Another danger: lightning strikes

19 Friday Apr 2013

Posted by Ottawa Wind Concerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

cost benefit wind power, green wind power, wind farm North Gower, wind farm Richmond, wind farms, wind farms Ottawa, wind turbine safety, wind turbines

Lightning is a serious danger to wind turbines

 

With the tumultuous weather of the last few days, including a thunderstorm, one wonders, what happens to turbines in bad weather?

Answer: plenty.

Lightning strikes are commonplace and according to this article are responsible for 80% of the insurance claims for damage to turbine parts. They are also responsible for turbine equipment and blade fires. Read the article here: http://www.nachi.org/wind-turbines-lightning.htm

Note that the authors say the higher the turbine heights, the greater the risk of events. At 626 feet or 190 meters, the turbines proposed for North Gower-Richmond will be the tallest in North America. The turbines will be FOUR TIMES the height of the radio towers seen on prince of Wales Drive. (Why so high? Because there is NO WIND here on a regular basis, so they have to use taller equipment to catch what there is.)

A few weeks ago, a turbine caught fire near Goderich, Ontario. The wind power developer is now being criticized for a complete lack of safety controls (the supervisor drove around with his car window down to detect smoke) and for not notifying the municipality for more than 12 hours that a fire had occurred.

And of course, when equipment is on fire at that height, there is nothing you can do but let it burn and hope to control fires on the ground, caused by the flaming pieces. At Goderich, the debris was thrown 200 meters from the actual turbine tower.  Noxious smoke filled the air as the petrochemicals inside the nacelle burned.

But of course, wind power at this scale is “green” and “good” and helps the environment, says the industry lobby

Email us at ottawawindconcerns@gmail.com and donate please to help us cover legal costs and post box rental at PO Box 3, North Gower ON   K0A 2T0

Prowind’s North American corporate headquarters

18 Thursday Apr 2013

Posted by Ottawa Wind Concerns in Health, Ottawa, Renewable energy, Wind power

≈ 3 Comments

Tags

Boralex, CanWEA, East Oxford Alliance Against Turbines, Feed In Tariff Ontario, GE wind power, health effects wind turbine noise, health effects wind turbines, Jeffrey Segal, Juan Anderson, North Gower wind power project, Ottawa wind concerns, Prowind, Renewable Energy Approval process Ontario, Richmond wind farm, Richmond wind project, South Branch Wind Opposition group, wind farm North Gower

We have a treat for you today, a photo of Prowind’s Head Office in Hamilton. You may recall the original office was inside a building in Kemptville Ontario, where there was also a make-your-own-wine-and beer business. Well, now that Prowind (really headquartered in Germany) is consorting with the likes of EDP, GE and Boralex, they have come up in the world, and need to be closer to their huge projects in the Woodstock area.

The Hamilton office suite is also more convenient for President Jeffrey Segal. Mr Segal, by the way, once claimed that he lives near a turbine; on further questioning, it was revealed that he meant he lives in Toronto and has seen the Exhibition Place demonstration (joke) turbine. But he is experiencing no health effects or property value loss, and so far, all the non-participating receptors (they used to be called ‘neighbours’) are OK, too.

But we digress.

Here for your viewing pleasure, is a photo of the Prowind office location. Bear in mind that this is a company that is supposed to be preparing high-level engineering reports to attest to compliance with noise regulations and safety requirements, that will be assuring no impact on human health or the natural environment, and that assures municipalities there will be economic benefits.

They do it all from here:

Prowind HQ-Hamilton

Yup.

No sign of the dumpster into which all the letters from concerned citizens must go, but it’s probably there somewhere.

Email us at ottawawindconcerns@gmail.com and Follow us on Twitter at northgowerwind

Ottawa NOT a ‘willing host’ event Saturday April 6th

05 Friday Apr 2013

Posted by Ottawa Wind Concerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Bob Lyman, cost benefit wind power, health effects wind farms, health effects wind turbine noise, infrasound wind turbines, Lisa MacLeod, Not a Willing host, Ottawa wind concerns, South Branch Wind Opposition group, Wind Concerns Ontario, wind farm North Gower, wind farm Richmond, wind power project Ottawa

Print

NORTH GOWER-RICHMOND-BRINSTON NOT A “WILLING HOST” to giant wind power generation project.

News conference and peaceable demonstration Saturday April 6th, Ottawa City Hall, 2 PM, corner Elgin and Lisgar Streets, Human Rights monument

Speakers: Lisa MacLeod MPP, energy economist Bob Lyman, Wind Concerns Ontario president Jane Wilson

Organized by: Ottawa Wind Concerns, Wind Concerns Ontario, South Branch Wind Opposition Group

Wind power: $200 million a year to Ontario power customers

27 Wednesday Feb 2013

Posted by Ottawa Wind Concerns in Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

cost benefit wind power, cost wind power Ontario, electricity bills Ontario, Feed In Tariff program, FIT program, Pierre Poilievre, Toronto Star, wind farm North Gower, wind farm Richmond, wind power project Ottawa

In today’s Toronto Star (often a Liberal party mouthpiece) a story on how much Ontario’s decision to promote wind power at the expense of everything else, including hydro, is costing the people of Ontario $200 million per year. And yet, the province plans to triple the capacity… and thus triple the expense.

We can believe it: MP Pierre Poilievre commissioned the Library of Parliament to study the wind power project proposed for North Gower-Richmond and the results were that the project will cost Ontario ratepayers $4.8 million per year in subsidies. That amount doesn’t cover the cost of transmission lines (about a million per km) to service the project.

The story is here http://www.thestar.com/business/2013/02/26/surplus_wind_power_could_cost_ontario_ratepayers_up_to_200_million_ieso.html

Meanwhile, power rates climb. Ontario MPP Sylvia Jones rose in the Legislature today to tell of customers whose power bills are now higher than their mortgage bills, and of small business that are just giving up and closing down.

This is not a recipe for success in Ontario.

The Ontario government MUST halt all approvals of wind power projects now, and cancel the Feed In Tariff program. No choice about it.

Email us at ottawawindconcerns@gmail.com

Donations welcome at PO Box 3, North Gower ON  K0A 2T0

 

 

Mirror,mirror on the wall, who is the tallest building of all? (in Ottawa)

26 Tuesday Feb 2013

Posted by Ottawa Wind Concerns in Health, Ottawa, Renewable energy, Wind power

≈ 1 Comment

Tags

Gunn's Hill wind farm, how tall are wind turbines, Malakoff Road, Ottawa wind concerns, Prowind Canada, Prowind GmBH, RES Canada, tallest buildings Ottawa, turbine size, wind farm North Gower, wind farm Richmond, wind power North Gower

Recent news reports tell us that many residents of downtown Ottawa are disturbed by the prospect of a 42-storey condo tower in the Preston Street area. “Not in keeping” with the neighbourhood, they claim, and the condo tower would be the tallest building in Ottawa.

Not if the wind power project goes ahead.

The wind turbines specified by Prowind Canada (a subsidiary of Germany-based Prowind GmBH) are 190 meters or 626 feet tall. As power generating machines, they do make noise and produce vibration (infrasound), and they will be lit at night by aviation safety lights.

By comparison, the tallest building in Ottawa-Gatineau is Les Terrasses de la Chaudieres, but the second tallest, and tallest on the Ottawa side of the river is the Place de Ville Tower II at 367 feet or 112 meters. Prominent in the western portion of the city is Minto’s Metropole which towers the neighbourhood at 109 meters or 354 feet. The list of buildings is here: http://en.wikipedia.org/wiki/List_of_tallest_buildings_in_Ottawa%E2%80%93Gatineau

In other words, those tall buildings are but little specimens when compared to the industrial-scale wind turbines. Now, imagine too that those turbines will be placed next to a village of single family homes and farms—far too close for such huge structures, and far too close for the environmental noise and infrasound they will produce. (Prowind just announced that the capacity of turbines at its Gunn’s Hill project near Woodstock will be 2.89 megawatts.)

The photos on Prowind’s website depicting the impact of the turbines on the North Gower-Richmond area are misleading and duplicitous. As we have said before, the real view of the turbines from Malakoff Road would not be of some misty distant towers—you would not even be able to SEE the nacelle from that view.

We offer this information at the risk of having the wind power developer claim our objections are based on a dislike for the “look of them” and in the hope that by noting the true size of these machines, people–especially our city-dwelling friends and fellow citizens–will come to understand what is really happening when a wind power project is proposed: it is the invasion of a quiet community by a huge industrial project.

Email us at ottawawindconcerns@gmail.com

tallturbineview

Province knew about health effects in 2008

13 Wednesday Feb 2013

Posted by Ottawa Wind Concerns in Health, Renewable energy, Wind power

≈ 1 Comment

Tags

Amaranth, Dalton McGuinty, Green Energy Act, health effects wind farms, health effects wind turbine noise, health effects wind turbines, indirect health effects wind turbines, infrasound wind turbines, Lisa MacLeod, Melancthon, moratorium wind power projects, Orangeville, Ottawa wind concerns, Tim Hudak, wind farm North Gower, wind farm Richmond, wind farms Osgoode, wind farms Ottawa

At this point, no one is surprised that the Government of Ontario knew there was a potential for health impacts from wind turbine noise … but went ahead with its Green Energy and Green Economy Act anyway, which stripped away municipalities’ rights to plan local land use where “renewable” energy projects are concerned, and ride roughshod over the rights of citizens.

Here is an article from this week’s Niagara This Week which puts it all together.

The link is: http://www.niagarathisweek.com/

Province knew about health effects from turbines

Released documents show ministry aware of concerns as far back as 2006

 

Province knew about health effects from turbines. Documents released through a Freedom of Information request reveal the government was aware of adverse health effects caused by industrial wind turbines as far back as 2006. Toronto Star file photo

Documents released through a Freedom of Information request from an Orangeville resident reveal the government was aware of adverse health effects caused by industrial wind turbines as far back as 2006.

While Ontario Progressive Conservative leader Tim Hudak says he is not shocked to learn the government kept this information from the public in relation to the 200-megaWatt Melancthon EcoPower Centre (located in Amaranth and Melancthon Township, near Shelburne, Ont.), he says he is disappointed.

“I wasn’t surprised. Concerns have been raised across Ontario and in other jurisdictions,” says Hudak, whose own riding of Niagara West-Glanbrook is poised for the installation of several industrial wind turbines.

“What it is, is disappointing. It appears as through they were trying to cover something up.”

In the released document, ministry officials report “complaints of adverse health effects by area residents are for the most part justified.

“MOE Provincial Officers have attended at several of the complainant’s [sic] residences and have confirmed that despite the noise emissions apparently complying with the applicable standard … that the noise emissions are in fact causing material discomfort to the residents in and around their homes,” reads the document, written by provincial officer Gary Tomlinson.

According to the ministry, to develop the guidelines for noise limits, ministry scientists and engineers consulted with local community members and noise experts including representatives from major acoustical consulting firms. At the time of the Melancthon project, there were no minimum setback distances, only a provincial noise guideline of 40 decibels, which was maintained in the Act.

The documents state that “at least two families have moved out of their homes due to noise impacts” and that the MOE was aware of “at least six cases where the wind developer bought out resident’s [sic] homes to address and silence their ongoing concerns.”

Tomlinson writes, “reasonable people do not leave their homes to sleep elsewhere for frivolous reasons.”

Melancthon is Canada’s largest wind energy installation to date. Construction on phase one began in 2005, and phase two was completed in 2007. The project has a capacity close to 200 megawatts — roughly 30 megawatts less than the largest project proposed for West Lincoln by Niagara Region Wind Corp.

The Melancthon EcoPower Centre, made up of 133 turbines, was approved before the province passed its controversial Green Energy Act. The Act established a minimum setback distance of 550 metres between residential dwellings and turbines, which is 100 metres more than the minimum setback distance used in the Melancthon project.

Projects approved prior to the passing of the GEA had to meet provincial noise guidelines but the setback distance was to be negotiated between the developer and municipality.

The Melancthon turbines, however, are much smaller than those proposed for parts of West Lincoln. NRWC is proposing to erect 77, three-megaWatt turbines designed by Japanese manufacturer Enercon, which is building facilities in Niagara to manufacture both the towers and electrical components. Fourty-four of those turbines will be built in West Lincoln, three in Wainfleet and 31 in nearby Haldimand County. The concrete towers of these turbines measure to a maximum of 145 metres to the hub, about the length of 13 school buses stacked bumper to bumper. The blades stretch close to 50 metres, roughly another five school buses across.

The turbines used in the Melancthon project are 1.5 megawatts and are manufactured by GE. They measure 80 metres in height, with blades nearly 40 metres long.

While some local residents claim Enercon suggests a greater setback distance for the model being used by NRWC, a company spokesperson said she was unaware of it.

“Enercon has to sign off on everything we put forward,” said Randi Rahamim. “They have signed off on the full design.”

Hudak’s colleague, Huron-Bruce MPP Lisa Thompson, wants to know why the government moved ahead with the Green Energy Act when it was aware of health concerns.

“I’m absolutely disgusted,” said Thompson, who is the PC energy critic. “It’s sad, because, at the end of the day, it hurts that the Liberal government chose to play word games with people’s health. It comes back to my point of how and why did this Liberal government become so arrogant that they can blatantly play with people’s health just to further their own agenda.”

Thompson was further disappointed with the response from Ontario’s environment minister, St. Catharines MPP Jim Bradley, to a letter she sent to him Jan. 9 in light of the FOI information.

“His response was that there is no direct impact,” said Thompson. “Of course, the odds of a blade falling off and hitting someone are rare. But too many people have come forward with concerns, and their complaints have gone nowhere.

“This further emphasizes the need for a moratorium, which I have tabled twice now,” said the MPP whose own riding not only includes the Bruce Power nuclear energy plant but is poised to see 1,700-1,800 wind turbines primarily along the shoreline of Lake Huron.

Thompson said her office is getting ready to table a motion when the house resumes Feb. 19.

“I will continue to put forward efforts to make this government accountable,” said Thompson. “I am not going to let go of these redacted documents… They point to a larger problem of this Liberal government: it doesn’t matter who is in charge, hiding things and driving its own agenda on the taxpayer’s back. It’s got to stop.”

Despite several attempts to reach Bradley, he did not provide comment on the recently revealed document. His press secretary did provide the following: “The ministry is aware of health concerns and has reviewed literature on the potential impacts of wind turbines, including the 2010 report from Ontario’s Chief Medical Officer of Health which found there is no scientific evidence of a direct causal link between wind turbine noise and adverse health effects.

“The ministry will continue to review emerging scientific and engineering studies to ensure Ontario’s requirements remain in line with the best available science.”

The FOI documents pertain to an abatement plan the ministry put in place in relation to the Melancthon project. The ministry worked with both the municipality and wind developer to address concerns which resulted in several turbines being shut off at night and sound barriers being built around a transformer.

Hudak says it appeared ministry staff were trying to be forthcoming in their reports but that the government withheld that information.

“We need a moratorium on these projects,” said Hudak. “It’s been a position that I took up shortly after I became leader in 2009 for a number of reasons.”

Hudak’s issues with the Green Energy Act range from “expensive studies which fail basic economic sense” to how it strips away the decision-making powers of local governments.

Hudak and his PC government have called for several moratoriums on wind projects. In April 2010, at Queen’s Park, Hudak brought forward a bill to halt industrial wind turbine development. In March 2011, he was joined by West Lincoln Mayor Doug Joyner and Wainfleet Mayor April Jeffs at West Lincoln township hall to renew that call. This past June he was joined by his federal counterpart in the riding, MP Dean Allison, in demanding an immediate moratorium on industrial wind turbine development until a federal health study is complete.

Several other PC MPPs, including Thompson, have tabled similar motions.

The PC party will be introducing another motion when legislature resumes, both Hudak and Thompson confirmed.

“Lisa Thompson, in her capacity, brought forward motions in legislature for a moratorium. We will do that again, now that the house is back in after four months of inaction,” said Hudak, who has met with new Ontario Premier Kathleen Wynne.

“We discussed ideas for job creation and balancing the books. One recommendation I made was a moratorium on these types of projects,” Hudak said. “I’ve brought it to the premier, I hope she takes my advice.

“I’m not going to give up,” said Hudak. “I’m going to keep fighting for what I think is the right thing to do.”

…..

Note that in the North Gower-Richmond area (which is only the beginning if this project were to proceed, as one of the landowners has land from Richmond to Osgoode) more than 450 homes would be within the 2-km Turbine Zone.

Join our email list! ottawawindconcerns@yahoo.ca

Ottawa Wind Concerns chair awarded Jubilee medal

23 Friday Nov 2012

Posted by Ottawa Wind Concerns in Health, Ottawa, Wind power

≈ 3 Comments

Tags

health effects wind farms, health effects wind turbine noise, North Gower wind project, Ottawa wind project, Pierre Poilievre, Queen's Jubilee Medal, Wind Concerns Ontario, wind farm North Gower, wind farm Ottawa, wind farm petition, wind farm Richmond

Member of Parliament for Nepean-Carleton Pierre Poilievre gave Queen Elizabeth II Diamond Jubilee Medals to four community members  last evening. The MP said that too often, politics and media concentrate on urban life when he said, the rural communities are in many ways the backbone of Canada.

One of the awards went to Ottawa Wind Concerns chair Jane Wilson, who is also the president of Wind Concerns Ontario.

Mr Poilievre said in specific that the award was to acknowledge advocacy work to protect the health and safety of people living near industrial-scale wind power projects.

Several months ago, Mr Poilievre launched a petition to be taken to the House of Commons to ask for a halt to the Ottawa wind power project based in North Gower-Richmond, to wait until the results of health impact studies are available. (The petition is still availble for signing–contact us, or drop into the MP’s office at 250 Greenbank.)

He also commissioned an economic review of the project by the Library of Parliament, which found that the cost to taxpayers in Ontario for the power project would be $4.8 million, per year.

We are going to fight ON. And ON. It is not fair that an entire community should be affected by the decision of a few landowners to put profits before their community.

To donate–we need funds for ongoing legal advice–please send a cheque to PO Box 3 North Gower ON   K0A 2T0. To have your name added to our (confidential) email list, email us at ottawawindconcerns@yahoo.ca

Landowner with turbine lease: “I wouldn’t sign now”

05 Wednesday Sep 2012

Posted by Ottawa Wind Concerns in Health, Ottawa, Wind power

≈ 2 Comments

Tags

health effects wind farms, health effects wind power, infrasound wind turbines, landowners signing leases for wind farms, wind farm Britton, wind farm leases, wind farm Lisowel, wind farm North Gower, wind farm Richmond

One of the things we have heard from a number of communities is that landowners who signed options and then those options turned into leases for industrial-scale wind turbines, is that they wish they had learned more about the whole issue before they signed.

A lawyer told our community group, If landowners had had a lawyer read over some of those contracts, the advice would have been NOT to sign.

The reasons are several: you virtually give away all rights to your own land for 20 years and at the end of that time there is a first right of refusal. In the United States for example, the leases are written in such a way that they are really 60-year leases, not 20.

But what happens quickly is the community reaction when a landowner decides to put money first and sign on the dotted line. Neighbours of the leased property tend to object when they learn that their property values are going to plummet (this is true regardless of what the wind power industry claims), their community industrialized and, worst of all, they are at risk of being made ill by the environmental noise and infrasound.

Here is an account of one farm owner’s statements from the dairy-rich Listowel area of Ontario. Note that the farm-owner now believes he was misled by the wind power developer (Invenergy in this case).

A link to the full story follows.

Doug Hoshel, the Britton landowner who leased the three turbines in question, said his feelings towards wind turbines have certainly changed since he signed the contract with Invenergy last October.

“I would never sign one now, mainly because of what it’s done to the community,” Hoshel said. “There’s so many unanswered questions I wasn’t aware of when I signed.”

 The draft site plan also conflicts with Hoshel’s understanding of the project, which was described by Invenergy Canada as a low-density project with one turbine every 100 acres and no more than three turbines per rural block. The draft site plan now shows Hoshel with three turbines on his 100 acres farm, leaving him feeling like he was misled.

 “The last thing I want is for someone to get sick because of something that’s on my property,” Hoshel said. “I love this community, and I’m concerned about it.”

http://www.southwesternontario.ca/uncategorized/welfare-of-children-at-risk-due-to-wind-turbines-parents-say/

****PLEASE be sure to sign the petition put forward by Nepean-Carleton MP Pierre Poilievre, asking the Ontario government not to approve the North Gower-Richmond area of Ottawa wind power project, while the Health Canada study is ongoing. A copy of it is on this website under documents, or you can go to Mr Poilievre’s office at 250B Greenbank Rd and sign there.

Ottawa resident alleges fossil fuel industry ties

08 Wednesday Aug 2012

Posted by Ottawa Wind Concerns in Health, Ottawa, Wind power

≈ 1 Comment

Tags

Andy Braid, health effects wind power, health effects wind turbine noise, Lisa MacLeod, Manotick Messenger, moratorium wind power projects, North Gower wind power project, Pierre Poilievre, Richmond wind project, sound pressure wind turbines, Wind Concerns Ontario, wind farm North Gower, wind farm Ottawa, wind power project Kars

In the August 8th edition of The Manotick Messenger, Kars resident Andy Braid has a letter complaining about the paper’s coverage of the joint news conference held by Nepean-Carleton MPP Lisa MacLeod and MP Pierre Poilievre, calling for a moratorium on wind power project approvals until a proposed Health Canada study is done.

While complaining that citizens are “brainwashed” and practically calling CFRA listeners mouthbreathers, Braid actually claims that community groups opposed to industrial wind power projects are associated with the fossil fuel industry.

Alleging that a community group is “friends of the fossil fuel industry” Braid says:”It’s nothing short of surreal to watch the remarkably well-funded Wind Concerns Ontario whipping up paranoia amongst rural residents about the possible health implications of living too close to a propeller on a stick, all the while completely ignoring the proliferation of cellphone towers that are microwaving their children on a daily basis.”

We will not entertain Mr Braid’s fantasies further but simply use this letter as an example of how successful the huge wind power generation lobby group — worldwide –has been in marketing its utterly useless product.

Facts:

  • There is no evidence anywhere that wind power projects reduce greenhouse gas emissions.
  • Wind power actually requires back-up from traditional power sources, which is why Ontario is trying to build new natural gas plants. (Except the voters in key ridings don’t want them.)
  • The environmental noise and infrasound does cause health effects–that has been proven.
  • The fact that health problems may result from other sorts of power generation and–perhaps–cellphone towers is NO EXCUSE to inflict giant power generating machines on communities.

Mr Braid might be interested to know, however, that the reality of the proposed project for the North Gower and Richmond areas of Ottawa is that the proponents originally intended the project to go all the way over to Osgoode. In other words, through Kars. So, Mr Braid may have to read a little more widely and open his mind more, when he himself is faced with a giant, noise and vibration-producing, property value destroying “propeller” next door.

Email us at ottawawindconcerns@yahoo.ca and follow us on Twitter at northgowerwind

We are a corporate member of Wind Concerns Ontario; for more news daily, visit http://www.windconcernsontario.ca

Newer posts →

Recent Posts

  • Open letter to CAFES Ottawa
  • Ottawa Wind Concerns supports West Carleton residents
  • What does wind ‘farm’ construction really look like?
  • Unwilling Host communities surround Ottawa
  • How many birds do wind turbines kill?

Follow me on Twitter

My Tweets

Enter your email address to follow this blog and receive notifications of new posts by email.

Tags

Bob Chiarelli Green Energy Act IESO Ontario Ottawa Ottawa wind concerns wind energy wind farm wind power wind turbines

Contact us

PO Box 3 North Gower ON K0A 2T0

Create a free website or blog at WordPress.com.

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Subscribe Subscribed
    • Ottawa Wind Concerns
    • Join 379 other subscribers
    • Already have a WordPress.com account? Log in now.
    • Ottawa Wind Concerns
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...