. It’s got to stop.”

Despite several attempts to reach Bradley, he did not provide comment on the recently revealed document. His press secretary did provide the following: “The ministry is aware of health concerns and has reviewed literature on the potential impacts of wind turbines, including the 2010 report from Ontario’s Chief Medical Officer of Health which found there is no scientific evidence of a direct causal link between wind turbine noise and adverse health effects.

“The ministry will continue to review emerging scientific and engineering studies to ensure Ontario’s requirements remain in line with the best available science.”

The FOI documents pertain to an abatement plan the ministry put in place in relation to the Melancthon project. The ministry worked with both the municipality and wind developer to address concerns which resulted in several turbines being shut off at night and sound barriers being built around a transformer.

Hudak says it appeared ministry staff were trying to be forthcoming in their reports but that the government withheld that information.

“We need a moratorium on these projects,” said Hudak. “It’s been a position that I took up shortly after I became leader in 2009 for a number of reasons.”

Hudak’s issues with the Green Energy Act range from “expensive studies which fail basic economic sense” to how it strips away the decision-making powers of local governments.

Hudak and his PC government have called for several moratoriums on wind projects. In April 2010, at Queen’s Park, Hudak brought forward a bill to halt industrial wind turbine development. In March 2011, he was joined by West Lincoln Mayor Doug Joyner and Wainfleet Mayor April Jeffs at West Lincoln township hall to renew that call. This past June he was joined by his federal counterpart in the riding, MP Dean Allison, in demanding an immediate moratorium on industrial wind turbine development until a federal health study is complete.

Several other PC MPPs, including Thompson, have tabled similar motions.

The PC party will be introducing another motion when legislature resumes, both Hudak and Thompson confirmed.

“Lisa Thompson, in her capacity, brought forward motions in legislature for a moratorium. We will do that again, now that the house is back in after four months of inaction,” said Hudak, who has met with new Ontario Premier Kathleen Wynne.

“We discussed ideas for job creation and balancing the books. One recommendation I made was a moratorium on these types of projects,” Hudak said. “I’ve brought it to the premier, I hope she takes my advice.

“I’m not going to give up,” said Hudak. “I’m going to keep fighting for what I think is the right thing to do.”

…..

Note that in the North Gower-Richmond area (which is only the beginning if this project were to proceed, as one of the landowners has land from Richmond to Osgoode) more than 450 homes would be within the 2-km Turbine Zone.

Join our email list! ottawawindconcerns@yahoo.ca

MP demands halt to local wind project, says science lacking in decision

12 Tuesday Feb 2013

Posted by Ottawa Wind Concerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Bart Geleynse Jr, CanWEA, cost benefit wind power, Feed In Tariff Ontario, Health Canada wind turbine noise study, health effects wind farms, infrasound wind turbines, moratorium wind power projects, North Gower wind farm, North Gower wind power project, Ottawa wind concerns, Pierre Poilievre, Prowind, Richmond wind farm, Richmond wind power project

Nepean-Carleton MP Pierre Poilievre rose in the House of Commons yesterday to present a petition to the House on behalf of residents of North Gower and Richmond (communities within the City of Ottawa) where a 20-megawatt wind power project is proposed.

Poilievre’s petition demands a halt to the wind power generation project until the results of the Health Canada study on noise and infrasound has been completed, anticipated for the end of 2014. “Decisions must be science-based,” he told the House.

He noted that Minister of Health Leona Aglukkaq announced the revised study design February 10th.

Ottawa Wind Concerns is grateful for the MP’s support on this issue, and for bringing forward a solid foundation for the community’s concerns about this project, which will expose the people living in 450 homes to noise and vibration. In 2010, Rogers TV host Mark Sutcliffe asked then-company representative Bart Geleynse Jr whether the turbines in North Gower-Richmond area project would make noise. “Of course they will,” said Geleynse, “they’re power plants!”

Indeed.

And they don’t belong so close to families.

The wind power development lobby group CanWEA this week put out a news release saying that a survey showed 80% of the residents of Denmark questioned about wind power said they were not bothered by the wind turbines. In fact, 17% of the respondents said they were disturbed, with about 4% saying they were disturbed to a “major extent” and 5% “moderately” disturbed. In other words, almost 10% had their lives disrupted and their health affected by wind turbines.

“North Gower and Richmond are quiet communities that don’t deserve to be turned into a wind power factory,” says Jane Wilson, chair of Ottawa Wind Concerns. “The community doesn’t want this, our MP and MPP supports us and so do many on Council. It’s a completely inappropriate land use.”

Last year, MP Poilievre asked the Library of Parliament to look at the cost to taxpayers of the North Gower-Richmond power project, and discovered the cost in subsidies to ratepayers would be $4.8 million per year (a conservative estimate, we’re told).

In fact, subsidies to the wind power developers run $500,000 per turbine per year. Worse, Ontario doesn’t need any more power, and the intermittent nature of power produced by wind turbines is having a destabilizing effect on the grid, say Ontario’s electrical engineers, in their 2011 report.

The video of Pierre Poilievre’s statement in the House is here: http://www.pierremp.ca/petition-calls-for-a-moratorium-on-local-wind-project/

Email us at ottawawindconcerns@yahoo.ca

 

← Older posts
Newer posts →

Recent Posts

  • Energy Minister Stephen Lecce speaks out on renewable power sources wind and solar; emphasizes cost, reliability
  • Open letter to CAFES Ottawa
  • Ottawa Wind Concerns supports West Carleton residents
  • What does wind ‘farm’ construction really look like?
  • Unwilling Host communities surround Ottawa

Follow me on Twitter

My Tweets

Enter your email address to follow this blog and receive notifications of new posts by email.

Tags

Bob Chiarelli Green Energy Act IESO Ontario Ottawa Ottawa wind concerns wind energy wind farm wind power wind turbines

Contact us

PO Box 3 North Gower ON K0A 2T0

Blog at WordPress.com.

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Subscribe Subscribed
    • Ottawa Wind Concerns
    • Join 379 other subscribers
    • Already have a WordPress.com account? Log in now.
    • Ottawa Wind Concerns
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...